IDEAS home Printed from https://ideas.repec.org/a/spr/jcomop/v41y2021i1d10.1007_s10878-020-00657-2.html
   My bibliography  Save this article

Improved approximation algorithms for two-stage flexible flow shop scheduling

Author

Listed:
  • Anzhen Peng

    (Xiamen University)

  • Longcheng Liu

    (Xiamen University)

  • Weifeng Lin

    (Xiamen University)

Abstract

A two-stage flexible flow shop scheduling is a manufacturing infrastructure designed to process a set of jobs, in which a single machine is available at the first stage and m parallel machines are available at the second stage. At the second stage, each task can be processed by multiple parallel machines. The objective is to minimize the maximum job completion time, i.e., the makespan. Sun et al. (J Softw 25:298–313, 2014) presented an $$O(n\log n)$$ O ( n log n ) -time 3-approximation algorithm for $$F2(1, Pm)~|~size_i~|~C_{\max }$$ F 2 ( 1 , P m ) | s i z e i | C max under some special conditions. Zhang et al. (J Comb Optim 39:1–14, 2020) presented a 2.5-approximation algorithm for $$F2(1, P2)~|~line_i~|~C_{\max }$$ F 2 ( 1 , P 2 ) | l i n e i | C max and a 2.67-approximation algorithm for $$F2(1, P3)~|~line_i~|~C_{\max }$$ F 2 ( 1 , P 3 ) | l i n e i | C max , which both run in linear time. In this paper, we achieved following improved results: for $$F2(1, P2)~|~line_i~|~C_{\max }$$ F 2 ( 1 , P 2 ) | l i n e i | C max , we present an $$O(n\log n)$$ O ( n log n ) -time 2.25-approximation algorithm, for $$F2(1, P3)~|~line_i~|~C_{\max }$$ F 2 ( 1 , P 3 ) | l i n e i | C max , we present an $$O(n\log n)$$ O ( n log n ) -time 7/3-approximation algorithm, for $$F2(1, Pm)~|~size_i~|~C_{\max }$$ F 2 ( 1 , P m ) | s i z e i | C max with the assumption $$ \mathop {\min }_{1 \le i \le n} \left\{ {{p_{1i}}} \right\} \ge \mathop {\max }_{1 \le i \le n} \left\{ {{p_{2i}}} \right\} $$ min 1 ≤ i ≤ n p 1 i ≥ max 1 ≤ i ≤ n p 2 i , we present a linear time optimal algorithm.

Suggested Citation

  • Anzhen Peng & Longcheng Liu & Weifeng Lin, 2021. "Improved approximation algorithms for two-stage flexible flow shop scheduling," Journal of Combinatorial Optimization, Springer, vol. 41(1), pages 28-42, January.
  • Handle: RePEc:spr:jcomop:v:41:y:2021:i:1:d:10.1007_s10878-020-00657-2
    DOI: 10.1007/s10878-020-00657-2
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1007/s10878-020-00657-2
    File Function: Abstract
    Download Restriction: Access to the full text of the articles in this series is restricted.

    File URL: https://libkey.io/10.1007/s10878-020-00657-2?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Minghui Zhang & Yan Lan & Xin Han, 2020. "Approximation algorithms for two-stage flexible flow shop scheduling," Journal of Combinatorial Optimization, Springer, vol. 39(1), pages 1-14, January.
    2. Lin, Hung-Tso & Liao, Ching-Jong, 2003. "A case study in a two-stage hybrid flow shop with setup time and dedicated machines," International Journal of Production Economics, Elsevier, vol. 86(2), pages 133-143, November.
    3. Almeder, Christian & Hartl, Richard F., 2013. "A metaheuristic optimization approach for a real-world stochastic flexible flow shop problem with limited buffer," International Journal of Production Economics, Elsevier, vol. 145(1), pages 88-95.
    4. Byung-Cheon Choi & Kangbok Lee, 2013. "Two-stage proportionate flexible flow shop to minimize the makespan," Journal of Combinatorial Optimization, Springer, vol. 25(1), pages 123-134, January.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Minghui Zhang & Yan Lan & Xin Han, 2020. "Approximation algorithms for two-stage flexible flow shop scheduling," Journal of Combinatorial Optimization, Springer, vol. 39(1), pages 1-14, January.
    2. Li, Zhan-tao & Chen, Qing-xin & Mao, Ning & Wang, Xiaoming & Liu, Jianjun, 2013. "Scheduling rules for two-stage flexible flow shop scheduling problem subject to tail group constraint," International Journal of Production Economics, Elsevier, vol. 146(2), pages 667-678.
    3. Gerstl, Enrique & Mosheiov, Gur, 2014. "A two-stage flexible flow shop problem with unit-execution-time jobs and batching," International Journal of Production Economics, Elsevier, vol. 158(C), pages 171-178.
    4. Lin, Hung-Tso & Lee, Hong-Tau & Pan, Wen-Jung, 2008. "Heuristics for scheduling in a no-wait open shop with movable dedicated machines," International Journal of Production Economics, Elsevier, vol. 111(2), pages 368-377, February.
    5. Mohamed Haouari & Lotfi Hidri & Anis Gharbi, 2006. "Optimal Scheduling of a Two-stage Hybrid Flow Shop," Mathematical Methods of Operations Research, Springer;Gesellschaft für Operations Research (GOR);Nederlands Genootschap voor Besliskunde (NGB), vol. 64(1), pages 107-124, August.
    6. Hejer Khlif Hachicha & Farah Zeghal Mansour, 2018. "Two-MILP models for scheduling elective surgeries within a private healthcare facility," Health Care Management Science, Springer, vol. 21(3), pages 376-392, September.
    7. Heydar, Mojtaba & Mardaneh, Elham & Loxton, Ryan, 2022. "Approximate dynamic programming for an energy-efficient parallel machine scheduling problem," European Journal of Operational Research, Elsevier, vol. 302(1), pages 363-380.
    8. Jin, Zhihong & Yang, Zan & Ito, Takahiro, 2006. "Metaheuristic algorithms for the multistage hybrid flowshop scheduling problem," International Journal of Production Economics, Elsevier, vol. 100(2), pages 322-334, April.
    9. Chou, Fuh-Der, 2013. "Particle swarm optimization with cocktail decoding method for hybrid flow shop scheduling problems with multiprocessor tasks," International Journal of Production Economics, Elsevier, vol. 141(1), pages 137-145.
    10. Diaz, Juan Esteban & Handl, Julia & Xu, Dong-Ling, 2018. "Integrating meta-heuristics, simulation and exact techniques for production planning of a failure-prone manufacturing system," European Journal of Operational Research, Elsevier, vol. 266(3), pages 976-989.
    11. Chen, Yin-Yann & Cheng, Chen-Yang & Wang, Li-Chih & Chen, Tzu-Li, 2013. "A hybrid approach based on the variable neighborhood search and particle swarm optimization for parallel machine scheduling problems—A case study for solar cell industry," International Journal of Production Economics, Elsevier, vol. 141(1), pages 66-78.
    12. Pang, King-Wah, 2013. "A genetic algorithm based heuristic for two machine no-wait flowshop scheduling problems with class setup times that minimizes maximum lateness," International Journal of Production Economics, Elsevier, vol. 141(1), pages 127-136.
    13. Allahverdi, Ali & Soroush, H.M., 2008. "The significance of reducing setup times/setup costs," European Journal of Operational Research, Elsevier, vol. 187(3), pages 978-984, June.
    14. Antonio Costa & Fulvio Antonio Cappadonna & Sergio Fichera, 2017. "A hybrid genetic algorithm for minimizing makespan in a flow-shop sequence-dependent group scheduling problem," Journal of Intelligent Manufacturing, Springer, vol. 28(6), pages 1269-1283, August.
    15. Missaoui, Ahmed & Ruiz, Rubén, 2022. "A parameter-Less iterated greedy method for the hybrid flowshop scheduling problem with setup times and due date windows," European Journal of Operational Research, Elsevier, vol. 303(1), pages 99-113.
    16. Feng, Hanxin & Xi, Lifeng & Xiao, Lei & Xia, Tangbin & Pan, Ershun, 2018. "Imperfect preventive maintenance optimization for flexible flowshop manufacturing cells considering sequence-dependent group scheduling," Reliability Engineering and System Safety, Elsevier, vol. 176(C), pages 218-229.
    17. Chen-Fu Chien & Chung-Jen Kuo & Chih-Min Yu, 2020. "Tool allocation to smooth work-in-process for cycle time reduction and an empirical study," Annals of Operations Research, Springer, vol. 290(1), pages 1009-1033, July.
    18. Allahverdi, Ali & Ng, C.T. & Cheng, T.C.E. & Kovalyov, Mikhail Y., 2008. "A survey of scheduling problems with setup times or costs," European Journal of Operational Research, Elsevier, vol. 187(3), pages 985-1032, June.
    19. Marco Schulze & Julia Rieck & Cinna Seifi & Jürgen Zimmermann, 2016. "Machine scheduling in underground mining: an application in the potash industry," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 38(2), pages 365-403, March.
    20. Ruiz, Rubén & Vázquez-Rodríguez, José Antonio, 2010. "The hybrid flow shop scheduling problem," European Journal of Operational Research, Elsevier, vol. 205(1), pages 1-18, August.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:jcomop:v:41:y:2021:i:1:d:10.1007_s10878-020-00657-2. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.