IDEAS home Printed from https://ideas.repec.org/a/inm/ormnsc/v29y1983i2p237-249.html
   My bibliography  Save this article

Rolling Horizon Procedures for the Facilities in Series Inventory Model with Nested Schedules

Author

Listed:
  • Suresh Chand

    (Purdue University)

Abstract

This paper develops rolling horizon procedures for solving a multistage inventory problem with facilities-in-series. In such an inventory system, we assume that the raw material is processed successively through several facilities before reaching the customer. The input to a facility comes from one preceding facility (or the raw material) and the output from the facility goes to one succeeding facility (or the customer). The rolling horizon procedures form rolling production schedules by solving a finite horizon multiperiod problem and implementing only the first period's decisions. One period later, the multiperiod problem is updated as better forecasts become available and the process is repeated. The paper considers a simple case when holding costs are linear, production costs on a facility consist of a setup cost and a constant marginal cost of production, and production and holding costs are stationary in time. Demand is allowed to be nonstationary in time. Several rolling horizon procedures are developed for this case and a computational comparison is given.

Suggested Citation

  • Suresh Chand, 1983. "Rolling Horizon Procedures for the Facilities in Series Inventory Model with Nested Schedules," Management Science, INFORMS, vol. 29(2), pages 237-249, February.
  • Handle: RePEc:inm:ormnsc:v:29:y:1983:i:2:p:237-249
    DOI: 10.1287/mnsc.29.2.237
    as

    Download full text from publisher

    File URL: http://dx.doi.org/10.1287/mnsc.29.2.237
    Download Restriction: no

    File URL: https://libkey.io/10.1287/mnsc.29.2.237?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Dellaert, Nico & Jeunet, Jully, 2003. "Controlling multi-level production in a rolling-schedule environment," International Journal of Production Economics, Elsevier, vol. 85(1), pages 113-121, July.
    2. repec:dau:papers:123456789/2078 is not listed on IDEAS
    3. Zhang, Jianghua & Long, Daniel Zhuoyu & Li, Yuchen, 2023. "A reliable emergency logistics network for COVID-19 considering the uncertain time-varying demands," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 172(C).
    4. Voros, Jozsef, 1995. "Setup cost stability region for the multi-level dynamic lot sizing problem," European Journal of Operational Research, Elsevier, vol. 87(1), pages 132-141, November.
    5. Jing, Fuying & Chao, Xiangrui, 2022. "Forecast horizons for a two-echelon dynamic lot-sizing problem," Omega, Elsevier, vol. 110(C).
    6. Kedar S. Naphade & S. David Wu & Robert H. Storer & Bhavin J. Doshi, 2001. "Melt Scheduling to Trade Off Material Waste and Shipping Performance," Operations Research, INFORMS, vol. 49(5), pages 629-645, October.
    7. Richter, Knut & Gobsch, Barbara, 2003. "The market-oriented dynamic product recovery model in the just-in-time framework," International Journal of Production Economics, Elsevier, vol. 81(1), pages 369-374, January.
    8. Z Hua & J Yang & F Huang & X Xu, 2009. "A static-dynamic strategy for spare part inventory systems with nonstationary stochastic demand," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 60(9), pages 1254-1263, September.
    9. Dellaert, N. & Jeunet, J., 2005. "An alternative to safety stock policies for multi-level rolling schedule MRP problems," European Journal of Operational Research, Elsevier, vol. 163(3), pages 751-768, June.
    10. Suresh Chand & Vernon Ning Hsu & Suresh Sethi, 2002. "Forecast, Solution, and Rolling Horizons in Operations Management Problems: A Classified Bibliography," Manufacturing & Service Operations Management, INFORMS, vol. 4(1), pages 25-43, September.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:ormnsc:v:29:y:1983:i:2:p:237-249. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.