IDEAS home Printed from https://ideas.repec.org/a/spr/joinma/v30y2019i2d10.1007_s10845-016-1273-3.html
   My bibliography  Save this article

Outsourcing optimization in two-echelon supply chain network under integrated production-maintenance constraints

Author

Listed:
  • Mohammed Haoues

    (Batna 2 University)

  • Mohammed Dahane

    (Université de Lorraine
    Production and Maintenance)

  • Nadia Kenza Mouss

    (Batna 2 University)

Abstract

In this paper, we study a two-echelon supply chain network consisting of multi-outsourcers and multi-subcontractors. Each one is composed of a failure-prone production unit that produces a single product to fulfil market demands with variable production rates. Sometimes the manufacturing systems are not able to satisfy demand; in this case, outsourcing option is adopted to improve the limited in-house production capacity. The outsourcing is not justified by the production lack of manufacturing systems, but is also considered for the costs minimization issues. In the considered problem, we assume that the failure rate is dependent on the time and production rate. Preventive maintenance activities can be conducted to mitigate the deterioration effects, and minimal repairs are performed when unplanned failures occurs. We consider that the production cost depends on the rate of the machine utilization. The aim of this research is to propose a joint policy based on a mixed integer programming formulation to balance the trade-off between two-echelon of supply chain. We seek to assist outsourcers to determine the integrated in-house/ outsourcing, and maintenance plans, and the subcontractors to determine the integrated production-maintenance plans so that the benefit of the supply chain is maximized over a finite planning horizon. We develop an improved optimization procedure based on the genetic algorithms, and we discuss and conduct computational experiments to study the managerial insights for the developed framework.

Suggested Citation

  • Mohammed Haoues & Mohammed Dahane & Nadia Kenza Mouss, 2019. "Outsourcing optimization in two-echelon supply chain network under integrated production-maintenance constraints," Journal of Intelligent Manufacturing, Springer, vol. 30(2), pages 701-725, February.
  • Handle: RePEc:spr:joinma:v:30:y:2019:i:2:d:10.1007_s10845-016-1273-3
    DOI: 10.1007/s10845-016-1273-3
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1007/s10845-016-1273-3
    File Function: Abstract
    Download Restriction: Access to the full text of the articles in this series is restricted.

    File URL: https://libkey.io/10.1007/s10845-016-1273-3?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Fitouhi, Mohamed-Chahir & Nourelfath, Mustapha, 2012. "Integrating noncyclical preventive maintenance scheduling and production planning for a single machine," International Journal of Production Economics, Elsevier, vol. 136(2), pages 344-351.
    2. Gabriella Budai & Rommert Dekker & Robin P. Nicolai, 2008. "Maintenance and Production: A Review of Planning Models," Springer Series in Reliability Engineering, in: Complex System Maintenance Handbook, chapter 13, pages 321-344, Springer.
    3. Gunasekaran, Angappa & Irani, Zahir & Choy, King-Lun & Filippi, Lionel & Papadopoulos, Thanos, 2015. "Performance measures and metrics in outsourcing decisions: A review for research and applications," International Journal of Production Economics, Elsevier, vol. 161(C), pages 153-166.
    4. Aghezzaf, E.H. & Jamali, M.A. & Ait-Kadi, D., 2007. "An integrated production and preventive maintenance planning model," European Journal of Operational Research, Elsevier, vol. 181(2), pages 679-685, September.
    5. Bertrand, J. W. M. & Sridharan, V., 2001. "A study of simple rules for subcontracting in make-to-order manufacturing," European Journal of Operational Research, Elsevier, vol. 128(3), pages 509-531, February.
    6. Thomas, Douglas J. & Griffin, Paul M., 1996. "Coordinated supply chain management," European Journal of Operational Research, Elsevier, vol. 94(1), pages 1-15, October.
    7. Abdel-Malek, Layek & Kullpattaranirun, Tarathorn & Nanthavanij, Suebsak, 2005. "A framework for comparing outsourcing strategies in multi-layered supply chains," International Journal of Production Economics, Elsevier, vol. 97(3), pages 318-328, September.
    8. Saharidis, Georgios K.D. & Kouikoglou, Vassilis S. & Dallery, Yves, 2009. "Centralized and decentralized control polices for a two-stage stochastic supply chain with subcontracting," International Journal of Production Economics, Elsevier, vol. 117(1), pages 117-126, January.
    9. J. Behnamian & S. M. T. Fatemi Ghomi, 2016. "A survey of multi-factory scheduling," Journal of Intelligent Manufacturing, Springer, vol. 27(1), pages 231-249, February.
    10. Lee, Shine-Der & Lan, Shu-Chuan, 2013. "Production lot sizing with a secondary outsourcing facility," International Journal of Production Economics, Elsevier, vol. 141(1), pages 414-424.
    11. Boulaksil, Youssef & Fransoo, Jan C., 2009. "Order release strategies to control outsourced operations in a supply chain," International Journal of Production Economics, Elsevier, vol. 119(1), pages 149-160, May.
    12. Nakagawa, T. & Mizutani, S., 2009. "A summary of maintenance policies for a finite interval," Reliability Engineering and System Safety, Elsevier, vol. 94(1), pages 89-96.
    13. Rivera-Gómez, Héctor & Gharbi, Ali & Kenné, Jean-Pierre & Montaño-Arango, Oscar & Hernandez-Gress, Eva Selene, 2016. "Production control problem integrating overhaul and subcontracting strategies for a quality deteriorating manufacturing system," International Journal of Production Economics, Elsevier, vol. 171(P1), pages 134-150.
    14. Ni, Debing & Li, Kevin W. & Tang, Xiaowo, 2009. "Production costs, scope economies, and multi-client outsourcing under quantity competition," International Journal of Production Economics, Elsevier, vol. 121(1), pages 130-140, September.
    15. Budai-Balke, G. & Dekker, R. & Nicolai, R.P., 2006. "A review of planning models for maintenance and production," Econometric Institute Research Papers EI 2006-44, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
    16. Lee, Kangbok & Choi, Byung-Cheon, 2011. "Two-stage production scheduling with an outsourcing option," European Journal of Operational Research, Elsevier, vol. 213(3), pages 489-497, September.
    17. Qi, Xiangtong, 2011. "Outsourcing and production scheduling for a two-stage flow shop," International Journal of Production Economics, Elsevier, vol. 129(1), pages 43-50, January.
    18. Dellaert, N. & Jeunet, J. & Jonard, N., 2000. "A genetic algorithm to solve the general multi-level lot-sizing problem with time-varying costs," International Journal of Production Economics, Elsevier, vol. 68(3), pages 241-257, December.
    19. Nidhal Rezg & Sofiene Dellagi & Abdelhakim Khatab, 2014. "Joint Optimization of Maintenance and Production Policies," Post-Print hal-01513938, HAL.
    20. Kim, Bowon, 2003. "Dynamic outsourcing to contract manufacturers with different capabilities of reducing the supply cost," International Journal of Production Economics, Elsevier, vol. 86(1), pages 63-80, October.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Muhammad Ameer & Mohammed Dahane, 2023. "Reconfigurability improvement in Industry 4.0: a hybrid genetic algorithm-based heuristic approach for a co-generation of setup and process plans in a reconfigurable environment," Journal of Intelligent Manufacturing, Springer, vol. 34(3), pages 1445-1467, March.
    2. A. Khatab & C. Diallo & E.-H. Aghezzaf & U. Venkatadri, 2022. "Optimization of the integrated fleet-level imperfect selective maintenance and repairpersons assignment problem," Journal of Intelligent Manufacturing, Springer, vol. 33(3), pages 703-718, March.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Jiawen Hu & Zuhua Jiang & Hong Wang, 2017. "Joint Optimization of Production Plan and Preventive Maintenance Schedule by Stackelberg Game," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 34(04), pages 1-28, August.
    2. Thürer, Matthias & Stevenson, Mark & Qu, Ting & Godinho Filho, Moacir, 2014. "The design of simple subcontracting rules for make-to-order shops: An assessment by simulation," European Journal of Operational Research, Elsevier, vol. 239(3), pages 854-864.
    3. Fitouhi, Mohamed-Chahir & Nourelfath, Mustapha, 2014. "Integrating noncyclical preventive maintenance scheduling and production planning for multi-state systems," Reliability Engineering and System Safety, Elsevier, vol. 121(C), pages 175-186.
    4. Gunasekaran, Angappa & Irani, Zahir & Choy, King-Lun & Filippi, Lionel & Papadopoulos, Thanos, 2015. "Performance measures and metrics in outsourcing decisions: A review for research and applications," International Journal of Production Economics, Elsevier, vol. 161(C), pages 153-166.
    5. Lee, Ik Sun & Sung, C.S., 2008. "Single machine scheduling with outsourcing allowed," International Journal of Production Economics, Elsevier, vol. 111(2), pages 623-634, February.
    6. Chung, Dae-Young & Choi, Byung-Cheon, 2013. "Outsourcing and scheduling for two-machine ordered flow shop scheduling problems," European Journal of Operational Research, Elsevier, vol. 226(1), pages 46-52.
    7. Aghezzaf, El-Houssaine & Khatab, Abdelhakim & Tam, Phuoc Le, 2016. "Optimizing production and imperfect preventive maintenance planning׳s integration in failure-prone manufacturing systems," Reliability Engineering and System Safety, Elsevier, vol. 145(C), pages 190-198.
    8. Hsiao, H.I. & Kemp, R.G.M. & van der Vorst, J.G.A.J. & (Onno) Omta, S.W.F., 2010. "A classification of logistic outsourcing levels and their impact on service performance: Evidence from the food processing industry," International Journal of Production Economics, Elsevier, vol. 124(1), pages 75-86, March.
    9. Zhen, Lu, 2014. "A three-stage optimization model for production and outsourcing under China’s export-oriented tax policies," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 69(C), pages 1-20.
    10. Li, Yantong & Chu, Feng & Chu, Chengbin & Zhu, Zhanguo, 2019. "An efficient three-level heuristic for the large-scaled multi-product production routing problem with outsourcing," European Journal of Operational Research, Elsevier, vol. 272(3), pages 914-927.
    11. Absi, Nabil & van den Heuvel, Wilco & Dauzère-Pérès, Stéphane, 2024. "Complexity analysis of integrated dynamic lot sizing and maintenance planning problems," European Journal of Operational Research, Elsevier, vol. 318(1), pages 100-109.
    12. Fitouhi, Mohamed-Chahir & Nourelfath, Mustapha, 2012. "Integrating noncyclical preventive maintenance scheduling and production planning for a single machine," International Journal of Production Economics, Elsevier, vol. 136(2), pages 344-351.
    13. Fahimeh Shamsaei & Mathieu Vyve, 2017. "Solving integrated production and condition-based maintenance planning problems by MIP modeling," Flexible Services and Manufacturing Journal, Springer, vol. 29(2), pages 184-202, June.
    14. Polotski, V. & Kenne, J.-P. & Gharbi, A., 2019. "Joint production and maintenance optimization in flexible hybrid Manufacturing–Remanufacturing systems under age-dependent deterioration," International Journal of Production Economics, Elsevier, vol. 216(C), pages 239-254.
    15. Han, Chaodong & Porterfield, Tobin & Li, Xiaolin, 2012. "Impact of industry competition on contract manufacturing: An empirical study of U.S. manufacturers," International Journal of Production Economics, Elsevier, vol. 138(1), pages 159-169.
    16. Esmaeil MEHDIZADEH & Amir Aydin Atashi ABKENAR, 2014. "Harmony Search Algorithm For Solvingâ Two Aggregate Production Planning Models With Breakdowns And Maintenance," Proceedings of the INTERNATIONAL MANAGEMENT CONFERENCE, Faculty of Management, Academy of Economic Studies, Bucharest, Romania, vol. 8(1), pages 306-320, November.
    17. Liu, Yu & Zhang, Qin & Ouyang, Zhiyuan & Huang, Hong-Zhong, 2021. "Integrated production planning and preventive maintenance scheduling for synchronized parallel machines," Reliability Engineering and System Safety, Elsevier, vol. 215(C).
    18. Jianfeng Ren & Guo Sun & Yuzhong Zhang, 2017. "The Supplying Chain Scheduling with Outsourcing and Transportation," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 34(02), pages 1-13, April.
    19. Yilmaz, Ibrahim & Yoon, Sang Won & Seok, Hyesung, 2017. "A framework and algorithm for fair demand and capacity sharing in collaborative networks," International Journal of Production Economics, Elsevier, vol. 193(C), pages 137-147.
    20. Shi, Yi & Deng, Yawen & Wang, Guoan & Xu, Jiuping, 2020. "Stackelberg equilibrium-based eco-economic approach for sustainable development of kitchen waste disposal with subsidy policy: A case study from China," Energy, Elsevier, vol. 196(C).

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:joinma:v:30:y:2019:i:2:d:10.1007_s10845-016-1273-3. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.