Variables sampling inspection scheme for resubmitted lots based on the process capability index Cpk
Author
Abstract
Suggested Citation
DOI: 10.1016/j.ejor.2011.09.042
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Balamurali, S. & Jun, Chi-Hyuck, 2007. "Multiple dependent state sampling plans for lot acceptance based on measurement data," European Journal of Operational Research, Elsevier, vol. 180(3), pages 1221-1230, August.
- Pearn, W.L. & Wu, Chien-Wei, 2006. "Critical acceptance values and sample sizes of a variables sampling plan for very low fraction of defectives," Omega, Elsevier, vol. 34(1), pages 90-101, January.
- Chen, Jianwei & Li, Kim-Hung & Lam, Yeh, 2007. "Bayesian single and double variable sampling plans for the Weibull distribution with censoring," European Journal of Operational Research, Elsevier, vol. 177(2), pages 1062-1073, March.
- Wu, Chien-Wei & Pearn, W.L. & Kotz, Samuel, 2009. "An overview of theory and practice on process capability indices for quality assurance," International Journal of Production Economics, Elsevier, vol. 117(2), pages 338-359, February.
- Wu, Chien-Wei & Pearn, W.L., 2008. "A variables sampling plan based on Cpmk for product acceptance determination," European Journal of Operational Research, Elsevier, vol. 184(2), pages 549-560, January.
- Lam, Yeh & Li, Kim-Hung & Ip, Wai-Cheung & Wong, Heung, 2006. "Sequential variable sampling plan for normal distribution," European Journal of Operational Research, Elsevier, vol. 172(1), pages 127-145, July.
- W L Pearn & Chien-Wei Wu, 2006. "Variables sampling plans with PPM fraction of defectives and process loss consideration," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 57(4), pages 450-459, April.
- Pearn, W.L. & Wu, Chien-Wei, 2007. "An effective decision making method for product acceptance," Omega, Elsevier, vol. 35(1), pages 12-21, February.
- Muhammad Aslam & Chi-Hyuck Jun, 2009. "A group acceptance sampling plan for truncated life test having Weibull distribution," Journal of Applied Statistics, Taylor & Francis Journals, vol. 36(9), pages 1021-1027.
- Seo, J.H. & Jung, M. & Kim, C.M., 2009. "Design of accelerated life test sampling plans with a nonconstant shape parameter," European Journal of Operational Research, Elsevier, vol. 197(2), pages 659-666, September.
- Fernández, Arturo J. & Pérez-González, Carlos J. & Aslam, Muhammad & Jun, Chi-Hyuck, 2011. "Design of progressively censored group sampling plans for Weibull distributions: An optimization problem," European Journal of Operational Research, Elsevier, vol. 211(3), pages 525-532, June.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Chien-Wei Wu & Ming-Hung Shu & Pei-An Wang & Bi-Min Hsu, 2021. "Variables skip-lot sampling plans on the basis of process capability index for products with a low fraction of defectives," Computational Statistics, Springer, vol. 36(2), pages 1391-1413, June.
- Wu, Chien-Wei, 2012. "An efficient inspection scheme for variables based on Taguchi capability index," European Journal of Operational Research, Elsevier, vol. 223(1), pages 116-122.
- Michele Scagliarini, 2022. "A sequential test and a sequential sampling plan based on the process capability index Cpmk," Computational Statistics, Springer, vol. 37(3), pages 1523-1550, July.
- Amy Lee & Chien-Wei Wu & Yen-Wen Chen, 2016. "A modified variables repetitive group sampling plan with the consideration of preceding lots information," Annals of Operations Research, Springer, vol. 238(1), pages 355-373, March.
- Shih-Wen Liu & Chien-Wei Wu, 2016. "A quick switching sampling system by variables for controlling lot fraction nonconforming," International Journal of Production Research, Taylor & Francis Journals, vol. 54(6), pages 1839-1849, March.
- Chien-Wei Wu & Zih-Huei Wang, 2017. "Developing a variables multiple dependent state sampling plan with simultaneous consideration of process yield and quality loss," International Journal of Production Research, Taylor & Francis Journals, vol. 55(8), pages 2351-2364, April.
- Amy H. I. Lee & Chien-Wei Wu & Yen-Wen Chen, 2016. "A modified variables repetitive group sampling plan with the consideration of preceding lots information," Annals of Operations Research, Springer, vol. 238(1), pages 355-373, March.
- Fernández, Arturo J. & Correa-Álvarez, Cristian D. & Pericchi, Luis R., 2020. "Balancing producer and consumer risks in optimal attribute testing: A unified Bayesian/Frequentist design," European Journal of Operational Research, Elsevier, vol. 286(2), pages 576-587.
- Shardrom Johnson & Jinwu Han & Yuanchen Liu & Li Chen & Xinlin Wu, 2018. "Hybrid Approach with Improved Genetic Algorithm and Simulated Annealing for Thesis Sampling," Future Internet, MDPI, vol. 10(8), pages 1-15, July.
- Fernández, Arturo J., 2015. "Optimum attributes component test plans for k-out-of-n:F Weibull systems using prior information," European Journal of Operational Research, Elsevier, vol. 240(3), pages 688-696.
- CHEN, Piao & YE, Zhi-Sheng, 2018. "A systematic look at the gamma process capability indices," European Journal of Operational Research, Elsevier, vol. 265(2), pages 589-597.
- Lepore, A. & Palumbo, B. & Castagliola, P., 2018. "A note on decision making method for product acceptance based on process capability indices Cpk and Cpmk," European Journal of Operational Research, Elsevier, vol. 267(1), pages 393-398.
- Fernández, Arturo J., 2012. "Minimizing the area of a Pareto confidence region," European Journal of Operational Research, Elsevier, vol. 221(1), pages 205-212.
- Fernández, Arturo J., 2017. "Economic lot sampling inspection from defect counts with minimum conditional value-at-risk," European Journal of Operational Research, Elsevier, vol. 258(2), pages 573-580.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Fernández, Arturo J. & Pérez-González, Carlos J. & Aslam, Muhammad & Jun, Chi-Hyuck, 2011. "Design of progressively censored group sampling plans for Weibull distributions: An optimization problem," European Journal of Operational Research, Elsevier, vol. 211(3), pages 525-532, June.
- Amy H. I. Lee & Chien-Wei Wu & Yen-Wen Chen, 2016. "A modified variables repetitive group sampling plan with the consideration of preceding lots information," Annals of Operations Research, Springer, vol. 238(1), pages 355-373, March.
- Chien-Wei Wu & Zih-Huei Wang, 2017. "Developing a variables multiple dependent state sampling plan with simultaneous consideration of process yield and quality loss," International Journal of Production Research, Taylor & Francis Journals, vol. 55(8), pages 2351-2364, April.
- Amy Lee & Chien-Wei Wu & Yen-Wen Chen, 2016. "A modified variables repetitive group sampling plan with the consideration of preceding lots information," Annals of Operations Research, Springer, vol. 238(1), pages 355-373, March.
- Chien-Wei Wu & Ming-Hung Shu & Pei-An Wang & Bi-Min Hsu, 2021. "Variables skip-lot sampling plans on the basis of process capability index for products with a low fraction of defectives," Computational Statistics, Springer, vol. 36(2), pages 1391-1413, June.
- Wu, Chien-Wei, 2012. "An efficient inspection scheme for variables based on Taguchi capability index," European Journal of Operational Research, Elsevier, vol. 223(1), pages 116-122.
- Fernández, Arturo J., 2015. "Optimum attributes component test plans for k-out-of-n:F Weibull systems using prior information," European Journal of Operational Research, Elsevier, vol. 240(3), pages 688-696.
- Qin, Ruwen & Cudney, Elizabeth A. & Hamzic, Zlatan, 2015. "An optimal plan of zero-defect single-sampling by attributes for incoming inspections in assembly lines," European Journal of Operational Research, Elsevier, vol. 246(3), pages 907-915.
- Fernández, Arturo J. & Pérez-González, Carlos J., 2012. "Optimal acceptance sampling plans for log-location–scale lifetime models using average risks," Computational Statistics & Data Analysis, Elsevier, vol. 56(3), pages 719-731.
- Fernández, Arturo J. & Correa-Álvarez, Cristian D. & Pericchi, Luis R., 2020. "Balancing producer and consumer risks in optimal attribute testing: A unified Bayesian/Frequentist design," European Journal of Operational Research, Elsevier, vol. 286(2), pages 576-587.
- Lepore, A. & Palumbo, B. & Castagliola, P., 2018. "A note on decision making method for product acceptance based on process capability indices Cpk and Cpmk," European Journal of Operational Research, Elsevier, vol. 267(1), pages 393-398.
- Li, Der-Chiang & Lin, Liang-Sian, 2013. "A new approach to assess product lifetime performance for small data sets," European Journal of Operational Research, Elsevier, vol. 230(2), pages 290-298.
- Fernández, Arturo J., 2017. "Economic lot sampling inspection from defect counts with minimum conditional value-at-risk," European Journal of Operational Research, Elsevier, vol. 258(2), pages 573-580.
- Ji Hwan Cha & Sophie Mercier, 2022. "Two Reliability Acceptance Sampling Plans for Items Subject to Wiener Process of Degradation," Methodology and Computing in Applied Probability, Springer, vol. 24(3), pages 1651-1668, September.
- Muhammad Aslam & Mohammed Albassam, 2019. "Inspection Plan Based on the Process Capability Index Using the Neutrosophic Statistical Method," Mathematics, MDPI, vol. 7(7), pages 1-10, July.
- Fernández, Arturo J., 2012. "Minimizing the area of a Pareto confidence region," European Journal of Operational Research, Elsevier, vol. 221(1), pages 205-212.
- Lee, Amy H.I. & Wu, Chien-Wei & Wang, To-Cheng & Kuo, Ming-Han, 2024. "Construction of acceptance sampling schemes for exponential lifetime products with progressive type II right censoring," Reliability Engineering and System Safety, Elsevier, vol. 243(C).
- David Han, 2014. "Optimum Constant-stress and Step-stress Accelerated Life Tests under Time and Cost Constraints," Working Papers 0173mss, College of Business, University of Texas at San Antonio.
- Maram Salem & Zeinab Amin & Moshira Ismail, 2020. "Progressively Censored Reliability Sampling Plans Based on Mean Product Lifetime," Sankhya B: The Indian Journal of Statistics, Springer;Indian Statistical Institute, vol. 82(1), pages 1-33, May.
- Mingquan Wang & Fengping Yang & Bin Zhang & Zhisong Chen, 2023. "Sustainable Quality Management Based on Metrological Sampling Scheme Design: A Case Study of Food Processor," Sustainability, MDPI, vol. 15(6), pages 1-13, March.
More about this item
Keywords
Quality control; Acceptance sampling; Decision making; Lot resubmission; Process fraction defectives;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:217:y:2012:i:3:p:560-566. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.