IDEAS home Printed from https://ideas.repec.org/a/eee/jomega/v41y2013i6p941-954.html
   My bibliography  Save this article

A production model for deteriorating items with stochastic preventive maintenance time and rework process with FIFO rule

Author

Listed:
  • Wee, Hui Ming
  • Widyadana, Gede Agus

Abstract

Due to unreliable production facility and stochastic preventive maintenance, deriving an optimal production inventory decision in practice is very complicated. In this paper, we develop a production model for deteriorating items with stochastic preventive maintenance time and rework using the first in first out (FIFO) rule. From our literature search, no study has been done on the above problem. The problem is solved using a simple search procedure; this makes it more practical for use by industries. Two case examples using uniform and exponential distribution preventive maintenance time are applied. Examples and sensitivity analysis are conducted for each case. The results show that rework and preventive maintenance time have significant affected the total cost and the optimal production time. This provides helpful managerial insights to help management in making smart decisions.

Suggested Citation

  • Wee, Hui Ming & Widyadana, Gede Agus, 2013. "A production model for deteriorating items with stochastic preventive maintenance time and rework process with FIFO rule," Omega, Elsevier, vol. 41(6), pages 941-954.
  • Handle: RePEc:eee:jomega:v:41:y:2013:i:6:p:941-954
    DOI: 10.1016/j.omega.2012.12.001
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0305048312002198
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.omega.2012.12.001?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Lo, Sh-Tyan & Wee, Hui-Ming & Huang, Wen-Chang, 2007. "An integrated production-inventory model with imperfect production processes and Weibull distribution deterioration under inflation," International Journal of Production Economics, Elsevier, vol. 106(2), pages 493-505, April.
    2. Chiu, Singa Wang & Wang, Shan-Ling & Chiu, Yuan-Shyi Peter, 2007. "Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns," European Journal of Operational Research, Elsevier, vol. 180(2), pages 664-676, July.
    3. Benjamin Lev & Howard J. Weiss, 1990. "Inventory Models with Cost Changes," Operations Research, INFORMS, vol. 38(1), pages 53-63, February.
    4. Karamatsoukis, C.C. & Kyriakidis, E.G., 2009. "Optimal maintenance of a production-inventory system with idle periods," European Journal of Operational Research, Elsevier, vol. 196(2), pages 744-751, July.
    5. Gede Agus Widyadana & Hui Ming Wee, 2012. "An economic production quantity model for deteriorating items with preventive maintenance policy and random machine breakdown," International Journal of Systems Science, Taylor & Francis Journals, vol. 43(10), pages 1870-1882.
    6. Berthaut, F. & Gharbi, A. & Dhouib, K., 2011. "Joint modified block replacement and production/inventory control policy for a failure-prone manufacturing cell," Omega, Elsevier, vol. 39(6), pages 642-654, December.
    7. Gharbi, A. & Kenne, J.-P. & Beit, M., 2007. "Optimal safety stocks and preventive maintenance periods in unreliable manufacturing systems," International Journal of Production Economics, Elsevier, vol. 107(2), pages 422-434, June.
    8. Chakraborty, Tulika & Giri, B.C. & Chaudhuri, K.S., 2009. "Production lot sizing with process deterioration and machine breakdown under inspection schedule," Omega, Elsevier, vol. 37(2), pages 257-271, April.
    9. Chang, Hung-Chi & Ho, Chia-Huei, 2010. "Exact closed-form solutions for "optimal inventory model for items with imperfect quality and shortage backordering"," Omega, Elsevier, vol. 38(3-4), pages 233-237, June.
    10. Flapper, Simme Douwe P. & Teunter, Ruud H., 2004. "Logistic planning of rework with deteriorating work-in-process," International Journal of Production Economics, Elsevier, vol. 88(1), pages 51-59, March.
    11. Wee, Hui-Ming & Wang, Wan-Tsu, 2012. "A supplement to the EPQ with partial backordering and phase-dependent backordering rate," Omega, Elsevier, vol. 40(3), pages 264-266.
    12. Liao, Gwo-Liang & Chen, Yen Hung & Sheu, Shey-Huei, 2009. "Optimal economic production quantity policy for imperfect process with imperfect repair and maintenance," European Journal of Operational Research, Elsevier, vol. 195(2), pages 348-357, June.
    13. Yang, P.C. & Wee, H.M. & Liu, B.S. & Fong, O.K., 2011. "Mitigating Hi-tech products risks due to rapid technological innovation," Omega, Elsevier, vol. 39(4), pages 456-463, August.
    14. Lo, Sh-Tyan & Wee, Hui-Ming & Huang, Wen-Chang, 2007. "An integrated production-inventory model with imperfect production processes and Weibull distribution deterioration under inflation," International Journal of Production Economics, Elsevier, vol. 106(1), pages 248-260, March.
    15. Wee, H.M. & Yu, Jonas & Chen, M.C., 2007. "Optimal inventory model for items with imperfect quality and shortage backordering," Omega, Elsevier, vol. 35(1), pages 7-11, February.
    16. Sana, Shib Sankar, 2010. "A production-inventory model in an imperfect production process," European Journal of Operational Research, Elsevier, vol. 200(2), pages 451-464, January.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Harun Öztürk, 2021. "Optimal production run time for an imperfect production inventory system with rework, random breakdowns and inspection costs," Operational Research, Springer, vol. 21(1), pages 167-204, March.
    2. Janssen, Larissa & Claus, Thorsten & Sauer, Jürgen, 2016. "Literature review of deteriorating inventory models by key topics from 2012 to 2015," International Journal of Production Economics, Elsevier, vol. 182(C), pages 86-112.
    3. Wu, Jiang & Ouyang, Liang-Yuh & Cárdenas-Barrón, Leopoldo Eduardo & Goyal, Suresh Kumar, 2014. "Optimal credit period and lot size for deteriorating items with expiration dates under two-level trade credit financing," European Journal of Operational Research, Elsevier, vol. 237(3), pages 898-908.
    4. Cheng, Guo Qing & Zhou, Bing Hai & Li, Ling, 2018. "Integrated production, quality control and condition-based maintenance for imperfect production systems," Reliability Engineering and System Safety, Elsevier, vol. 175(C), pages 251-264.
    5. Assid, M. & Gharbi, A. & Dhouib, K., 2015. "Joint production and subcontracting planning of unreliable multi-facility multi-product production systems," Omega, Elsevier, vol. 50(C), pages 54-69.
    6. Liping Liu & Lining Jiang & Ding Zhang, 2017. "An integrated model of statistical process control and condition-based maintenance for deteriorating systems," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 68(11), pages 1452-1460, November.
    7. Kim, Jerim & Son, Sung-Yong & Lee, Jung-Min & Ha, Hyung-Tae, 2017. "Scheduling and performance analysis under a stochastic model for electric vehicle charging stations," Omega, Elsevier, vol. 66(PB), pages 278-289.
    8. Baldi, Mauro M. & Heinicke, Franziska & Simroth, Axel & Tadei, Roberto, 2016. "New heuristics for the Stochastic Tactical Railway Maintenance Problem," Omega, Elsevier, vol. 63(C), pages 94-102.
    9. Hauck, Zsuzsanna & Vörös, József, 2015. "Lot sizing in case of defective items with investments to increase the speed of quality control," Omega, Elsevier, vol. 52(C), pages 180-189.
    10. Prasanta Kumar Ghosh & Amalesh Kumar Manna & Jayanta Kumar Dey & Samarjit Kar, 2023. "Optimal production run in an imperfect production process with maintenance under warranty and product insurance," OPSEARCH, Springer;Operational Research Society of India, vol. 60(2), pages 720-752, June.
    11. Chen, Cheng-Kang & Lo, Chih-Chung & Weng, Tzu-Chun, 2017. "Optimal production run length and warranty period for an imperfect production system under selling price dependent on warranty period," European Journal of Operational Research, Elsevier, vol. 259(2), pages 401-412.
    12. K.Y. Kung & Y.D. Huang & H.M. Wee & Y. Daryanto, 2019. "Production-Inventory System for Deteriorating Items with Machine Breakdown, Inspection, and Partial Backordering," Mathematics, MDPI, vol. 7(7), pages 1-26, July.
    13. Florian Jaehn & Sergey Kovalev & Mikhail Y. Kovalyov & Erwin Pesch, 2014. "Multiproduct batching and scheduling with buffered rework: The case of a car paint shop," Naval Research Logistics (NRL), John Wiley & Sons, vol. 61(6), pages 458-471, September.
    14. Tiwari, Sunil & Kazemi, Nima & Modak, Nikunja Mohan & Cárdenas-Barrón, Leopoldo Eduardo & Sarkar, Sumon, 2020. "The effect of human errors on an integrated stochastic supply chain model with setup cost reduction and backorder price discount," International Journal of Production Economics, Elsevier, vol. 226(C).
    15. S. Priyan & P. Manivannan, 2017. "Optimal inventory modeling of supply chain system involving quality inspection errors and fuzzy defective rate," OPSEARCH, Springer;Operational Research Society of India, vol. 54(1), pages 21-43, March.
    16. Gharbi, Ali & Kenné, Jean-Pierre & Kaddachi, Rawia, 2022. "Dynamic optimal control and simulation for unreliable manufacturing systems under perishable product and shelf life variability," International Journal of Production Economics, Elsevier, vol. 247(C).
    17. Harun Öztürk, 2019. "Modeling an inventory problem with random supply, inspection and machine breakdown," OPSEARCH, Springer;Operational Research Society of India, vol. 56(2), pages 497-527, June.
    18. Li, Ting & He, Shuguang & Zhao, Xiujie & Liu, Bin, 2023. "Warranty service contracts design for deteriorating products with maintenance duration commitments," International Journal of Production Economics, Elsevier, vol. 264(C).
    19. Bouslah, B. & Gharbi, A. & Pellerin, R., 2016. "Integrated production, sampling quality control and maintenance of deteriorating production systems with AOQL constraint," Omega, Elsevier, vol. 61(C), pages 110-126.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Bouslah, B. & Gharbi, A. & Pellerin, R., 2016. "Integrated production, sampling quality control and maintenance of deteriorating production systems with AOQL constraint," Omega, Elsevier, vol. 61(C), pages 110-126.
    2. Pal, Brojeswar & Sana, Shib Sankar & Chaudhuri, Kripasindhu, 2014. "Joint pricing and ordering policy for two echelon imperfect production inventory model with two cycles," International Journal of Production Economics, Elsevier, vol. 155(C), pages 229-238.
    3. Om Prakash & A.R. Roy & A. Goswami, 2014. "Stochastic manufacturing system with process deterioration and machine breakdown," International Journal of Systems Science, Taylor & Francis Journals, vol. 45(12), pages 2539-2551, December.
    4. Sarkar, Biswajit & Sarkar, Sumon, 2013. "An improved inventory model with partial backlogging, time varying deterioration and stock-dependent demand," Economic Modelling, Elsevier, vol. 30(C), pages 924-932.
    5. Prasanta Kumar Ghosh & Amalesh Kumar Manna & Jayanta Kumar Dey & Samarjit Kar, 2023. "Optimal production run in an imperfect production process with maintenance under warranty and product insurance," OPSEARCH, Springer;Operational Research Society of India, vol. 60(2), pages 720-752, June.
    6. Jeang, Angus, 2012. "Simultaneous determination of production lot size and process parameters under process deterioration and process breakdown," Omega, Elsevier, vol. 40(6), pages 774-781.
    7. Ata Allah Taleizadeh, 2018. "A constrained integrated imperfect manufacturing-inventory system with preventive maintenance and partial backordering," Annals of Operations Research, Springer, vol. 261(1), pages 303-337, February.
    8. Pentico, David W. & Drake, Matthew J. & Toews, Carl, 2009. "The deterministic EPQ with partial backordering: A new approach," Omega, Elsevier, vol. 37(3), pages 624-636, June.
    9. Ramasesh, Ranga V., 2010. "Lot-sizing decisions under limited-time price incentives: A review," Omega, Elsevier, vol. 38(3-4), pages 118-135, June.
    10. Tapan Kumar Datta, 2017. "Inventory system with defective products and investment opportunity for reducing defective proportion," Operational Research, Springer, vol. 17(1), pages 297-312, April.
    11. Teng, Jinn-Tsair & Min, Jie & Pan, Qinhua, 2012. "Economic order quantity model with trade credit financing for non-decreasing demand," Omega, Elsevier, vol. 40(3), pages 328-335.
    12. Bouslah, Bassem & Gharbi, Ali & Pellerin, Robert, 2013. "Joint optimal lot sizing and production control policy in an unreliable and imperfect manufacturing system," International Journal of Production Economics, Elsevier, vol. 144(1), pages 143-156.
    13. (Ai-Chih) Chang, Jasmine & Lu, Haibing & (Junmin) Shi, Jim, 2019. "Stockout risk of production-inventory systems with compound Poisson demands," Omega, Elsevier, vol. 83(C), pages 181-198.
    14. R. Sundara rajan & R. Uthayakumar, 2017. "Comprehensive solution procedure for optimizing replenishment policies of instantaneous deteriorating items with stock-dependent demand under partial trade credit linked to order quantity," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 8(2), pages 1343-1373, November.
    15. Berthaut, F. & Gharbi, A. & Dhouib, K., 2011. "Joint modified block replacement and production/inventory control policy for a failure-prone manufacturing cell," Omega, Elsevier, vol. 39(6), pages 642-654, December.
    16. Mukhopadhyay, Samar K. & Ma, Huafan, 2009. "Joint procurement and production decisions in remanufacturing under quality and demand uncertainty," International Journal of Production Economics, Elsevier, vol. 120(1), pages 5-17, July.
    17. Harun Öztürk, 2021. "Optimal production run time for an imperfect production inventory system with rework, random breakdowns and inspection costs," Operational Research, Springer, vol. 21(1), pages 167-204, March.
    18. Dhouib, K. & Gharbi, A. & Ben Aziza, M.N., 2012. "Joint optimal production control/preventive maintenance policy for imperfect process manufacturing cell," International Journal of Production Economics, Elsevier, vol. 137(1), pages 126-136.
    19. Sarkar, Biswajit & Guchhait, Rekha & Sarkar, Mitali & Cárdenas-Barrón, Leopoldo Eduardo, 2019. "How does an industry manage the optimum cash flow within a smart production system with the carbon footprint and carbon emission under logistics framework?," International Journal of Production Economics, Elsevier, vol. 213(C), pages 243-257.
    20. Hsu, Jia-Tzer & Hsu, Lie-Fern, 2013. "An EOQ model with imperfect quality items, inspection errors, shortage backordering, and sales returns," International Journal of Production Economics, Elsevier, vol. 143(1), pages 162-170.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:jomega:v:41:y:2013:i:6:p:941-954. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/wps/find/journaldescription.cws_home/375/description#description .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.