IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v163y2005i3p575-588.html
   My bibliography  Save this article

Supply chain management and advanced planning--basics, overview and challenges

Author

Listed:
  • Stadtler, Hartmut

Abstract

No abstract is available for this item.

Suggested Citation

  • Stadtler, Hartmut, 2005. "Supply chain management and advanced planning--basics, overview and challenges," European Journal of Operational Research, Elsevier, vol. 163(3), pages 575-588, June.
  • Handle: RePEc:eee:ejores:v:163:y:2005:i:3:p:575-588
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(04)00118-3
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Carlsson, Dick & Ronnqvist, Mikael, 2005. "Supply chain management in forestry--case studies at Sodra Cell AB," European Journal of Operational Research, Elsevier, vol. 163(3), pages 589-616, June.
    2. Spitter, J. M. & Hurkens, C. A. J. & de Kok, A. G. & Lenstra, J. K. & Negenman, E. G., 2005. "Linear programming models with planned lead times for supply chain operations planning," European Journal of Operational Research, Elsevier, vol. 163(3), pages 706-720, June.
    3. Dudek, Gregor & Stadtler, Hartmut, 2005. "Negotiation-based collaborative planning between supply chains partners," European Journal of Operational Research, Elsevier, vol. 163(3), pages 668-687, June.
    4. Rom, Walter O. & Tukel, Oya Icmeli & Muscatello, Joseph R., 2002. "MRP in a job shop environment using a resource constrained project scheduling model," Omega, Elsevier, vol. 30(4), pages 275-286, August.
    5. Kolisch, Rainer, 2001. "Make-to-order assembly management," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 14979, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    6. WOLSEY, Laurence, 2002. "Solving multi-item lot-sizing problems with an MIP solver using classification and reformulation," LIDAM Discussion Papers CORE 2002012, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
    7. Sürie, Christopher & Stadtler, Hartmut, 2002. "The capacitated lot-sizing problem with linked lot-sizes," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 49142, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    8. de Kok, Ton G. & Visschers, Jeremy W. C. H., 1999. "Analysis of assembly systems with service level constraints," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 313-326, March.
    9. Laurence A. Wolsey, 2002. "Solving Multi-Item Lot-Sizing Problems with an MIP Solver Using Classification and Reformulation," Management Science, INFORMS, vol. 48(12), pages 1587-1602, December.
    10. Suvrajeet Sen & Julia L. Higle, 1999. "An Introductory Tutorial on Stochastic Linear Programming Models," Interfaces, INFORMS, vol. 29(2), pages 33-61, April.
    11. Paul Glasserman & Sridhar Tayur, 1995. "Sensitivity Analysis for Base-Stock Levels in Multiechelon Production-Inventory Systems," Management Science, INFORMS, vol. 41(2), pages 263-281, February.
    12. Corbett, Charles J. & DeCroix, Gregory A. & Ha, Albert Y., 2005. "Optimal shared-savings contracts in supply chains: Linear contracts and double moral hazard," European Journal of Operational Research, Elsevier, vol. 163(3), pages 653-667, June.
    13. Persson, Jan A. & Gothe-Lundgren, Maud, 2005. "Shipment planning at oil refineries using column generation and valid inequalities," European Journal of Operational Research, Elsevier, vol. 163(3), pages 631-652, June.
    14. Arnd Huchzermeier & Ananth Iyer & Julia Freiheit, 2002. "The Supply Chain Impact of Smart Customers in a Promotional Environment," Manufacturing & Service Operations Management, INFORMS, vol. 4(3), pages 228-240, November.
    15. Stadtler, Hartmut, 2002. "Multi-level capacitated lot-sizing and resource constrained project scheduling : an integrating perspective," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 49141, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    16. WOLSEY, Laurence A., 2002. "Solving multi-item lot-sizing problems with an MIP solver using classification and reformulation," LIDAM Reprints CORE 1605, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
    17. Nielsen, Christina & Larsen, Christian, 2005. "An analytical study of the Q(s,S) policy applied to the joint replenishment problem," European Journal of Operational Research, Elsevier, vol. 163(3), pages 721-732, June.
    18. Kamalini Ramdas & Robert E. Spekman, 2000. "Chain or Shackles: Understanding What Drives Supply-Chain Performance," Interfaces, INFORMS, vol. 30(4), pages 3-21, August.
    19. Pfeiffer, Thomas, 1999. "Transfer pricing and decentralized dynamic lot-sizing in multistage, multiproduct production processes," European Journal of Operational Research, Elsevier, vol. 116(2), pages 319-330, July.
    20. Robert E., Theodore M., Lynn A., Thomas C. Spekman Forbes, III Isabella MacAvoy, 1998. "Alliance Management: A View from the Past and a Look to the Future," Journal of Management Studies, Wiley Blackwell, vol. 35(6), pages 747-772, November.
    21. Fleischmann, B. & Meyr, H., 2003. "Customer Orientation in Advanced Planning Systems," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 36728, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    22. Robotis, Andreas & Bhattacharya, Shantanu & Van Wassenhove, Luk N., 2005. "The effect of remanufacturing on procurement decisions for resellers in secondary markets," European Journal of Operational Research, Elsevier, vol. 163(3), pages 688-705, June.
    23. Arbib, Claudio & Marinelli, Fabrizio, 2005. "Integrating process optimization and inventory planning in cutting-stock with skiving option: An optimization model and its application," European Journal of Operational Research, Elsevier, vol. 163(3), pages 617-630, June.
    24. Dellaert, N. & Jeunet, J., 2005. "An alternative to safety stock policies for multi-level rolling schedule MRP problems," European Journal of Operational Research, Elsevier, vol. 163(3), pages 751-768, June.
    25. Drexl, A. & Kimms, A., 1997. "Lot sizing and scheduling -- Survey and extensions," European Journal of Operational Research, Elsevier, vol. 99(2), pages 221-235, June.
    26. Escudero, L. F. & Galindo, E. & Garcia, G. & Gomez, E. & Sabau, V., 1999. "Schumann, a modeling framework for supply chain management under uncertainty," European Journal of Operational Research, Elsevier, vol. 119(1), pages 14-34, November.
    27. Sleptchenko, A. & van der Heijden, M. C. & van Harten, A., 2005. "Using repair priorities to reduce stock investment in spare part networks," European Journal of Operational Research, Elsevier, vol. 163(3), pages 733-750, June.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Almeder, Christian & Klabjan, Diego & Traxler, Renate & Almada-Lobo, Bernardo, 2015. "Lead time considerations for the multi-level capacitated lot-sizing problem," European Journal of Operational Research, Elsevier, vol. 241(3), pages 727-738.
    2. Toledo, Franklina Maria Bragion & Armentano, Vinicius Amaral, 2006. "A Lagrangian-based heuristic for the capacitated lot-sizing problem in parallel machines," European Journal of Operational Research, Elsevier, vol. 175(2), pages 1070-1083, December.
    3. Guimarães, Luis & Klabjan, Diego & Almada-Lobo, Bernardo, 2013. "Pricing, relaxing and fixing under lot sizing and scheduling," European Journal of Operational Research, Elsevier, vol. 230(2), pages 399-411.
    4. Jans, Raf & Degraeve, Zeger, 2007. "Meta-heuristics for dynamic lot sizing: A review and comparison of solution approaches," European Journal of Operational Research, Elsevier, vol. 177(3), pages 1855-1875, March.
    5. Lee, Younsoo & Lee, Kyungsik, 2020. "Lot-sizing and scheduling in flat-panel display manufacturing process," Omega, Elsevier, vol. 93(C).
    6. Kaczmarczyk, Waldemar, 2020. "Valid inequalities for proportional lot-sizing and scheduling problem with fictitious microperiods," International Journal of Production Economics, Elsevier, vol. 219(C), pages 236-247.
    7. G. Rius-Sorolla & J. Maheut & S. Estellés-Miguel & J. P. García-Sabater, 2021. "Operations planning test bed under rolling horizons, multiproduct, multiechelon, multiprocess for capacitated production planning modelling with strokes," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 29(4), pages 1289-1315, December.
    8. Gajpal, Yuvraj & Nourelfath, Mustapha, 2015. "Two efficient heuristics to solve the integrated load distribution and production planning problem," Reliability Engineering and System Safety, Elsevier, vol. 144(C), pages 204-214.
    9. Brian T. Denton & John Forrest & R. John Milne, 2006. "IBM Solves a Mixed-Integer Program to Optimize Its Semiconductor Supply Chain," Interfaces, INFORMS, vol. 36(5), pages 386-399, October.
    10. Nazrul Shaikh & Vittal Prabhu & Danilo Abril & David Sánchez & Jorge Arias & Esteban Rodríguez & Germán Riaño, 2011. "Kimberly-Clark Latin America Builds an Optimization-Based System for Machine Scheduling," Interfaces, INFORMS, vol. 41(5), pages 455-465, October.
    11. Nourelfath, Mustapha, 2011. "Service level robustness in stochastic production planning under random machine breakdowns," European Journal of Operational Research, Elsevier, vol. 212(1), pages 81-88, July.
    12. Nourelfath, Mustapha & Yalaoui, Farouk, 2012. "Integrated load distribution and production planning in series-parallel multi-state systems with failure rate depending on load," Reliability Engineering and System Safety, Elsevier, vol. 106(C), pages 138-145.
    13. Kerem Akartunalı & Andrew Miller, 2012. "A computational analysis of lower bounds for big bucket production planning problems," Computational Optimization and Applications, Springer, vol. 53(3), pages 729-753, December.
    14. Arbib, Claudio & Marinelli, Fabrizio, 2005. "Integrating process optimization and inventory planning in cutting-stock with skiving option: An optimization model and its application," European Journal of Operational Research, Elsevier, vol. 163(3), pages 617-630, June.
    15. Tiacci, Lorenzo & Saetta, Stefano, 2012. "Demand forecasting, lot sizing and scheduling on a rolling horizon basis," International Journal of Production Economics, Elsevier, vol. 140(2), pages 803-814.
    16. Nourelfath, Mustapha & Nahas, Nabil & Ben-Daya, Mohamed, 2016. "Integrated preventive maintenance and production decisions for imperfect processes," Reliability Engineering and System Safety, Elsevier, vol. 148(C), pages 21-31.
    17. Wei, Wenchao & Guimarães, Luis & Amorim, Pedro & Almada-Lobo, Bernardo, 2017. "Tactical production and distribution planning with dependency issues on the production process," Omega, Elsevier, vol. 67(C), pages 99-114.
    18. Francesco Gaglioppa & Lisa A. Miller & Saif Benjaafar, 2008. "Multitask and Multistage Production Planning and Scheduling for Process Industries," Operations Research, INFORMS, vol. 56(4), pages 1010-1025, August.
    19. E Aghezzaf, 2005. "Capacity planning and warehouse location in supply chains with uncertain demands," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(4), pages 453-462, April.
    20. Karina Copil & Martin Wörbelauer & Herbert Meyr & Horst Tempelmeier, 2017. "Simultaneous lotsizing and scheduling problems: a classification and review of models," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 39(1), pages 1-64, January.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:163:y:2005:i:3:p:575-588. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.