The customer waiting time in an (R, s, Q) inventory system
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Antony Svoronos & Paul Zipkin, 1988. "Estimating the Performance of Multi-Level Inventory Systems," Operations Research, INFORMS, vol. 36(1), pages 57-72, February.
- Tempelmeier, Horst, 1985. "Inventory control using a service constraint on the expected customer order waiting time," European Journal of Operational Research, Elsevier, vol. 19(3), pages 313-323, March.
- F Janssen & R Heuts & T de Kok, 1999. "The impact of data collection on fill rate performance in the (R, s, Q) inventory model," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 50(1), pages 75-84, January.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Kevin H. Shang & Sean X. Zhou, 2010. "Optimal and Heuristic Echelon ( r, nQ, T ) Policies in Serial Inventory Systems with Fixed Costs," Operations Research, INFORMS, vol. 58(2), pages 414-427, April.
- Berling, Peter & Farvid, Mojtaba, 2014. "Lead-time investigation and estimation in divergent supply chains," International Journal of Production Economics, Elsevier, vol. 157(C), pages 177-189.
- Taher Ahmadi & Zümbül Atan & Ton Kok & Ivo Adan, 2020. "Time-based service constraints for inventory systems with commitment lead time," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 42(2), pages 355-395, June.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Hill, R.M. & Seifbarghy, M. & Smith, D.K., 2007. "A two-echelon inventory model with lost sales," European Journal of Operational Research, Elsevier, vol. 181(2), pages 753-766, September.
- Kull, Thomas & Closs, David, 2008. "The risk of second-tier supplier failures in serial supply chains: Implications for order policies and distributor autonomy," European Journal of Operational Research, Elsevier, vol. 186(3), pages 1158-1174, May.
- Chen, Frank Y. & Feng, Youyi & Simchi-Levi, David, 2002. "Uniform distribution of inventory positions in two-echelon periodic review systems with batch-ordering policies and interdependent demands," European Journal of Operational Research, Elsevier, vol. 140(3), pages 648-654, August.
- Andersson, Jonas & Marklund, Johan, 2000. "Decentralized inventory control in a two-level distribution system," European Journal of Operational Research, Elsevier, vol. 127(3), pages 483-506, December.
- Karaarslan, A.G. & Kiesmüller, G.P. & de Kok, A.G., 2013. "Analysis of an assemble-to-order system with different review periods," International Journal of Production Economics, Elsevier, vol. 143(2), pages 335-341.
- Berling, Peter & Farvid, Mojtaba, 2014. "Lead-time investigation and estimation in divergent supply chains," International Journal of Production Economics, Elsevier, vol. 157(C), pages 177-189.
- Chew, E. P. & Johnson, L. A., 1996. "Service level approximations for multiechelon inventory systems," European Journal of Operational Research, Elsevier, vol. 91(3), pages 440-455, June.
- Kogan, Konstantin, 2012. "Ship-to-order supplies: Contract breachability and the impact of a manufacturer-owned direct channel," European Journal of Operational Research, Elsevier, vol. 218(1), pages 113-123.
- Heuts, R.M.J. & Luijten, M.L.J., 1999. "Inventory Modelling for a Manufacturer of Sweets : An Evaluation of an Adjusted Compund Renewal Approach for B-Items With A Relative Short Production Lead Time," Discussion Paper 1999-80, Tilburg University, Center for Economic Research.
- Nair, Anand & Closs, David J., 2006. "An examination of the impact of coordinating supply chain policies and price markdowns on short lifecycle product retail performance," International Journal of Production Economics, Elsevier, vol. 102(2), pages 379-392, August.
- Axsater, Sven & Zhang, Wen-Fa, 1999. "A joint replenishment policy for multi-echelon inventory control," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 243-250, March.
- Heuts, R.M.J. & Luijten, M.L.J., 1999. "Inventory Modelling for a Manufacturer of Sweets : An Evaluation of an Adjusted Compund Renewal Approach for B-Items With A Relative Short Production Lead Time," Other publications TiSEM 8a22bfcb-d72a-4dc8-97b3-b, Tilburg University, School of Economics and Management.
- Thonemann, Ulrich W. & Bradley, James R., 2002. "The effect of product variety on supply-chain performance," European Journal of Operational Research, Elsevier, vol. 143(3), pages 548-569, December.
- Taher Ahmadi & Zümbül Atan & Ton Kok & Ivo Adan, 2020. "Time-based service constraints for inventory systems with commitment lead time," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 42(2), pages 355-395, June.
- Guo, Cong & Li, Xueping, 2014. "A multi-echelon inventory system with supplier selection and order allocation under stochastic demand," International Journal of Production Economics, Elsevier, vol. 151(C), pages 37-47.
- Thangam, A. & Uthayakumar, R., 2008. "A two-level supply chain with partial backordering and approximated Poisson demand," European Journal of Operational Research, Elsevier, vol. 187(1), pages 228-242, May.
- Gérard P. Cachon, 2001. "Stock Wars: Inventory Competition in a Two-Echelon Supply Chain with Multiple Retailers," Operations Research, INFORMS, vol. 49(5), pages 658-674, October.
- Berling, Peter & Marklund, Johan, 2013. "A model for heuristic coordination of real life distribution inventory systems with lumpy demand," European Journal of Operational Research, Elsevier, vol. 230(3), pages 515-526.
- Al-Rifai, Mohammad H. & Rossetti, Manuel D., 2007. "An efficient heuristic optimization algorithm for a two-echelon (R, Q) inventory system," International Journal of Production Economics, Elsevier, vol. 109(1-2), pages 195-213, September.
- Diks, E. B. & de Kok, A. G. & Lagodimos, A. G., 1996. "Multi-echelon systems: A service measure perspective," European Journal of Operational Research, Elsevier, vol. 95(2), pages 241-263, December.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:104:y:2006:i:2:p:354-364. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.