Multi-product lot scheduling with backordering and shelf-life constraints
Author
Abstract
Suggested Citation
DOI: 10.1016/j.omega.2012.06.004
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- S Sharma, 2004. "Optimal production policy with shelf life including shortages," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 55(8), pages 902-909, August.
- Sharma, Sanjay, 2009. "Revisiting the shelf life constrained multi-product manufacturing problem," European Journal of Operational Research, Elsevier, vol. 193(1), pages 129-139, February.
- Grznar, J. & Riggle, C., 1997. "An optimal algorithm for the basic period approach to the economic lot scheduling problem," Omega, Elsevier, vol. 25(3), pages 355-364, June.
- Sushil Verma & Maged Dessouky, 1998. "Single-Machine Scheduling of Unit-Time Jobs with Earliness and Tardiness Penalties," Mathematics of Operations Research, INFORMS, vol. 23(4), pages 930-943, November.
- Tempelmeier, Horst, 2011. "A column generation heuristic for dynamic capacitated lot sizing with random demand under a fill rate constraint," Omega, Elsevier, vol. 39(6), pages 627-633, December.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Janssen, Larissa & Claus, Thorsten & Sauer, Jürgen, 2016. "Literature review of deteriorating inventory models by key topics from 2012 to 2015," International Journal of Production Economics, Elsevier, vol. 182(C), pages 86-112.
- Mohammadi, Maryam & Musa, Siti Nurmaya & Bahreininejad, Ardeshir, 2015. "Optimization of economic lot scheduling problem with backordering and shelf-life considerations using calibrated metaheuristic algorithms," Applied Mathematics and Computation, Elsevier, vol. 251(C), pages 404-422.
- Glock, Christoph H. & Grosse, Eric H., 2021. "The impact of controllable production rates on the performance of inventory systems: A systematic review of the literature," European Journal of Operational Research, Elsevier, vol. 288(3), pages 703-720.
- Long Zhang & Yuzhong Zhang & Qingguo Bai, 2019. "Two-stage medical supply chain scheduling with an assignable common due window and shelf life," Journal of Combinatorial Optimization, Springer, vol. 37(1), pages 319-329, January.
- Jian Li & Lu Liu & Hao Hu & Qiuhong Zhao & Libin Guo, 2018. "An Inventory Model for Deteriorating Drugs with Stochastic Lead Time," IJERPH, MDPI, vol. 15(12), pages 1-20, December.
- Koca, Esra & Yaman, Hande & Selim Aktürk, M., 2015. "Stochastic lot sizing problem with controllable processing times," Omega, Elsevier, vol. 53(C), pages 1-10.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Sereshti, Narges & Adulyasak, Yossiri & Jans, Raf, 2024. "Managing flexibility in stochastic multi-level lot sizing problem with service level constraints," Omega, Elsevier, vol. 122(C).
- Özen, Ulaş & Doğru, Mustafa K. & Armagan Tarim, S., 2012. "Static-dynamic uncertainty strategy for a single-item stochastic inventory control problem," Omega, Elsevier, vol. 40(3), pages 348-357.
- Sharma, Sanjay, 2009. "Revisiting the shelf life constrained multi-product manufacturing problem," European Journal of Operational Research, Elsevier, vol. 193(1), pages 129-139, February.
- Sereshti, Narges & Adulyasak, Yossiri & Jans, Raf, 2021. "The value of aggregate service levels in stochastic lot sizing problems," Omega, Elsevier, vol. 102(C).
- Céline Gicquel & Jianqiang Cheng, 2018. "A joint chance-constrained programming approach for the single-item capacitated lot-sizing problem with stochastic demand," Annals of Operations Research, Springer, vol. 264(1), pages 123-155, May.
- L E Cárdenas-Barrón, 2006. "Optimal production policy with shelf-life including shortages: a comment," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 57(12), pages 1499-1500, December.
- Chang, Ping-Teng & Yao, Ming-Jong & Huang, Shih-Fen & Chen, Chia-Tsung, 2006. "A genetic algorithm for solving a fuzzy economic lot-size scheduling problem," International Journal of Production Economics, Elsevier, vol. 102(2), pages 265-288, August.
- Sharma, Sanjay, 2008. "On the flexibility of demand and production rate," European Journal of Operational Research, Elsevier, vol. 190(2), pages 557-561, October.
- Sourd, Francis, 2005. "Punctuality and idleness in just-in-time scheduling," European Journal of Operational Research, Elsevier, vol. 167(3), pages 739-751, December.
- Pauls-Worm, Karin G.J. & Hendrix, Eligius M.T. & Alcoba, Alejandro G. & Haijema, René, 2016. "Order quantities for perishable inventory control with non-stationary demand and a fill rate constraint," International Journal of Production Economics, Elsevier, vol. 181(PA), pages 238-246.
- S K Goyal & S Viswanathan, 2006. "On ‘Optimal production policy with shelf life including shortages’," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 57(6), pages 747-747, June.
- Taş, Duygu & Gendreau, Michel & Jabali, Ola & Jans, Raf, 2019. "A capacitated lot sizing problem with stochastic setup times and overtime," European Journal of Operational Research, Elsevier, vol. 273(1), pages 146-159.
- Liu, Kanglin & Zhang, Zhi-Hai, 2018. "Capacitated disassembly scheduling under stochastic yield and demand," European Journal of Operational Research, Elsevier, vol. 269(1), pages 244-257.
- Silvio Alexandre de Araujo & Bert De Reyck & Zeger Degraeve & Ioannis Fragkos & Raf Jans, 2015. "Period Decompositions for the Capacitated Lot Sizing Problem with Setup Times," INFORMS Journal on Computing, INFORMS, vol. 27(3), pages 431-448, August.
- Chen, Haoxun, 2015. "Fix-and-optimize and variable neighborhood search approaches for multi-level capacitated lot sizing problems," Omega, Elsevier, vol. 56(C), pages 25-36.
- Brahimi, Nadjib & Absi, Nabil & Dauzère-Pérès, Stéphane & Nordli, Atle, 2017. "Single-item dynamic lot-sizing problems: An updated survey," European Journal of Operational Research, Elsevier, vol. 263(3), pages 838-863.
- Li, Yuchen & Saldanha-da-Gama, Francisco & Liu, Ming & Yang, Zaoli, 2023. "A risk-averse two-stage stochastic programming model for a joint multi-item capacitated line balancing and lot-sizing problem," European Journal of Operational Research, Elsevier, vol. 304(1), pages 353-365.
- Zhang, Zhe & Gong, Xue & Song, Xiaoling & Yin, Yong & Lev, Benjamin & Chen, Jie, 2022. "A column generation-based exact solution method for seru scheduling problems," Omega, Elsevier, vol. 108(C).
- S Sharma, 2006. "Reply to SK Goyal," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 57(6), pages 748-748, June.
- Dinakar Gade & Simge Küçükyavuz, 2013. "Formulations for dynamic lot sizing with service levels," Naval Research Logistics (NRL), John Wiley & Sons, vol. 60(2), pages 87-101, March.
More about this item
Keywords
Economic lot scheduling; Shelf-life constraint; Backordering;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:jomega:v:41:y:2013:i:3:p:510-516. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/wps/find/journaldescription.cws_home/375/description#description .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.