Distribution requirements and compactness constraints in school timetabling

Author

Listed:
  • Drexl, Andreas
  • Salewski, Frank

Abstract

No abstract is available for this item.

Suggested Citation

  • Drexl, Andreas & Salewski, Frank, 1997. "Distribution requirements and compactness constraints in school timetabling," European Journal of Operational Research, Elsevier, vol. 102(1), pages 193-214, October.
  • Handle: RePEc:eee:ejores:v:102:y:1997:i:1:p:193-214
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(96)00209-3
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Böttcher, Jan & Drexl, Andreas & Kolisch, Rainer & Salewski, Frank, 1996. "Project scheduling under partially renewable resource constraints," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 398, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    2. de Werra, D., 1985. "An introduction to timetabling," European Journal of Operational Research, Elsevier, vol. 19(2), pages 151-162, February.
    3. Fred Glover, 1989. "Tabu Search---Part I," INFORMS Journal on Computing, INFORMS, vol. 1(3), pages 190-206, August.
    4. de Gans, Onno B., 1981. "A computer timetabling system for secondary schools in the Netherlands," European Journal of Operational Research, Elsevier, vol. 7(2), pages 175-182, June.
    5. John J. Dinkel & John Mote & M. A. Venkataramanan, 1989. "OR Practice—An Efficient Decision Support System for Academic Course Scheduling," Operations Research, INFORMS, vol. 37(6), pages 853-864, December.
    6. Kang, Le & White, George M., 1992. "A logic approach to the resolution of constraints in timetabling," European Journal of Operational Research, Elsevier, vol. 61(3), pages 306-317, September.
    7. Costa, Daniel, 1994. "A tabu search algorithm for computing an operational timetable," European Journal of Operational Research, Elsevier, vol. 76(1), pages 98-110, July.
    8. D. Abramson, 1991. "Constructing School Timetables Using Simulated Annealing: Sequential and Parallel Algorithms," Management Science, INFORMS, vol. 37(1), pages 98-113, January.
    9. Manuel Laguna & Thomas A. Feo & Hal C. Elrod, 1994. "A Greedy Randomized Adaptive Search Procedure for the Two-Partition Problem," Operations Research, INFORMS, vol. 42(4), pages 677-687, August.
    10. Cangalovic, Mirjana & Schreuder, Jan A. M., 1991. "Exact colouring algorithm for weighted graphs applied to timetabling problems with lectures of different lengths," European Journal of Operational Research, Elsevier, vol. 51(2), pages 248-258, March.
    11. Junginger, Werner, 1993. "On representatives of multi-index transportation problems," European Journal of Operational Research, Elsevier, vol. 66(3), pages 353-371, May.
    12. Rainer Kolisch & Arno Sprecher & Andreas Drexl, 1995. "Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems," Management Science, INFORMS, vol. 41(10), pages 1693-1703, October.
    13. Salewski, Frank & Bartsch, Thomas, 1994. "A comparison of genetic and greedy randomized algorithms for medium-to-short-term audit-staff scheduling," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 356, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    14. Kolisch, Rainer, 1996. "Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation," European Journal of Operational Research, Elsevier, vol. 90(2), pages 320-333, April.
    15. Cattrysse, Dirk G. & Van Wassenhove, Luk N., 1992. "A survey of algorithms for the generalized assignment problem," European Journal of Operational Research, Elsevier, vol. 60(3), pages 260-272, August.
    16. Chahal, N. & de Werra, D., 1989. "An interactive system for constructing timetables on a PC," European Journal of Operational Research, Elsevier, vol. 40(1), pages 32-37, May.
    17. Mulvey, John M., 1982. "A classroom/time assignment model," European Journal of Operational Research, Elsevier, vol. 9(1), pages 64-70, January.
    18. Werner Junginger, 1986. "Timetabling in Germany---A Survey," Interfaces, INFORMS, vol. 16(4), pages 66-74, August.
    19. Andreas Drexl, 1991. "Scheduling of Project Networks by Job Assignment," Management Science, INFORMS, vol. 37(12), pages 1590-1602, December.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Kai Watermeyer & Jürgen Zimmermann, 2020. "A branch-and-bound procedure for the resource-constrained project scheduling problem with partially renewable resources and general temporal constraints," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 42(2), pages 427-460, June.
    2. Dorneles, Árton P. & de Araújo, Olinto C.B. & Buriol, Luciana S., 2017. "A column generation approach to high school timetabling modeled as a multicommodity flow problem," European Journal of Operational Research, Elsevier, vol. 256(3), pages 685-695.
    3. Michael Marte, 2007. "Towards constraint-based school timetabling," Annals of Operations Research, Springer, vol. 155(1), pages 207-225, November.
    4. Hartmann, Sönke, 1999. "Packing problems and project scheduling models: An integrated perspective," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 509, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    5. Clarence H. Martin, 2004. "Ohio University's College of Business Uses Integer Programming to Schedule Classes," Interfaces, INFORMS, vol. 34(6), pages 460-465, December.
    6. Pongcharoen, P. & Promtet, W. & Yenradee, P. & Hicks, C., 2008. "Stochastic Optimisation Timetabling Tool for university course scheduling," International Journal of Production Economics, Elsevier, vol. 112(2), pages 903-918, April.
    7. Mareike Karnebogen & Jürgen Zimmermann, 2024. "Generation schemes for the resource-constrained project scheduling problem with partially renewable resources and generalized precedence constraints," Annals of Operations Research, Springer, vol. 338(1), pages 173-192, July.
    8. Hartmann, Sönke & Briskorn, Dirk, 2008. "A survey of variants and extensions of the resource-constrained project scheduling problem," Working Paper Series 02/2008, Hamburg School of Business Administration (HSBA).
    9. Drexl, Andreas & Nissen, Rudiger & Patterson, James H. & Salewski, Frank, 2000. "ProGen/[pi]x - An instance generator for resource-constrained project scheduling problems with partially renewable resources and further extensions," European Journal of Operational Research, Elsevier, vol. 125(1), pages 59-72, August.
    10. Haroldo Santos & Eduardo Uchoa & Luiz Ochi & Nelson Maculan, 2012. "Strong bounds with cut and column generation for class-teacher timetabling," Annals of Operations Research, Springer, vol. 194(1), pages 399-412, April.
    11. Hartmann, Sönke & Briskorn, Dirk, 2010. "A survey of variants and extensions of the resource-constrained project scheduling problem," European Journal of Operational Research, Elsevier, vol. 207(1), pages 1-14, November.
    12. Nelishia Pillay, 2014. "A survey of school timetabling research," Annals of Operations Research, Springer, vol. 218(1), pages 261-293, July.
    13. Daskalaki, S. & Birbas, T. & Housos, E., 2004. "An integer programming formulation for a case study in university timetabling," European Journal of Operational Research, Elsevier, vol. 153(1), pages 117-135, February.
    14. Kai Watermeyer & Jürgen Zimmermann, 2022. "A partition-based branch-and-bound algorithm for the project duration problem with partially renewable resources and general temporal constraints," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 44(2), pages 575-602, June.
    15. Daskalaki, S. & Birbas, T., 2005. "Efficient solutions for a university timetabling problem through integer programming," European Journal of Operational Research, Elsevier, vol. 160(1), pages 106-120, January.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Schirmer, Andreas & Potzhar, Kathrin, 2001. "Professional course scheduling in airline transport pilot training: A case from Lufthansa flight training," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 539, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    2. Drexl, Andreas & Juretzka, Jan & Salewski, Frank, 1993. "Academic course scheduling under workload and changeover constraints," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 337, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    3. Dimopoulou, M. & Miliotis, P., 2001. "Implementation of a university course and examination timetabling system," European Journal of Operational Research, Elsevier, vol. 130(1), pages 202-213, April.
    4. Drexl, Andreas & Salewski, Frank, 1996. "Distribution Requirements and Compactness Constraints in School Timetabling. Part II: Methods," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 384, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    5. Schirmer, Andreas & Potzahr, Kathrin, 2001. "Lehrgangsplanung für die Ausbildung von Verkehrsflugzeugführern: Ergebnisse einer Studie bei Lufthansa Flight Training," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 538, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    6. Hertz, Alain & Robert, Vincent, 1998. "Constructing a course schedule by solving a series of assignment type problems," European Journal of Operational Research, Elsevier, vol. 108(3), pages 585-603, August.
    7. Haase, Knut & Latteier, Jorg & Schirmer, Andreas, 1998. "The course scheduling problem at Lufthansa Technical Training," European Journal of Operational Research, Elsevier, vol. 110(3), pages 441-456, November.
    8. Haase, Knut & Latteier, Jörg & Schirmer, Andreas, 1997. "The course scheduling problem at Lufthansa Technical Training," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 441, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    9. Haase, Knut & Latteier, Jörg & Schirmer, Andreas, 1997. "Course planning at Lufthansa technical training: Constructing more profitable schedules," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 442, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    10. Schirmer, Andreas & Riesenberg, Sven, 1998. "Class-based control schemes for parameterized project scheduling heuristics," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 471, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    11. Cangalovic, Mirjana & Kovacevic-Vujcic, Vera & Ivanovic, Lav & Drazic, Milan, 1998. "Modeling and solving a real-life assignment problem at universities," European Journal of Operational Research, Elsevier, vol. 110(2), pages 223-233, October.
    12. Daskalaki, S. & Birbas, T., 2005. "Efficient solutions for a university timetabling problem through integer programming," European Journal of Operational Research, Elsevier, vol. 160(1), pages 106-120, January.
    13. Böttcher, Jan & Drexl, Andreas & Kolisch, Rainer & Salewski, Frank, 1996. "Project scheduling under partially renewable resource constraints," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 398, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    14. Schirmer, Andreas, 1998. "Case-based reasoning and improved adaptive search for project scheduling," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 472, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    15. Kolisch, R. & Padman, R., 2001. "An integrated survey of deterministic project scheduling," Omega, Elsevier, vol. 29(3), pages 249-272, June.
    16. Schirmer, Andreas & Riesenberg, Sven, 1997. "Parameterized heuristics for project scheduling: Biased random sampling methods," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 456, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    17. Knut Haase & Jörg Latteier & Andreas Schirmer, 1999. "Course Planning at Lufthansa Technical Training: Constructing More Profitable Schedules," Interfaces, INFORMS, vol. 29(5), pages 95-109, October.
    18. R. Alvarez-Valdes & G. Martin & J. Tamarit, 1995. "Hores: A timetabling system for Spanish secondary schools," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 3(1), pages 137-144, June.
    19. Salewski, Frank & Schirmer, Andreas & Drexl, Andreas, 1997. "Project scheduling under resource and mode identity constraints: Model, complexity, methods, and application," European Journal of Operational Research, Elsevier, vol. 102(1), pages 88-110, October.
    20. Andreas Schirmer, 2000. "Case‐based reasoning and improved adaptive search for project scheduling," Naval Research Logistics (NRL), John Wiley & Sons, vol. 47(3), pages 201-222, April.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:102:y:1997:i:1:p:193-214. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.