Scheduling problems with multiple maintenance activities and non-preemptive jobs on two identical parallel machines
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Allaoui, H. & Artiba, A. & Elmaghraby, S.E. & Riane, F., 2006. "Scheduling of a two-machine flowshop with availability constraints on the first machine," International Journal of Production Economics, Elsevier, vol. 99(1-2), pages 16-27, February.
- Alsyouf, Imad, 2007. "The role of maintenance in improving companies' productivity and profitability," International Journal of Production Economics, Elsevier, vol. 105(1), pages 70-78, January.
- Asano, Makoto & Ohta, Hiroshi, 1999. "Single machine scheduling to meet due times under shutdown constraints," International Journal of Production Economics, Elsevier, vol. 60(1), pages 537-547, April.
- W J Chen, 2006. "Minimizing total flow time in the single-machine scheduling problem with periodic maintenance," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 57(4), pages 410-415, April.
- Pinjala, Srinivas Kumar & Pintelon, Liliane & Vereecke, Ann, 2006. "An empirical investigation on the relationship between business and maintenance strategies," International Journal of Production Economics, Elsevier, vol. 104(1), pages 214-229, November.
- Alsyouf, Imad, 2009. "Maintenance practices in Swedish industries: Survey results," International Journal of Production Economics, Elsevier, vol. 121(1), pages 212-223, September.
- Allaoui, H. & Lamouri, S. & Artiba, A. & Aghezzaf, E., 2008. "Simultaneously scheduling n jobs and the preventive maintenance on the two-machine flow shop to minimize the makespan," International Journal of Production Economics, Elsevier, vol. 112(1), pages 161-167, March.
- X Qi & T Chen & F Tu, 1999. "Scheduling the maintenance on a single machine," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 50(10), pages 1071-1078, October.
- Dowlatshahi, Shad, 2008. "The role of industrial maintenance in the maquiladora industry: An empirical analysis," International Journal of Production Economics, Elsevier, vol. 114(1), pages 298-307, July.
- Akturk, M. Selim & Ghosh, Jay B. & Gunes, Evrim D., 2004. "Scheduling with tool changes to minimize total completion time: Basic results and SPT performance," European Journal of Operational Research, Elsevier, vol. 157(3), pages 784-790, September.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Xu, Dehua & Wan, Long & Liu, Aihua & Yang, Dar-Li, 2015. "Single machine total completion time scheduling problem with workload-dependent maintenance duration," Omega, Elsevier, vol. 52(C), pages 101-106.
- Liliana Grigoriu & Dirk Briskorn, 2017. "Scheduling jobs and maintenance activities subject to job-dependent machine deteriorations," Journal of Scheduling, Springer, vol. 20(2), pages 183-197, April.
- Hanane Krim & Nicolas Zufferey & Jean-Yves Potvin & Rachid Benmansour & David Duvivier, 2022. "Tabu search for a parallel-machine scheduling problem with periodic maintenance, job rejection and weighted sum of completion times," Journal of Scheduling, Springer, vol. 25(1), pages 89-105, February.
- Boccia, Maurizio & Masone, Adriano & Sterle, Claudio & Murino, Teresa, 2023. "The parallel AGV scheduling problem with battery constraints: A new formulation and a matheuristic approach," European Journal of Operational Research, Elsevier, vol. 307(2), pages 590-603.
- Tan, Zhiyi & Chen, Yong & Zhang, An, 2013. "On the exact bounds of SPT for scheduling on parallel machines with availability constraints," International Journal of Production Economics, Elsevier, vol. 146(1), pages 293-299.
- Cheng, Yung-Hsiang & Tsao, Hou-Lei, 2010. "Rolling stock maintenance strategy selection, spares parts' estimation, and replacements' interval calculation," International Journal of Production Economics, Elsevier, vol. 128(1), pages 404-412, November.
- Tambe, Pravin P. & Kulkarni, Makarand S., 2022. "A reliability based integrated model of maintenance planning with quality control and production decision for improving operational performance," Reliability Engineering and System Safety, Elsevier, vol. 226(C).
- Xu, Dehua & Liu, Min & Yin, Yunqiang & Hao, Jinghua, 2013. "Scheduling tool changes and special jobs on a single machine to minimize makespan," Omega, Elsevier, vol. 41(2), pages 299-304.
- Wenchang Luo & Yao Xu & Weitian Tong & Guohui Lin, 2019. "Single-machine scheduling with job-dependent machine deterioration," Journal of Scheduling, Springer, vol. 22(6), pages 691-707, December.
- Shijin Wang & Ming Liu, 2016. "Two-machine flow shop scheduling integrated with preventive maintenance planning," International Journal of Systems Science, Taylor & Francis Journals, vol. 47(3), pages 672-690, February.
- Zhou, Xiaojun & Lu, Zhiqiang & Xi, Lifeng, 2012. "Preventive maintenance optimization for a multi-component system under changing job shop schedule," Reliability Engineering and System Safety, Elsevier, vol. 101(C), pages 14-20.
- Geurtsen, M. & Didden, Jeroen B.H.C. & Adan, J. & Atan, Z. & Adan, I., 2023. "Production, maintenance and resource scheduling: A review," European Journal of Operational Research, Elsevier, vol. 305(2), pages 501-529.
- Xia, Tangbin & Jin, Xiaoning & Xi, Lifeng & Ni, Jun, 2015. "Production-driven opportunistic maintenance for batch production based on MAM–APB scheduling," European Journal of Operational Research, Elsevier, vol. 240(3), pages 781-790.
- Zheng, Feifeng & Cheng, Yongxi & Xu, Yinfeng & Liu, Ming, 2013. "Competitive strategies for an online generalized assignment problem with a service consecution constraint," European Journal of Operational Research, Elsevier, vol. 229(1), pages 59-66.
- Li, Guo & Liu, Mengqi & Sethi, Suresh P. & Xu, Dehua, 2017. "Parallel-machine scheduling with machine-dependent maintenance periodic recycles," International Journal of Production Economics, Elsevier, vol. 186(C), pages 1-7.
- Sandeep Kumar & Bhupesh Kumar Lad, 2017. "Integrated production and maintenance planning for parallel machine system considering cost of rejection," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 68(7), pages 834-846, July.
- Mor, Baruch & Mosheiov, Gur, 2012. "Scheduling a maintenance activity and due-window assignment based on common flow allowance," International Journal of Production Economics, Elsevier, vol. 135(1), pages 222-230.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- García Alcaraz Jorge Luis & Romero González Jaime & Noriega Morales Salvador, 2012. "El éxito del mantenimiento productivo total y su relación con los factores administrativos," Contaduría y Administración, Accounting and Management, vol. 57(4), pages 173-196, octubre-d.
- Kacem, Imed & Chu, Chengbin, 2008. "Efficient branch-and-bound algorithm for minimizing the weighted sum of completion times on a single machine with one availability constraint," International Journal of Production Economics, Elsevier, vol. 112(1), pages 138-150, March.
- Jing Fan & Xiwen Lu, 2015. "Supply chain scheduling problem in the hospital with periodic working time on a single machine," Journal of Combinatorial Optimization, Springer, vol. 30(4), pages 892-905, November.
- Xu, Dehua & Liu, Min & Yin, Yunqiang & Hao, Jinghua, 2013. "Scheduling tool changes and special jobs on a single machine to minimize makespan," Omega, Elsevier, vol. 41(2), pages 299-304.
- Hanane Krim & Rachid Benmansour & David Duvivier & Daoud Aït-Kadi & Said Hanafi, 2020. "Heuristics for the single machine weighted sum of completion times scheduling problem with periodic maintenance," Computational Optimization and Applications, Springer, vol. 75(1), pages 291-320, January.
- Hnaien, Faicel & Yalaoui, Farouk & Mhadhbi, Ahmed, 2015. "Makespan minimization on a two-machine flowshop with an availability constraint on the first machine," International Journal of Production Economics, Elsevier, vol. 164(C), pages 95-104.
- Xu, Dehua & Wan, Long & Liu, Aihua & Yang, Dar-Li, 2015. "Single machine total completion time scheduling problem with workload-dependent maintenance duration," Omega, Elsevier, vol. 52(C), pages 101-106.
- Imed Kacem, 2009. "Approximation algorithms for the makespan minimization with positive tails on a single machine with a fixed non-availability interval," Journal of Combinatorial Optimization, Springer, vol. 17(2), pages 117-133, February.
- Janak Priyantha, 2021. "Literature Review: The Role of Organizational Factors in Maintenance Organizations Affecting Their Manufacturing Performance, From Sri Lankan Cultural Perspective," International Journal of Research and Innovation in Social Science, International Journal of Research and Innovation in Social Science (IJRISS), vol. 5(4), pages 353-366, April.
- Priyank Srivastava & Dinesh Khanduja & V. P. Agrawal, 2020. "Agile maintenance attribute coding and evaluation based decision making in sugar manufacturing plant," OPSEARCH, Springer;Operational Research Society of India, vol. 57(2), pages 553-583, June.
- Chen, Wen-Jinn, 2009. "Minimizing number of tardy jobs on a single machine subject to periodic maintenance," Omega, Elsevier, vol. 37(3), pages 591-599, June.
- Wolter, Anja & Helber, Stefan, 2013. "Simultaneous Production and Maintenance Planning for a Single Capacitated Resource facing both a Dynamic Demand and Intensive Wear and Tear," Hannover Economic Papers (HEP) dp-522, Leibniz Universität Hannover, Wirtschaftswissenschaftliche Fakultät.
- Shijin Wang & Ming Liu, 2016. "Two-machine flow shop scheduling integrated with preventive maintenance planning," International Journal of Systems Science, Taylor & Francis Journals, vol. 47(3), pages 672-690, February.
- J S Chen, 2006. "Single-machine scheduling with flexible and periodic maintenance," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 57(6), pages 703-710, June.
- Xia, Tangbin & Jin, Xiaoning & Xi, Lifeng & Ni, Jun, 2015. "Production-driven opportunistic maintenance for batch production based on MAM–APB scheduling," European Journal of Operational Research, Elsevier, vol. 240(3), pages 781-790.
- Alsyouf, Imad, 2009. "Maintenance practices in Swedish industries: Survey results," International Journal of Production Economics, Elsevier, vol. 121(1), pages 212-223, September.
- Dowlatshahi, Shad, 2008. "The role of industrial maintenance in the maquiladora industry: An empirical analysis," International Journal of Production Economics, Elsevier, vol. 114(1), pages 298-307, July.
- Chen, Jen-Shiang, 2008. "Optimization models for the tool change scheduling problem," Omega, Elsevier, vol. 36(5), pages 888-894, October.
- Zhijun Xu & Dehua Xu, 2018. "Single-machine scheduling with workload-dependent tool change durations and equal processing time jobs to minimize total completion time," Journal of Scheduling, Springer, vol. 21(4), pages 461-482, August.
- Kacem, Imed & Chu, Chengbin, 2008. "Worst-case analysis of the WSPT and MWSPT rules for single machine scheduling with one planned setup period," European Journal of Operational Research, Elsevier, vol. 187(3), pages 1080-1089, June.
More about this item
Keywords
Scheduling Two parallel machine Makespan Total completion time Multiple maintenance Bin-packing problem;Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:124:y:2010:i:1:p:151-158. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.