Dynamic expansion planning of a commercial virtual power plant through coalition with distributed energy resources considering rival competitors

Author

Listed:
  • Maiz, Santiago
  • Baringo, Luis
  • García-Bertrand, Raquel

Abstract

We consider a virtual power plant (VPP) that expands its capacity by forming a coalition with decentralized energy resources (DERs) such as controllable and renewable power plants, as well as with energy storage systems and flexible demands. The VPP competes with rival VPPs to aggregate the DERs to its own portfolio. This problem is formulated as a three-stage stochastic bi-level model, where the expected profit of the VPP is maximized in the upper-level problem, while the lower-level problems deal with the decisions of each DER regarding the selection of VPP. In the first stage, the VPP manager places bids to secure each DER auction. The second stage involves decisions to determine the DER auctions, forming the VPP coalition and the procurement of power from the day-ahead market. Uncertainties in this stage include bid prices of rival VPPs and the minimum selling price of DERs. Finally, in the third stage, the expanded VPP determines its optimal operation and manages uncertainties related to renewable energy production levels and market prices. The conditional value-at-risk (CVaR) is incorporated into the model as a risk metric to deal with the profit risk associated with the decisions of the VPP manager. The duration of the coalition forming is mid-term, spanning one month. To reduce the computational burden of the problem, the variability of parameters such as market prices and renewable energy production levels (both solar and wind) is modeled using representative days generated by a clustering K-medoids method. Through a case study using data from the Spanish electricity market, it is demonstrated that weather conditions and electricity demand significantly influence the coalition formation.

Suggested Citation

  • Maiz, Santiago & Baringo, Luis & García-Bertrand, Raquel, 2025. "Dynamic expansion planning of a commercial virtual power plant through coalition with distributed energy resources considering rival competitors," Applied Energy, Elsevier, vol. 377(PD).
  • Handle: RePEc:eee:appene:v:377:y:2025:i:pd:s0306261924020488
    DOI: 10.1016/j.apenergy.2024.124665
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0306261924020488
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.apenergy.2024.124665?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:appene:v:377:y:2025:i:pd:s0306261924020488. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/wps/find/journaldescription.cws_home/405891/description#description .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.