On stochastic machine scheduling with general distributional assumptions
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Kevin D. Glazebrook, 1987. "Evaluating the effects of machine breakdowns in stochastic scheduling problems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 34(3), pages 319-335, June.
- Allahverdi, Ali & Mittenthal, John, 1995. "Scheduling on a two-machine flowshop subject to random breakdowns with a makespan objective function," European Journal of Operational Research, Elsevier, vol. 81(2), pages 376-387, March.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Faicel Hnaien & Taha Arbaoui, 2023. "Minimizing the makespan for the two-machine flow shop scheduling problem with random breakdown," Annals of Operations Research, Springer, vol. 328(2), pages 1437-1460, September.
- Allahverdi, Ali, 1999. "Stochastically minimizing total flowtime in flowshops with no waiting space," European Journal of Operational Research, Elsevier, vol. 113(1), pages 101-112, February.
- Charles Du & Michael Pinedo, 1995. "A note on minimizing the expected makespan in flowshops subject to breakdowns," Naval Research Logistics (NRL), John Wiley & Sons, vol. 42(8), pages 1251-1262, December.
- Jian Yang & Gang Yu, 2002. "On the Robust Single Machine Scheduling Problem," Journal of Combinatorial Optimization, Springer, vol. 6(1), pages 17-33, March.
- Portougal, Victor & Trietsch, Dan, 2006. "Johnson's problem with stochastic processing times and optimal service level," European Journal of Operational Research, Elsevier, vol. 169(3), pages 751-760, March.
- J. Birge & J. B. G. Frenk & J. Mittenthal & A. H. G. Rinnooy Kan, 1990. "Single‐machine scheduling subject to stochastic breakdowns," Naval Research Logistics (NRL), John Wiley & Sons, vol. 37(5), pages 661-677, October.
- Yarlin Kuo & Zi‐Ann Chang, 2007. "Integrated production scheduling and preventive maintenance planning for a single machine under a cumulative damage failure process," Naval Research Logistics (NRL), John Wiley & Sons, vol. 54(6), pages 602-614, September.
- S. E. Pilnick & K. D. Glazebrook & D. P. Gaver, 1991. "Optimal sequential replenishment of ships during combat," Naval Research Logistics (NRL), John Wiley & Sons, vol. 38(5), pages 637-668, October.
- Rhonda Righter, 1997. "A generalized Johnson's rule for stochastic assembly systems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 44(2), pages 211-220, March.
- Sid Browne & Kevin D. Glazebrook, 1996. "Scheduling jobs that are subject to failure propagation," Naval Research Logistics (NRL), John Wiley & Sons, vol. 43(2), pages 265-288, March.
- Vacharapoom Benjaoran & Nashwan Dawood & Brian Hobbs, 2005. "Flowshop scheduling model for bespoke precast concrete production planning," Construction Management and Economics, Taylor & Francis Journals, vol. 23(1), pages 93-105.
- Sam Ransbotham & Ishwar Murthy & Sabyasachi Mitra & Sridhar Narasimhan, 2011. "Sequential Grid Computing: Models and Computational Experiments," INFORMS Journal on Computing, INFORMS, vol. 23(2), pages 174-188, May.
- K. D. Glazebrook, 1992. "Single‐machine scheduling of stochastic jobs subject to deterioration or delay," Naval Research Logistics (NRL), John Wiley & Sons, vol. 39(5), pages 613-633, August.
- Lee, Chung-Yee & Lin, Chen-Sin, 2001. "Single-machine scheduling with maintenance and repair rate-modifying activities," European Journal of Operational Research, Elsevier, vol. 135(3), pages 493-513, December.
- François Clautiaux & Boris Detienne & Henri Lefebvre, 2023. "A two-stage robust approach for minimizing the weighted number of tardy jobs with objective uncertainty," Journal of Scheduling, Springer, vol. 26(2), pages 169-191, April.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:105:y:1998:i:3:p:525-536. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.