A generalized Johnson's rule for stochastic assembly systems

Author

Listed:
  • Rhonda Righter

Abstract

Johnson's rule gives the optimal order to schedule a set of jobs through a two‐machine flow shop with deterministic processing times. We extend Johnson's rule to fork‐join systems with random processing times. Most of the system may be an arbitrary network. We give conditions under which Johnson's rule is optimal in the stochastic sense, in the increasing convex sense, and in expected value. © 1997 John Wiley & Sons, Inc. Naval Research Logistics 44: 211–220, 1997

Suggested Citation

  • Rhonda Righter, 1997. "A generalized Johnson's rule for stochastic assembly systems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 44(2), pages 211-220, March.
  • Handle: RePEc:wly:navres:v:44:y:1997:i:2:p:211-220
    DOI: 10.1002/(SICI)1520-6750(199703)44:23.0.CO;2-C
    as

    Download full text from publisher

    File URL: https://doi.org/10.1002/(SICI)1520-6750(199703)44:23.0.CO;2-C
    Download Restriction: no

    File URL: https://libkey.io/10.1002/(SICI)1520-6750(199703)44:23.0.CO;2-C?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    References listed on IDEAS

    as
    1. James R. Jackson, 1956. "An extension of Johnson's results on job IDT scheduling," Naval Research Logistics Quarterly, John Wiley & Sons, vol. 3(3), pages 201-203, September.
    2. Allahverdi, Ali & Mittenthal, John, 1995. "Scheduling on a two-machine flowshop subject to random breakdowns with a makespan objective function," European Journal of Operational Research, Elsevier, vol. 81(2), pages 376-387, March.
    3. S. M. Johnson, 1954. "Optimal two‐ and three‐stage production schedules with setup times included," Naval Research Logistics Quarterly, John Wiley & Sons, vol. 1(1), pages 61-68, March.
    4. Andrew A. Cunningham & Sujit K. Dutta, 1973. "Scheduling jobs, with exponentially distributed processing times, on two machines of a flow shop," Naval Research Logistics Quarterly, John Wiley & Sons, vol. 20(1), pages 69-81, March.
    5. Michael Pinedo, 1981. "A note on the two machine job shop with exponential processing times," Naval Research Logistics Quarterly, John Wiley & Sons, vol. 28(4), pages 693-696, December.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Sterna, Małgorzata, 2021. "Late and early work scheduling: A survey," Omega, Elsevier, vol. 104(C).
    2. Gabriel Mauricio Zambrano-Rey & Eliana María González-Neira & Gabriel Fernando Forero-Ortiz & María José Ocampo-Monsalve & Andrea Rivera-Torres, 2024. "Minimizing the expected maximum lateness for a job shop subject to stochastic machine breakdowns," Annals of Operations Research, Springer, vol. 338(1), pages 801-833, July.
    3. S.S. Panwalkar & Christos Koulamas, 2015. "Scheduling research and the first decade of NRLQ: A historical perspective," Naval Research Logistics (NRL), John Wiley & Sons, vol. 62(4), pages 335-344, June.
    4. Liqi Zhang & Lingfa Lu & Shisheng Li, 2016. "New results on two-machine flow-shop scheduling with rejection," Journal of Combinatorial Optimization, Springer, vol. 31(4), pages 1493-1504, May.
    5. Faicel Hnaien & Taha Arbaoui, 2023. "Minimizing the makespan for the two-machine flow shop scheduling problem with random breakdown," Annals of Operations Research, Springer, vol. 328(2), pages 1437-1460, September.
    6. Vincent T’kindt & Federico Della Croce & Mathieu Liedloff, 2022. "Moderate exponential-time algorithms for scheduling problems," 4OR, Springer, vol. 20(4), pages 533-566, December.
    7. Golpîra, Hêriş, 2020. "Smart Energy-Aware Manufacturing Plant Scheduling under Uncertainty: A Risk-Based Multi-Objective Robust Optimization Approach," Energy, Elsevier, vol. 209(C).
    8. Alexander Grigoriev & Martijn Holthuijsen & Joris van de Klundert, 2005. "Basic scheduling problems with raw material constraints," Naval Research Logistics (NRL), John Wiley & Sons, vol. 52(6), pages 527-535, September.
    9. A. G. Leeftink & R. J. Boucherie & E. W. Hans & M. A. M. Verdaasdonk & I. M. H. Vliegen & P. J. Diest, 2018. "Batch scheduling in the histopathology laboratory," Flexible Services and Manufacturing Journal, Springer, vol. 30(1), pages 171-197, June.
    10. Yadong Wang & Baoqiang Fan & Jingang Zhai & Wei Xiong, 2019. "Two-machine flowshop scheduling in a physical examination center," Journal of Combinatorial Optimization, Springer, vol. 37(1), pages 363-374, January.
    11. Miri Gilenson & Dvir Shabtay & Liron Yedidsion & Rohit Malshe, 2021. "Scheduling in multi-scenario environment with an agreeable condition on job processing times," Annals of Operations Research, Springer, vol. 307(1), pages 153-173, December.
    12. Peng-Yeng Yin & Hsin-Min Chen & Yi-Lung Cheng & Ying-Chieh Wei & Ya-Lin Huang & Rong-Fuh Day, 2021. "Minimizing the Makespan in Flowshop Scheduling for Sustainable Rubber Circular Manufacturing," Sustainability, MDPI, vol. 13(5), pages 1-18, February.
    13. Monaci, Marta & Agasucci, Valerio & Grani, Giorgio, 2024. "An actor-critic algorithm with policy gradients to solve the job shop scheduling problem using deep double recurrent agents," European Journal of Operational Research, Elsevier, vol. 312(3), pages 910-926.
    14. Li, Wei & Glazebrook, Kevin D., 1998. "On stochastic machine scheduling with general distributional assumptions," European Journal of Operational Research, Elsevier, vol. 105(3), pages 525-536, March.
    15. Asoo J. Vakharia & Yih‐Long Chang, 1990. "A simulated annealing approach to scheduling a manufacturing cell," Naval Research Logistics (NRL), John Wiley & Sons, vol. 37(4), pages 559-577, August.
    16. Allahverdi, Ali, 1999. "Stochastically minimizing total flowtime in flowshops with no waiting space," European Journal of Operational Research, Elsevier, vol. 113(1), pages 101-112, February.
    17. Yu, Tae-Sun & Han, Jun-Hee, 2021. "Scheduling proportionate flow shops with preventive machine maintenance," International Journal of Production Economics, Elsevier, vol. 231(C).
    18. Alfaro-Fernández, Pedro & Ruiz, Rubén & Pagnozzi, Federico & Stützle, Thomas, 2020. "Automatic Algorithm Design for Hybrid Flowshop Scheduling Problems," European Journal of Operational Research, Elsevier, vol. 282(3), pages 835-845.
    19. Vincent T’kindt & Karima Bouibede-Hocine & Carl Esswein, 2007. "Counting and enumeration complexity with application to multicriteria scheduling," Annals of Operations Research, Springer, vol. 153(1), pages 215-234, September.
    20. C.T. Ng & Mikhail Y. Kovalyov, 2004. "An FPTAS for scheduling a two‐machine flowshop with one unavailability interval," Naval Research Logistics (NRL), John Wiley & Sons, vol. 51(3), pages 307-315, April.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:wly:navres:v:44:y:1997:i:2:p:211-220. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Wiley Content Delivery (email available below). General contact details of provider: https://doi.org/10.1002/(ISSN)1520-6750 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.