IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v113y1999i3p560-567.html
   My bibliography  Save this article

Ranking of generalised multi-stage KANBAN policies

Author

Listed:
  • Axsater, Sven
  • Rosling, Kaj

Abstract

No abstract is available for this item.

Suggested Citation

  • Axsater, Sven & Rosling, Kaj, 1999. "Ranking of generalised multi-stage KANBAN policies," European Journal of Operational Research, Elsevier, vol. 113(3), pages 560-567, March.
  • Handle: RePEc:eee:ejores:v:113:y:1999:i:3:p:560-567
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(98)00122-2
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Peter R. Winters, 1962. "Constrained Inventory Rules for Production Smoothing," Management Science, INFORMS, vol. 8(4), pages 470-481, July.
    2. Axsater, Sven & Rosling, Kaj, 1994. "Multi-level production-inventory control: Material requirements planning or reorder point policies?," European Journal of Operational Research, Elsevier, vol. 75(2), pages 405-412, June.
    3. Buzacott, J. A., 1989. "Queueing models of Kanban and MRP controlled production systems," Engineering Costs and Production Economics, Elsevier, vol. 17(1-4), pages 3-20, August.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. de Kok, Ton & Grob, Christopher & Laumanns, Marco & Minner, Stefan & Rambau, Jörg & Schade, Konrad, 2018. "A typology and literature review on stochastic multi-echelon inventory models," European Journal of Operational Research, Elsevier, vol. 269(3), pages 955-983.
    2. S Wang & B R Sarker, 2004. "A single-stage supply chain system controlled by kanban under just-in-time philosophy," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 55(5), pages 485-494, May.
    3. Wallace J. Hopp & Mark L. Spearman, 2004. "To Pull or Not to Pull: What Is the Question?," Manufacturing & Service Operations Management, INFORMS, vol. 6(2), pages 133-148, August.
    4. Rodney P. Parker & Roman Kapuscinski, 2004. "Optimal Policies for a Capacitated Two-Echelon Inventory System," Operations Research, INFORMS, vol. 52(5), pages 739-755, October.
    5. Wang, Shaojun & Sarker, Bhaba R., 2005. "An assembly-type supply chain system controlled by kanbans under a just-in-time delivery policy," European Journal of Operational Research, Elsevier, vol. 162(1), pages 153-172, April.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Wallace J. Hopp & Mark L. Spearman, 2004. "To Pull or Not to Pull: What Is the Question?," Manufacturing & Service Operations Management, INFORMS, vol. 6(2), pages 133-148, August.
    2. Tardif, Valerie & Maaseidvaag, Lars, 2001. "An adaptive approach to controlling kanban systems," European Journal of Operational Research, Elsevier, vol. 132(2), pages 411-424, July.
    3. Wilhelm, W. E. & Som, Pradip, 1998. "Analysis of a single-stage, single-product, stochastic, MRP-controlled assembly system," European Journal of Operational Research, Elsevier, vol. 108(1), pages 74-93, July.
    4. Kim, Ilhyung & Tang, Christopher S., 1997. "Lead time and response time in a pull production control system," European Journal of Operational Research, Elsevier, vol. 101(3), pages 474-485, September.
    5. Jacobs, F. Robert & Bendoly, Elliot, 2003. "Enterprise resource planning: Developments and directions for operations management research," European Journal of Operational Research, Elsevier, vol. 146(2), pages 233-240, April.
    6. van Houtum, G. J. & Inderfurth, K. & Zijm, W. H. M., 1996. "Materials coordination in stochastic multi-echelon systems," European Journal of Operational Research, Elsevier, vol. 95(1), pages 1-23, November.
    7. Monthatipkul, Chumpol & Yenradee, Pisal, 2008. "Inventory/distribution control system in a one-warehouse/multi-retailer supply chain," International Journal of Production Economics, Elsevier, vol. 114(1), pages 119-133, July.
    8. Driessen, M.A. & van Houtum, G.J. & Zijm, W.H.M. & Rustenburg, W.D., 2020. "Capacity assignment in repair shops with high material uncertainty," International Journal of Production Economics, Elsevier, vol. 221(C).
    9. Liberopoulos, George & Koukoumialos, Stelios, 2005. "Tradeoffs between base stock levels, numbers of kanbans, and planned supply lead times in production/inventory systems with advance demand information," International Journal of Production Economics, Elsevier, vol. 96(2), pages 213-232, May.
    10. Gaury, E.G.A. & Kleijnen, J.P.C. & Pierreval, H., 1998. "Customized Pull Systems for Single-Product Flow Lines," Other publications TiSEM ac7da569-7495-4fc4-a4e1-0, Tilburg University, School of Economics and Management.
    11. Hautaniemi, Petri & Pirttila, Timo, 1999. "The choice of replenishment policies in an MRP environment," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 85-92, March.
    12. Karaesmen, Fikri & Dallery, Yves, 2000. "A performance comparison of pull type control mechanisms for multi-stage manufacturing," International Journal of Production Economics, Elsevier, vol. 68(1), pages 59-71, October.
    13. Dong, Ming & Frank Chen, F., 2005. "Performance modeling and analysis of integrated logistic chains: An analytic framework," European Journal of Operational Research, Elsevier, vol. 162(1), pages 83-98, April.
    14. Subba Rao, S. & Gunasekaran, A. & Goyal, S. K. & Martikainen, T., 1998. "Waiting line model applications in manufacturing," International Journal of Production Economics, Elsevier, vol. 54(1), pages 1-28, January.
    15. Kimms, Alf & Drexl, Andreas, 1996. "Multi-level lot sizing: A literature survey," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 405, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    16. S. David Wu & Eui-Seok Byeon & Robert H. Storer, 1999. "A Graph-Theoretic Decomposition of the Job Shop Scheduling Problem to Achieve Scheduling Robustness," Operations Research, INFORMS, vol. 47(1), pages 113-124, February.
    17. Diks, E. B. & de Kok, A. G. & Lagodimos, A. G., 1996. "Multi-echelon systems: A service measure perspective," European Journal of Operational Research, Elsevier, vol. 95(2), pages 241-263, December.
    18. Lage Junior, Muris & Godinho Filho, Moacir, 2010. "Variations of the kanban system: Literature review and classification," International Journal of Production Economics, Elsevier, vol. 125(1), pages 13-21, May.
    19. de Kok, Ton & Grob, Christopher & Laumanns, Marco & Minner, Stefan & Rambau, Jörg & Schade, Konrad, 2018. "A typology and literature review on stochastic multi-echelon inventory models," European Journal of Operational Research, Elsevier, vol. 269(3), pages 955-983.
    20. Benton, W. C. & Shin, Hojung, 1998. "Manufacturing planning and control: The evolution of MRP and JIT integration," European Journal of Operational Research, Elsevier, vol. 110(3), pages 411-440, November.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:113:y:1999:i:3:p:560-567. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.