Scheduling for non regular performance measure under the due window approach

Author

Listed:
  • Sabuncuoglu, Ihsan
  • Lejmi, Tahar

Abstract

In the last two decades, Just-In-Time (JIT) production has proved to be an essential requirement of world class manufacturing. This has made schedulers most concerned about the realization of a JIT environment. The JIT concept requires not only a penalty for backorder and lateness but also for earliness. This can be translated into non-regular scheduling objectives. The most obvious objective can be to minimize the deviation of completion times. Concerning earliness/tardiness problems, researchers have usually considered systems where jobs incur no penalty for completion at a certain point of time (i.e. due date). In practice, however, job completions can also be accepted without penalty within an interval in time, which is known as the due window. This paper studies the scheduling problems in terms of the non-regular measure, mean absolute deviation (MAD), under the due window approach. The study is conducted in a dynamic job shop environment. Furthermore, we propose two new rules that perform quite effectively for the MAD measure.

Suggested Citation

  • Sabuncuoglu, Ihsan & Lejmi, Tahar, 1999. "Scheduling for non regular performance measure under the due window approach," Omega, Elsevier, vol. 27(5), pages 555-568, October.
  • Handle: RePEc:eee:jomega:v:27:y:1999:i:5:p:555-568
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0305-0483(99)00018-3
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Ari P. J. Vepsalainen & Thomas E. Morton, 1987. "Priority Rules for Job Shops with Weighted Tardiness Costs," Management Science, INFORMS, vol. 33(8), pages 1035-1047, August.
    2. R. W. Conway & W. L. Maxwell, 1962. "Network Dispatching by the Shortest-Operation Discipline," Operations Research, INFORMS, vol. 10(1), pages 51-73, February.
    3. Kenneth R. Baker & Gary D. Scudder, 1990. "Sequencing with Earliness and Tardiness Penalties: A Review," Operations Research, INFORMS, vol. 38(1), pages 22-36, February.
    4. Hamilton Emmons, 1987. "Scheduling to a common due date on parallel uniform processors," Naval Research Logistics (NRL), John Wiley & Sons, vol. 34(6), pages 803-810, December.
    5. Uttarayan Bagchi & Yih‐Long Chang & Robert S. Sullivan, 1987. "Minimizing absolute and squared deviations of completion times with different earliness and tardiness penalties and a common due date," Naval Research Logistics (NRL), John Wiley & Sons, vol. 34(5), pages 739-751, October.
    6. Kenneth R. Baker, 1984. "Sequencing Rules and Due-Date Assignments in a Job Shop," Management Science, INFORMS, vol. 30(9), pages 1093-1104, September.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Yu, Min-Chun & Goh, Mark & Lin, Hung-Chung, 2012. "Fuzzy multi-objective vendor selection under lean procurement," European Journal of Operational Research, Elsevier, vol. 219(2), pages 305-311.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Gordon, Valery & Proth, Jean-Marie & Chu, Chengbin, 2002. "A survey of the state-of-the-art of common due date assignment and scheduling research," European Journal of Operational Research, Elsevier, vol. 139(1), pages 1-25, May.
    2. Prabuddha De & Jay B. Ghosh & Charles E. Wells, 1994. "Due‐date assignment and early/tardy scheduling on identical parallel machines," Naval Research Logistics (NRL), John Wiley & Sons, vol. 41(1), pages 17-32, February.
    3. Enrique Gerstl & Gur Mosheiov, 2014. "Single machine just‐in‐time scheduling problems with two competing agents," Naval Research Logistics (NRL), John Wiley & Sons, vol. 61(1), pages 1-16, February.
    4. X. Cai & S. Zhou, 1997. "Scheduling stochastic jobs with asymmetric earliness and tardiness penalties," Naval Research Logistics (NRL), John Wiley & Sons, vol. 44(6), pages 531-557, September.
    5. Sridharan, V. & Zhou, Z., 1996. "A decision theory based scheduling procedure for single-machine weighted earliness and tardiness problems," European Journal of Operational Research, Elsevier, vol. 94(2), pages 292-301, October.
    6. Fowler, John W. & Mönch, Lars, 2022. "A survey of scheduling with parallel batch (p-batch) processing," European Journal of Operational Research, Elsevier, vol. 298(1), pages 1-24.
    7. Xia, Yu & Chen, Bintong & Yue, Jinfeng, 2008. "Job sequencing and due date assignment in a single machine shop with uncertain processing times," European Journal of Operational Research, Elsevier, vol. 184(1), pages 63-75, January.
    8. John J. Clifford & Marc E. Posner, 2000. "High Multiplicity in Earliness-Tardiness Scheduling," Operations Research, INFORMS, vol. 48(5), pages 788-800, October.
    9. Adamopoulos, George I. & Pappis, Costas P., 1998. "Scheduling under a common due-data on parallel unrelated machines," European Journal of Operational Research, Elsevier, vol. 105(3), pages 494-501, March.
    10. Awi Federgruen & Gur Mosheiov, 1993. "Simultaneous optimization of efficiency and performance balance measures in single‐machine scheduling problems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 40(7), pages 951-970, December.
    11. Mosheiov, Gur & Shadmon, Michal, 2001. "Minmax earliness-tardiness costs with unit processing time jobs," European Journal of Operational Research, Elsevier, vol. 130(3), pages 638-652, May.
    12. Bernard Dickman & Yonah Wilamowsky & Sheldon Epstein, 2001. "Multiple common due dates," Naval Research Logistics (NRL), John Wiley & Sons, vol. 48(4), pages 293-298, June.
    13. Yue, Jinfeng & Wang, Min-Chiang & Chen, Bintong, 2007. "Mean-range based distribution-free procedures to minimize "overage" and "underage" costs," European Journal of Operational Research, Elsevier, vol. 176(2), pages 1103-1116, January.
    14. Zhi-Long Chen, 1997. "Scheduling with batch setup times and earliness-tardiness penalties," European Journal of Operational Research, Elsevier, vol. 96(3), pages 518-537, February.
    15. Cai, X., 1995. "Minimization of agreeably weighted variance in single machine systems," European Journal of Operational Research, Elsevier, vol. 85(3), pages 576-592, September.
    16. T C E Cheng & L Y Kang & C T Ng, 2007. "Due-date assignment and parallel-machine scheduling with deteriorating jobs," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 58(8), pages 1103-1108, August.
    17. Ouenniche, J. & Bertrand, J. W. M., 2001. "The finite horizon economic lot sizing problem in job shops: : the multiple cycle approach," International Journal of Production Economics, Elsevier, vol. 74(1-3), pages 49-61, December.
    18. Plateau, M.-C. & Rios-Solis, Y.A., 2010. "Optimal solutions for unrelated parallel machines scheduling problems using convex quadratic reformulations," European Journal of Operational Research, Elsevier, vol. 201(3), pages 729-736, March.
    19. Adamopoulos, George I. & Pappis, Costas P., 1996. "A fuzzy-linguistic approach to a multi-criteria sequencing problem," European Journal of Operational Research, Elsevier, vol. 92(3), pages 628-636, August.
    20. Kasper, T.A. Arno & Land, Martin J. & Teunter, Ruud H., 2023. "Towards System State Dispatching in High‐Variety Manufacturing," Omega, Elsevier, vol. 114(C).

    More about this item

    Keywords

    Job shop scheduling Due windows MAD;

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:jomega:v:27:y:1999:i:5:p:555-568. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/wps/find/journaldescription.cws_home/375/description#description .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.