A note on "Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns"
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Chiu, Singa Wang & Wang, Shan-Ling & Chiu, Yuan-Shyi Peter, 2007. "Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns," European Journal of Operational Research, Elsevier, vol. 180(2), pages 664-676, July.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Shima Shafiee-Gol & Mohammad Mahdi Nasiri & Ata Allah Taleizadeh, 2016. "Pricing and production decisions in multi-product single machine manufacturing system with discrete delivery and rework," OPSEARCH, Springer;Operational Research Society of India, vol. 53(4), pages 873-888, December.
- Chiu, Yuan-Shyi Peter & Chang, Huei-Hsin, 2014. "Optimal run time for EPQ model with scrap, rework and stochastic breakdowns: A note," Economic Modelling, Elsevier, vol. 37(C), pages 143-148.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Harun Öztürk, 2021. "Optimal production run time for an imperfect production inventory system with rework, random breakdowns and inspection costs," Operational Research, Springer, vol. 21(1), pages 167-204, March.
- Prasanta Kumar Ghosh & Amalesh Kumar Manna & Jayanta Kumar Dey & Samarjit Kar, 2023. "Optimal production run in an imperfect production process with maintenance under warranty and product insurance," OPSEARCH, Springer;Operational Research Society of India, vol. 60(2), pages 720-752, June.
- Pasandideh, Seyed Hamid Reza & Niaki, Seyed Taghi Akhavan & Nobil, Amir Hossein & Cárdenas-Barrón, Leopoldo Eduardo, 2015. "A multiproduct single machine economic production quantity model for an imperfect production system under warehouse construction cost," International Journal of Production Economics, Elsevier, vol. 169(C), pages 203-214.
- Shima Shafiee-Gol & Mohammad Mahdi Nasiri & Ata Allah Taleizadeh, 2016. "Pricing and production decisions in multi-product single machine manufacturing system with discrete delivery and rework," OPSEARCH, Springer;Operational Research Society of India, vol. 53(4), pages 873-888, December.
- Shine-Der Lee & Chin-Ming Yang & Shu-Chuan Lan, 2016. "Economic lot sizing in a production system with random demand," International Journal of Systems Science, Taylor & Francis Journals, vol. 47(5), pages 1142-1154, April.
- Chiu, Yuan-Shyi Peter & Chang, Huei-Hsin, 2014. "Optimal run time for EPQ model with scrap, rework and stochastic breakdowns: A note," Economic Modelling, Elsevier, vol. 37(C), pages 143-148.
- Taleizadeh, Ata Allah & Cárdenas-Barrón, Leopoldo Eduardo & Mohammadi, Babak, 2014. "A deterministic multi product single machine EPQ model with backordering, scraped products, rework and interruption in manufacturing process," International Journal of Production Economics, Elsevier, vol. 150(C), pages 9-27.
- Harun Öztürk, 2019. "Modeling an inventory problem with random supply, inspection and machine breakdown," OPSEARCH, Springer;Operational Research Society of India, vol. 56(2), pages 497-527, June.
- Bouslah, Bassem & Gharbi, Ali & Pellerin, Robert, 2013. "Joint optimal lot sizing and production control policy in an unreliable and imperfect manufacturing system," International Journal of Production Economics, Elsevier, vol. 144(1), pages 143-156.
- Paul, Sanjoy Kumar & Sarker, Ruhul & Essam, Daryl, 2014. "Real time disruption management for a two-stage batch production–inventory system with reliability considerations," European Journal of Operational Research, Elsevier, vol. 237(1), pages 113-128.
- Widyadana, Gede Agus & Wee, Hui Ming, 2012. "An economic production quantity model for deteriorating items with multiple production setups and rework," International Journal of Production Economics, Elsevier, vol. 138(1), pages 62-67.
- Chen, Ke & Cheng, T.C.E. & Huang, Hailiang & Ji, Min & Yao, Danli, 2023. "Single-machine scheduling with autonomous and induced learning to minimize total weighted number of tardy jobs," European Journal of Operational Research, Elsevier, vol. 309(1), pages 24-34.
- Ata Allah Taleizadeh, 2018. "A constrained integrated imperfect manufacturing-inventory system with preventive maintenance and partial backordering," Annals of Operations Research, Springer, vol. 261(1), pages 303-337, February.
- Wee, Hui Ming & Widyadana, Gede Agus, 2013. "A production model for deteriorating items with stochastic preventive maintenance time and rework process with FIFO rule," Omega, Elsevier, vol. 41(6), pages 941-954.
- Yoo, Seung Ho & Kim, DaeSoo & Park, Myung-Sub, 2012. "Lot sizing and quality investment with quality cost analyses for imperfect production and inspection processes with commercial return," International Journal of Production Economics, Elsevier, vol. 140(2), pages 922-933.
More about this item
Keywords
Manufacturing Machine breakdown Defective item Rework Production;Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:201:y:2010:i:2:p:641-643. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.