Optimal sequential replenishment of ships during combat
Author
Abstract
Suggested Citation
DOI: 10.1002/1520-6750(199110)38:53.0.CO;2-B
Download full text from publisher
References listed on IDEAS
- Kevin D. Glazebrook, 1987. "Evaluating the effects of machine breakdowns in stochastic scheduling problems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 34(3), pages 319-335, June.
- K. D. Glazebrook, 1987. "Sensitivity Analysis for Stochastic Scheduling Problems," Mathematics of Operations Research, INFORMS, vol. 12(2), pages 205-223, May.
- K. D. Glazebrook, 1984. "Scheduling stochastic jobs on a single machine subject to breakdowns," Naval Research Logistics Quarterly, John Wiley & Sons, vol. 31(2), pages 251-264, June.
- K. D. Glazebrook & N. A. Fay, 1990. "Evaluating Strategies for Markov Decision Processes in Parallel," Mathematics of Operations Research, INFORMS, vol. 15(1), pages 17-32, February.
- K. D. Glazebrook & J. C. Gittins, 1981. "On Single-Machine Scheduling with Precedence Relations and Linear or Discounted Costs," Operations Research, INFORMS, vol. 29(1), pages 161-173, February.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Mofidi, Seyed Shahab & Pazour, Jennifer A. & Roy, Debjit, 2018. "Proactive vs. reactive order-fulfillment resource allocation for sea-based logistics," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 114(C), pages 66-84.
- Timothy C. Barkdoll & Donald P. Gaver & Kevin D. Glazebrook & Patricia A. Jacobs & Sergio Posadas, 2002. "Suppression of enemy air defenses (SEAD) as an information duel," Naval Research Logistics (NRL), John Wiley & Sons, vol. 49(8), pages 723-742, December.
- K. D. Glazebrook & C. Kirkbride & H. M. Mitchell & D. P. Gaver & P. A. Jacobs, 2007. "Index Policies for Shooting Problems," Operations Research, INFORMS, vol. 55(4), pages 769-781, August.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- K. D. Glazebrook, 1992. "Single‐machine scheduling of stochastic jobs subject to deterioration or delay," Naval Research Logistics (NRL), John Wiley & Sons, vol. 39(5), pages 613-633, August.
- J. Birge & J. B. G. Frenk & J. Mittenthal & A. H. G. Rinnooy Kan, 1990. "Single‐machine scheduling subject to stochastic breakdowns," Naval Research Logistics (NRL), John Wiley & Sons, vol. 37(5), pages 661-677, October.
- Yarlin Kuo & Zi‐Ann Chang, 2007. "Integrated production scheduling and preventive maintenance planning for a single machine under a cumulative damage failure process," Naval Research Logistics (NRL), John Wiley & Sons, vol. 54(6), pages 602-614, September.
- Sid Browne & Kevin D. Glazebrook, 1996. "Scheduling jobs that are subject to failure propagation," Naval Research Logistics (NRL), John Wiley & Sons, vol. 43(2), pages 265-288, March.
- Kevin D. Glazebrook, 1987. "Evaluating the effects of machine breakdowns in stochastic scheduling problems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 34(3), pages 319-335, June.
- Bertsimas, Dimitris., 1995. "The achievable region method in the optimal control of queueing systems : formulations, bounds and policies," Working papers 3837-95., Massachusetts Institute of Technology (MIT), Sloan School of Management.
- Zhenpeng Li & Congdian Cheng, 2023. "The Expected Competitive Ratio on a Kind of Stochastic-Online Flowtime Scheduling with Machine Subject to an Uncertain Breakdown," Mathematics, MDPI, vol. 11(11), pages 1-12, May.
- Li, Wei & Glazebrook, Kevin D., 1998. "On stochastic machine scheduling with general distributional assumptions," European Journal of Operational Research, Elsevier, vol. 105(3), pages 525-536, March.
- Charles Du & Michael Pinedo, 1995. "A note on minimizing the expected makespan in flowshops subject to breakdowns," Naval Research Logistics (NRL), John Wiley & Sons, vol. 42(8), pages 1251-1262, December.
- Dinesh Kumar, U. & Saranga, Haritha, 2010. "Optimal selection of obsolescence mitigation strategies using a restless bandit model," European Journal of Operational Research, Elsevier, vol. 200(1), pages 170-180, January.
- K. D. Glazebrook, 1995. "A suboptimality bound for permutation policies in single machine stochastic scheduling," Naval Research Logistics (NRL), John Wiley & Sons, vol. 42(6), pages 993-1005, September.
- Kevin Glazebrook & Alan Washburn, 2004. "Shoot-Look-Shoot: A Review and Extension," Operations Research, INFORMS, vol. 52(3), pages 454-463, June.
- Lee, Chung-Yee & Lin, Chen-Sin, 2001. "Single-machine scheduling with maintenance and repair rate-modifying activities," European Journal of Operational Research, Elsevier, vol. 135(3), pages 493-513, December.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:wly:navres:v:38:y:1991:i:5:p:637-668. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Wiley Content Delivery (email available below). General contact details of provider: https://doi.org/10.1002/(ISSN)1520-6750 .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.