A performance comparison of pull type control mechanisms for multi-stage manufacturing
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Buzacott, J. A., 1989. "Queueing models of Kanban and MRP controlled production systems," Engineering Costs and Production Economics, Elsevier, vol. 17(1-4), pages 3-20, August.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Matta, Andrea & Dallery, Yves & Di Mascolo, Maria, 2005. "Analysis of assembly systems controlled with kanbans," European Journal of Operational Research, Elsevier, vol. 166(2), pages 310-336, October.
- Ohno, Katsuhisa, 2011. "The optimal control of just-in-time-based production and distribution systems and performance comparisons with optimized pull systems," European Journal of Operational Research, Elsevier, vol. 213(1), pages 124-133, August.
- Lage Junior, Muris & Godinho Filho, Moacir, 2010. "Variations of the kanban system: Literature review and classification," International Journal of Production Economics, Elsevier, vol. 125(1), pages 13-21, May.
- Colledani, Marcello & Tolio, Tullio, 2009. "Performance evaluation of production systems monitored by statistical process control and off-line inspections," International Journal of Production Economics, Elsevier, vol. 120(2), pages 348-367, August.
- Liberopoulos, George & Koukoumialos, Stelios, 2005. "Tradeoffs between base stock levels, numbers of kanbans, and planned supply lead times in production/inventory systems with advance demand information," International Journal of Production Economics, Elsevier, vol. 96(2), pages 213-232, May.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Tardif, Valerie & Maaseidvaag, Lars, 2001. "An adaptive approach to controlling kanban systems," European Journal of Operational Research, Elsevier, vol. 132(2), pages 411-424, July.
- Wilhelm, W. E. & Som, Pradip, 1998. "Analysis of a single-stage, single-product, stochastic, MRP-controlled assembly system," European Journal of Operational Research, Elsevier, vol. 108(1), pages 74-93, July.
- Kim, Ilhyung & Tang, Christopher S., 1997. "Lead time and response time in a pull production control system," European Journal of Operational Research, Elsevier, vol. 101(3), pages 474-485, September.
- Jacobs, F. Robert & Bendoly, Elliot, 2003. "Enterprise resource planning: Developments and directions for operations management research," European Journal of Operational Research, Elsevier, vol. 146(2), pages 233-240, April.
- Wallace J. Hopp & Mark L. Spearman, 2004. "To Pull or Not to Pull: What Is the Question?," Manufacturing & Service Operations Management, INFORMS, vol. 6(2), pages 133-148, August.
- Driessen, M.A. & van Houtum, G.J. & Zijm, W.H.M. & Rustenburg, W.D., 2020. "Capacity assignment in repair shops with high material uncertainty," International Journal of Production Economics, Elsevier, vol. 221(C).
- Liberopoulos, George & Koukoumialos, Stelios, 2005. "Tradeoffs between base stock levels, numbers of kanbans, and planned supply lead times in production/inventory systems with advance demand information," International Journal of Production Economics, Elsevier, vol. 96(2), pages 213-232, May.
- Gaury, E.G.A. & Kleijnen, J.P.C. & Pierreval, H., 1998.
"Customized Pull Systems for Single-Product Flow Lines,"
Discussion Paper
1998-117, Tilburg University, Center for Economic Research.
- Gaury, E.G.A. & Kleijnen, J.P.C. & Pierreval, H., 1998. "Customized Pull Systems for Single-Product Flow Lines," Other publications TiSEM ac7da569-7495-4fc4-a4e1-0, Tilburg University, School of Economics and Management.
- Lage Junior, Muris & Godinho Filho, Moacir, 2010. "Variations of the kanban system: Literature review and classification," International Journal of Production Economics, Elsevier, vol. 125(1), pages 13-21, May.
- Axsater, Sven & Rosling, Kaj, 1999. "Ranking of generalised multi-stage KANBAN policies," European Journal of Operational Research, Elsevier, vol. 113(3), pages 560-567, March.
- Benton, W. C. & Shin, Hojung, 1998. "Manufacturing planning and control: The evolution of MRP and JIT integration," European Journal of Operational Research, Elsevier, vol. 110(3), pages 411-440, November.
- Plaza, Malgorzata & David, Iulian & Shirazi, Farid, 2018. "Management of inventory under market fluctuations the case of a Canadian high tech company," International Journal of Production Economics, Elsevier, vol. 205(C), pages 215-227.
- Dong, Ming & Frank Chen, F., 2005. "Performance modeling and analysis of integrated logistic chains: An analytic framework," European Journal of Operational Research, Elsevier, vol. 162(1), pages 83-98, April.
- Subba Rao, S. & Gunasekaran, A. & Goyal, S. K. & Martikainen, T., 1998. "Waiting line model applications in manufacturing," International Journal of Production Economics, Elsevier, vol. 54(1), pages 1-28, January.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:68:y:2000:i:1:p:59-71. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.