Airport infrastructure investments and valuing expansion decisions using the compound real option approach
Author
Abstract
Suggested Citation
DOI: 10.1016/j.jairtraman.2020.102011
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Avinash K. Dixit & Robert S. Pindyck, 1994. "Investment under Uncertainty," Economics Books, Princeton University Press, edition 1, number 5474.
- Bowe, Michael & Lee, Ding Lun, 2004. "Project evaluation in the presence of multiple embedded real options: evidence from the Taiwan High-Speed Rail Project," Journal of Asian Economics, Elsevier, vol. 15(1), pages 71-98, February.
- Helton, J.C. & Johnson, J.D. & Sallaberry, C.J. & Storlie, C.B., 2006. "Survey of sampling-based methods for uncertainty and sensitivity analysis," Reliability Engineering and System Safety, Elsevier, vol. 91(10), pages 1175-1209.
- Lin, William T, 2002. "Computing a Multivariate Normal Integral for Valuing Compound Real Options," Review of Quantitative Finance and Accounting, Springer, vol. 18(2), pages 185-209, March.
- Black, Fischer & Scholes, Myron S, 1973. "The Pricing of Options and Corporate Liabilities," Journal of Political Economy, University of Chicago Press, vol. 81(3), pages 637-654, May-June.
- Olubanjo Michael Adetunji & Akintola Amos Owolabi, 2016. "Valuation of Interacting Time-to-Build and Growth Real Options in Infrastructure Investments," International Journal of Economics and Finance, Canadian Center of Science and Education, vol. 8(12), pages 202-215, December.
- Lenos Trigeorgis, 1993. "Real Options and Interactions With Financial Flexibility," Financial Management, Financial Management Association, vol. 22(3), Fall.
- Cox, John C. & Ross, Stephen A., 1976. "The valuation of options for alternative stochastic processes," Journal of Financial Economics, Elsevier, vol. 3(1-2), pages 145-166.
- Byungil Kim & Kyle Anderson & SangHyun Lee & Hyoungkwan Kim, 2014. "A Real Option Perspective to Value the Multi-Stage Construction of Rainwater Harvesting Systems Reusing Septic Tank," Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), Springer;European Water Resources Association (EWRA), vol. 28(8), pages 2279-2291, June.
- Yu-Lin Huang & Shih-Pei Chou, 2006. "Valuation of the minimum revenue guarantee and the option to abandon in BOT infrastructure projects," Construction Management and Economics, Taylor & Francis Journals, vol. 24(4), pages 379-389.
- Geske, Robert, 1977. "The Valuation of Corporate Liabilities as Compound Options," Journal of Financial and Quantitative Analysis, Cambridge University Press, vol. 12(4), pages 541-552, November.
- Myers, Stewart C., 1977. "Determinants of corporate borrowing," Journal of Financial Economics, Elsevier, vol. 5(2), pages 147-175, November.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Yu-Lin Huang & Tsen-Chin Lin, 2023. "Compound deferrable options for the valuation of multi-stage infrastructure investment projects," Construction Management and Economics, Taylor & Francis Journals, vol. 41(8), pages 670-686, August.
- Raisa Pérez-Vas & Félix Puime Guillén & Joaquín Enríquez-Díaz, 2021. "Valuation of a Company Producing and Trading Seaweed for Human Consumption: Classical Methods vs. Real Options," IJERPH, MDPI, vol. 18(10), pages 1-13, May.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Cuypers, I.R.P., 2009. "Essays on equity joint ventures, uncertainty and experience," Other publications TiSEM 8dc79e86-c625-467f-a450-8, Tilburg University, School of Economics and Management.
- Twine, Edgar E. & Kiiza, Barnabas & Bashaasha, Bernard, 2015. "The Flexible Accelerator Model of Investment: An Application to Ugandan Tea- Processing Firms," African Journal of Agricultural and Resource Economics, African Association of Agricultural Economists, vol. 10(1), pages 1-15, March.
- Garcia Fronti, Javier, 2015. "Modelo estocástico para la valuación de una inversión nanomédica [Nanomedical Stochastic Investment Valuation]," MPRA Paper 63948, University Library of Munich, Germany.
- repec:dau:papers:123456789/1046 is not listed on IDEAS
- Twine, Edgar E. & Omore, Amos & Githinji, Julius, 2018. "Uncertainty in milk production by smallholders in Tanzania and its implications for investment," International Food and Agribusiness Management Review, International Food and Agribusiness Management Association, vol. 21(1).
- Kangsoo Kim & Hyejin Cho & Donghyung Yook, 2019. "Financing for a Sustainable PPP Development: Valuation of the Contractual Rights under Exercise Conditions for an Urban Railway PPP Project in Korea," Sustainability, MDPI, vol. 11(6), pages 1-14, March.
- Schachter, J.A. & Mancarella, P., 2016. "A critical review of Real Options thinking for valuing investment flexibility in Smart Grids and low carbon energy systems," Renewable and Sustainable Energy Reviews, Elsevier, vol. 56(C), pages 261-271.
- Haque, Md. Aminul & Topal, Erkan & Lilford, Eric, 2014. "A numerical study for a mining project using real options valuation under commodity price uncertainty," Resources Policy, Elsevier, vol. 39(C), pages 115-123.
- Michele Moretto & Chiara D’Alpaos, 2004. "The Value of Flexibility in the Italian Water Service Sector: A Real Option Analysis," Working Papers 2004.140, Fondazione Eni Enrico Mattei.
- Lander, Diane M. & Pinches, George E., 1998. "Challenges to the Practical Implementation of Modeling and Valuing Real Options," The Quarterly Review of Economics and Finance, Elsevier, vol. 38(3, Part 2), pages 537-567.
- Liu, Yu-hong & Jiang, I-Ming & Hsu, Wei-tze, 2018. "Compound option pricing under a double exponential Jump-diffusion model," The North American Journal of Economics and Finance, Elsevier, vol. 43(C), pages 30-53.
- Carlos Andrés Zapata Quimbayo, 2020. "OPCIONES REALES Una guía teórico-práctica para la valoración de inversiones bajo incertidumbre mediante modelos en tiempo discreto y simulación de Monte Carlo," Books, Universidad Externado de Colombia, Facultad de Finanzas, Gobierno y Relaciones Internacionales, number 138, April.
- Jan Vlachý, 2009. "Solving the Capacity Optimization Problem under Demand Uncertainty," Romanian Economic Journal, Department of International Business and Economics from the Academy of Economic Studies Bucharest, vol. 12(34), pages 97-116, (4).
- Das Gupta, Supratim, 2018. "Using real options to study the impact of capacity additions and investment expenditures in renewable energies in India," MPRA Paper 90441, University Library of Munich, Germany.
- Anastasios Michailidis & Konstadinos Mattas, 2007. "Using Real Options Theory to Irrigation Dam Investment Analysis: An Application of Binomial Option Pricing Model," Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), Springer;European Water Resources Association (EWRA), vol. 21(10), pages 1717-1733, October.
- Philipp N. Baecker, 2007. "Real Options and Intellectual Property," Lecture Notes in Economics and Mathematical Systems, Springer, number 978-3-540-48264-2, July.
- Aminrostamkolaee, Behnam & Scroggs, Jeffrey S. & Borghei, Matin Sadat & Safdari-Vaighani, Ali & Mohammadi, Teymour & Hossein Pourkazemi, Mohammad, 2017. "Valuation of a hypothetical mining project under commodity price and exchange rate uncertainties by using numerical methods," Resources Policy, Elsevier, vol. 52(C), pages 296-307.
- Cheng, Cheng & Wang, Zhen & Liu, Mingming & Chen, Qiang & Gbatu, Abimelech Paye & Ren, Xiaohang, 2017. "Defer option valuation and optimal investment timing of solar photovoltaic projects under different electricity market systems and support schemes," Energy, Elsevier, vol. 127(C), pages 594-610.
- Ahlers, Oliver & Hack, Andreas & Kellermanns, Franz W., 2014. "“Stepping into the buyers’ shoes”: Looking at the value of family firms through the eyes of private equity investors," Journal of Family Business Strategy, Elsevier, vol. 5(4), pages 384-396.
- Panagiotidis, Theodore & Printzis, Panagiotis, 2020.
"What is the investment loss due to uncertainty?,"
Global Finance Journal, Elsevier, vol. 45(C).
- Theodore Panagiotidis & Panagiotis Printzis, 2019. "What is the Investment Loss due to Uncertainty?," Working Paper series 19-06, Rimini Centre for Economic Analysis.
- Theodore Panagiotidis & Panagiotis Printzis, 2019. "What is the Investment Loss due to Uncertainty?," GreeSE – Hellenic Observatory Papers on Greece and Southeast Europe 138, Hellenic Observatory, LSE.
- Panagiotidis, Theodore & Printzis, Panagiotis, 2019. "What is the investment loss due to uncertainty?," LSE Research Online Documents on Economics 102648, London School of Economics and Political Science, LSE Library.
- Theodore Panagiotidis & Panagiotis Printzis, 2019. "What is the Investment Loss due to Uncertainty?," Working Papers 383, Leibniz Institut für Ost- und Südosteuropaforschung (Institute for East and Southeast European Studies).
- Dapena, Jose Pablo, 2003.
"On the Valuation of Companies with Growth Opportunities,"
Journal of Applied Economics, Universidad del CEMA, vol. 6(1), pages 1-24, May.
- José Pablo Dapena Fernandez, 2003. "On the Valuation of Companies with Growth Opportunities," Journal of Applied Economics, Universidad del CEMA, vol. 6, pages 49-72, May.
- José Pablo Dapena, 2003. "On the Valuation of Companies with Growth Opportunities," Journal of Applied Economics, Taylor & Francis Journals, vol. 6(1), pages 49-72, May.
More about this item
Keywords
Compound real option; Airport infrastructure investment; Growth option;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:jaitra:v:91:y:2021:i:c:s0969699720305901. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.journals.elsevier.com/journal-of-air-transport-management/ .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.