Integrated production and maintenance planning for parallel machine system considering cost of rejection
Author
Abstract
Suggested Citation
DOI: 10.1057/jors.2016.46
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Wen-Chiung Lee & Jen-Ya Wang & Lin-Yo Lee, 2015. "A hybrid genetic algorithm for an identical parallel-machine problem with maintenance activity," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 66(11), pages 1906-1918, November.
- Jeang, Angus, 2012. "Simultaneous determination of production lot size and process parameters under process deterioration and process breakdown," Omega, Elsevier, vol. 40(6), pages 774-781.
- Laith A. Hadidi & Umar M. Al-Turki & M. Abdur Rahim, 2011. "An integrated cost model for production scheduling and perfect maintenance," International Journal of Mathematics in Operational Research, Inderscience Enterprises Ltd, vol. 3(4), pages 395-413.
- Liao, Ching-Jong & Shyur, Der-Lin & Lin, Chien-Hung, 2005. "Makespan minimization for two parallel machines with an availability constraint," European Journal of Operational Research, Elsevier, vol. 160(2), pages 445-456, January.
- X Qi & T Chen & F Tu, 1999. "Scheduling the maintenance on a single machine," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 50(10), pages 1071-1078, October.
- Sun, Kaibiao & Li, Hongxing, 2010. "Scheduling problems with multiple maintenance activities and non-preemptive jobs on two identical parallel machines," International Journal of Production Economics, Elsevier, vol. 124(1), pages 151-158, March.
- Linderman, Kevin & McKone-Sweet, Kathleen E. & Anderson, John C., 2005. "An integrated systems approach to process control and maintenance," European Journal of Operational Research, Elsevier, vol. 164(2), pages 324-340, July.
- Wang, Xiuli & Cheng, T.C.E., 2015. "A heuristic for scheduling jobs on two identical parallel machines with a machine availability constraint," International Journal of Production Economics, Elsevier, vol. 161(C), pages 74-82.
- Kuo, Yarlin, 2006. "Optimal adaptive control policy for joint machine maintenance and product quality control," European Journal of Operational Research, Elsevier, vol. 171(2), pages 586-597, June.
- Divya Pandey & Makarand S. Kulkarni & Prem Vrat, 2010. "A model for optimal maintenance interval incorporating the cost of rejections in manufacturing," Journal of Advances in Management Research, Emerald Group Publishing Limited, vol. 7(2), pages 219-232, October.
- C-J Liao & C-M Chen & C-H Lin, 2007. "Minimizing makespan for two parallel machines with job limit on each availability interval," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 58(7), pages 938-947, July.
- Sadfi, Cherif & Penz, Bernard & Rapine, Christophe & Blazewicz, Jacek & Formanowicz, Piotr, 2005. "An improved approximation algorithm for the single machine total completion time scheduling problem with availability constraints," European Journal of Operational Research, Elsevier, vol. 161(1), pages 3-10, February.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Xiang, Yisha, 2013. "Joint optimization of X¯ control chart and preventive maintenance policies: A discrete-time Markov chain approach," European Journal of Operational Research, Elsevier, vol. 229(2), pages 382-390.
- Xu, Dehua & Liu, Min & Yin, Yunqiang & Hao, Jinghua, 2013. "Scheduling tool changes and special jobs on a single machine to minimize makespan," Omega, Elsevier, vol. 41(2), pages 299-304.
- Shabtay, Dvir, 2022. "Single-machine scheduling with machine unavailability periods and resource dependent processing times," European Journal of Operational Research, Elsevier, vol. 296(2), pages 423-439.
- Hanane Krim & Rachid Benmansour & David Duvivier & Daoud Aït-Kadi & Said Hanafi, 2020. "Heuristics for the single machine weighted sum of completion times scheduling problem with periodic maintenance," Computational Optimization and Applications, Springer, vol. 75(1), pages 291-320, January.
- Tan, Zhiyi & Chen, Yong & Zhang, An, 2013. "On the exact bounds of SPT for scheduling on parallel machines with availability constraints," International Journal of Production Economics, Elsevier, vol. 146(1), pages 293-299.
- Xiang Wu & Kanjian Zhang & Ming Cheng, 2017. "Computational method for optimal machine scheduling problem with maintenance and production," International Journal of Production Research, Taylor & Francis Journals, vol. 55(6), pages 1791-1814, March.
- Geurtsen, M. & Didden, Jeroen B.H.C. & Adan, J. & Atan, Z. & Adan, I., 2023. "Production, maintenance and resource scheduling: A review," European Journal of Operational Research, Elsevier, vol. 305(2), pages 501-529.
- Shabtay, Dvir & Zofi, Moshe, 2018. "Single machine scheduling with controllable processing times and an unavailability period to minimize the makespan," International Journal of Production Economics, Elsevier, vol. 198(C), pages 191-200.
- Xu, Dehua & Wan, Long & Liu, Aihua & Yang, Dar-Li, 2015. "Single machine total completion time scheduling problem with workload-dependent maintenance duration," Omega, Elsevier, vol. 52(C), pages 101-106.
- Boccia, Maurizio & Masone, Adriano & Sterle, Claudio & Murino, Teresa, 2023. "The parallel AGV scheduling problem with battery constraints: A new formulation and a matheuristic approach," European Journal of Operational Research, Elsevier, vol. 307(2), pages 590-603.
- Li, Guo & Liu, Mengqi & Sethi, Suresh P. & Xu, Dehua, 2017. "Parallel-machine scheduling with machine-dependent maintenance periodic recycles," International Journal of Production Economics, Elsevier, vol. 186(C), pages 1-7.
- Ho, Linda Lee & Quinino, Roberto C., 2012. "Integrating on-line process control and imperfect corrective maintenance: An economical design," European Journal of Operational Research, Elsevier, vol. 222(2), pages 253-262.
- Xia, Tangbin & Jin, Xiaoning & Xi, Lifeng & Ni, Jun, 2015. "Production-driven opportunistic maintenance for batch production based on MAM–APB scheduling," European Journal of Operational Research, Elsevier, vol. 240(3), pages 781-790.
- Liu, Liping & Yu, Miaomiao & Ma, Yizhong & Tu, Yiliu, 2013. "Economic and economic-statistical designs of an X¯ control chart for two-unit series systems with condition-based maintenance," European Journal of Operational Research, Elsevier, vol. 226(3), pages 491-499.
- Kacem, Imed & Chu, Chengbin, 2008. "Efficient branch-and-bound algorithm for minimizing the weighted sum of completion times on a single machine with one availability constraint," International Journal of Production Economics, Elsevier, vol. 112(1), pages 138-150, March.
- Wenchang Luo & Yao Xu & Weitian Tong & Guohui Lin, 2019. "Single-machine scheduling with job-dependent machine deterioration," Journal of Scheduling, Springer, vol. 22(6), pages 691-707, December.
- Zhou, Wenhui & Zheng, Zhibin & Xie, Wei, 2017. "A control-chart-based queueing approach for service facility maintenance with energy-delay tradeoff," European Journal of Operational Research, Elsevier, vol. 261(2), pages 613-625.
- Yin, Hui & Zhang, Guojun & Zhu, Haiping & Deng, Yuhao & He, Fei, 2015. "An integrated model of statistical process control and maintenance based on the delayed monitoring," Reliability Engineering and System Safety, Elsevier, vol. 133(C), pages 323-333.
- Jing Fan & Xiwen Lu, 2015. "Supply chain scheduling problem in the hospital with periodic working time on a single machine," Journal of Combinatorial Optimization, Springer, vol. 30(4), pages 892-905, November.
- Kacem, Imed & Chu, Chengbin, 2008. "Worst-case analysis of the WSPT and MWSPT rules for single machine scheduling with one planned setup period," European Journal of Operational Research, Elsevier, vol. 187(3), pages 1080-1089, June.
More about this item
Keywords
integrated planning; production scheduling; maintenance; quality control; parallel machine system;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:pal:jorsoc:v:68:y:2017:i:7:d:10.1057_jors.2016.46. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.palgrave-journals.com/ .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.