The two-machine flowshop scheduling problem with sequence-independent setup times: New lower bounding strategies
Author
Abstract
Suggested Citation
DOI: 10.1016/j.ejor.2013.05.031
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Della Croce, F. & Narayan, V. & Tadei, R., 1996. "The two-machine total completion time flow shop problem," European Journal of Operational Research, Elsevier, vol. 90(2), pages 227-237, April.
- Chris N. Potts & Luk N. Van Wassenhove, 1985. "A Branch and Bound Algorithm for the Total Weighted Tardiness Problem," Operations Research, INFORMS, vol. 33(2), pages 363-377, April.
- Allahverdi, Ali & Gupta, Jatinder N. D. & Aldowaisan, Tariq, 1999. "A review of scheduling research involving setup considerations," Omega, Elsevier, vol. 27(2), pages 219-239, April.
- Ahmadi, Reza H. & Bagchi, Uttarayan, 1990. "Improved lower bounds for minimizing the sum of completion times of n jobs over m machines in a flow shop," European Journal of Operational Research, Elsevier, vol. 44(3), pages 331-336, February.
- Allahverdi, Ali & Ng, C.T. & Cheng, T.C.E. & Kovalyov, Mikhail Y., 2008. "A survey of scheduling problems with setup times or costs," European Journal of Operational Research, Elsevier, vol. 187(3), pages 985-1032, June.
- Brucker, Peter & Knust, Sigrid & Wang, Guoqing, 2005. "Complexity results for flow-shop problems with a single server," European Journal of Operational Research, Elsevier, vol. 165(2), pages 398-407, September.
- Akkan, Can & Karabati, Selcuk, 2004. "The two-machine flowshop total completion time problem: Improved lower bounds and a branch-and-bound algorithm," European Journal of Operational Research, Elsevier, vol. 159(2), pages 420-429, December.
- Al-Anzi, Fawaz S. & Allahverdi, Ali, 2007. "A self-adaptive differential evolution heuristic for two-stage assembly scheduling problem to minimize maximum lateness with setup times," European Journal of Operational Research, Elsevier, vol. 182(1), pages 80-94, October.
- Della Croce, F. & Ghirardi, M. & Tadei, R., 2002. "An improved branch-and-bound algorithm for the two machine total completion time flow shop problem," European Journal of Operational Research, Elsevier, vol. 139(2), pages 293-301, June.
- Allahverdi, Ali & Soroush, H.M., 2008. "The significance of reducing setup times/setup costs," European Journal of Operational Research, Elsevier, vol. 187(3), pages 978-984, June.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Allahverdi, Ali, 2015. "The third comprehensive survey on scheduling problems with setup times/costs," European Journal of Operational Research, Elsevier, vol. 246(2), pages 345-378.
- S Afshin Mansouri & Emel Aktas, 2016. "Minimizing energy consumption and makespan in a two-machine flowshop scheduling problem," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 67(11), pages 1382-1394, November.
- Detienne, Boris & Sadykov, Ruslan & Tanaka, Shunji, 2016. "The two-machine flowshop total completion time problem: Branch-and-bound algorithms based on network-flow formulation," European Journal of Operational Research, Elsevier, vol. 252(3), pages 750-760.
- Shen, Yilan & Zhang, Xi & Shi, Leyuan, 2022. "Joint optimization of production and maintenance for a serial–parallel hybrid two-stage production system," Reliability Engineering and System Safety, Elsevier, vol. 226(C).
- Sioud, A. & Gagné, C., 2018. "Enhanced migrating birds optimization algorithm for the permutation flow shop problem with sequence dependent setup times," European Journal of Operational Research, Elsevier, vol. 264(1), pages 66-73.
- Mansouri, S. Afshin & Aktas, Emel & Besikci, Umut, 2016. "Green scheduling of a two-machine flowshop: Trade-off between makespan and energy consumption," European Journal of Operational Research, Elsevier, vol. 248(3), pages 772-788.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Detienne, Boris & Sadykov, Ruslan & Tanaka, Shunji, 2016. "The two-machine flowshop total completion time problem: Branch-and-bound algorithms based on network-flow formulation," European Journal of Operational Research, Elsevier, vol. 252(3), pages 750-760.
- Mohamed Ali Rakrouki & Anis Kooli & Sabrine Chalghoumi & Talel Ladhari, 2020. "A branch-and-bound algorithm for the two-machine total completion time flowshop problem subject to release dates," Operational Research, Springer, vol. 20(1), pages 21-35, March.
- Og[breve]uz, Ceyda & Sibel Salman, F. & Bilgintürk YalçIn, Zehra, 2010. "Order acceptance and scheduling decisions in make-to-order systems," International Journal of Production Economics, Elsevier, vol. 125(1), pages 200-211, May.
- Sheikh, Shaya & Komaki, G.M. & Kayvanfar, Vahid & Teymourian, Ehsan, 2019. "Multi-Stage assembly flow shop with setup time and release time," Operations Research Perspectives, Elsevier, vol. 6(C).
- Allahverdi, Ali & Al-Anzi, Fawaz S., 2006. "A branch-and-bound algorithm for three-machine flowshop scheduling problem to minimize total completion time with separate setup times," European Journal of Operational Research, Elsevier, vol. 169(3), pages 767-780, March.
- Hatami, Sara & Ruiz, Rubén & Andrés-Romano, Carlos, 2015. "Heuristics and metaheuristics for the distributed assembly permutation flowshop scheduling problem with sequence dependent setup times," International Journal of Production Economics, Elsevier, vol. 169(C), pages 76-88.
- Pan, Quan-Ke & Ruiz, Rubén, 2012. "An estimation of distribution algorithm for lot-streaming flow shop problems with setup times," Omega, Elsevier, vol. 40(2), pages 166-180, April.
- Federico Della Croce & Andrea Grosso & Fabio Salassa, 2014. "A matheuristic approach for the two-machine total completion time flow shop problem," Annals of Operations Research, Springer, vol. 213(1), pages 67-78, February.
- Pang, King-Wah, 2013. "A genetic algorithm based heuristic for two machine no-wait flowshop scheduling problems with class setup times that minimizes maximum lateness," International Journal of Production Economics, Elsevier, vol. 141(1), pages 127-136.
- Hosseini, Amir & Otto, Alena & Pesch, Erwin, 2024. "Scheduling in manufacturing with transportation: Classification and solution techniques," European Journal of Operational Research, Elsevier, vol. 315(3), pages 821-843.
- Allahverdi, Ali, 2015. "The third comprehensive survey on scheduling problems with setup times/costs," European Journal of Operational Research, Elsevier, vol. 246(2), pages 345-378.
- Ladhari, Talel & Rakrouki, Mohamed Ali, 2009. "Heuristics and lower bounds for minimizing the total completion time in a two-machine flowshop," International Journal of Production Economics, Elsevier, vol. 122(2), pages 678-691, December.
- S Yanai & T Fujie, 2006. "A three-machine permutation flow-shop problem with minimum makespan on the second machine," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 57(4), pages 460-468, April.
- Allahverdi, Ali & Aydilek, Harun, 2014. "Total completion time with makespan constraint in no-wait flowshops with setup times," European Journal of Operational Research, Elsevier, vol. 238(3), pages 724-734.
- Allahverdi, Ali, 2016. "A survey of scheduling problems with no-wait in process," European Journal of Operational Research, Elsevier, vol. 255(3), pages 665-686.
- Lin, Bertrand M.T. & Lin, Y.-Y. & Fang, K.-T., 2013. "Two-machine flow shop scheduling of polyurethane foam production," International Journal of Production Economics, Elsevier, vol. 141(1), pages 286-294.
- Stefansdottir, Bryndis & Grunow, Martin & Akkerman, Renzo, 2017. "Classifying and modeling setups and cleanings in lot sizing and scheduling," European Journal of Operational Research, Elsevier, vol. 261(3), pages 849-865.
- Dominik Kress & David Müller & Jenny Nossack, 2019. "A worker constrained flexible job shop scheduling problem with sequence-dependent setup times," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 41(1), pages 179-217, March.
- Marko Ɖurasević & Domagoj Jakobović, 2019. "Creating dispatching rules by simple ensemble combination," Journal of Heuristics, Springer, vol. 25(6), pages 959-1013, December.
- Wang, Ling & Sun, Lin-Yan & Sun, Lin-Hui & Wang, Ji-Bo, 2010. "On three-machine flow shop scheduling with deteriorating jobs," International Journal of Production Economics, Elsevier, vol. 125(1), pages 185-189, May.
More about this item
Keywords
Scheduling; Two-machine flowshop; Sequence-independent setup times; Total completion time; Lower bounds; Lagrangian relaxation;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:231:y:2013:i:1:p:69-78. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.