Can wholesale electricity markets achieve resource adequacy and high clean energy generation targets in the presence of self-interested actors?
Author
Abstract
Suggested Citation
DOI: 10.1016/j.apenergy.2024.122774
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Levin, Todd & Botterud, Audun, 2015. "Electricity market design for generator revenue sufficiency with increased variable generation," Energy Policy, Elsevier, vol. 87(C), pages 392-406.
- Frew, Bethany & Brinkman, Greg & Denholm, Paul & Narwade, Vinayak & Stephen, Gord & Bloom, Aaron & Lau, Jessica, 2021. "Impact of operating reserve rules on electricity prices with high penetrations of renewable energy," Energy Policy, Elsevier, vol. 156(C).
- Frew, Bethany & Bashar Anwar, Muhammad & Dalvi, Sourabh & Brooks, Adria, 2023. "The interaction of wholesale electricity market structures under futures with decarbonization policy goals: A complexity conundrum," Applied Energy, Elsevier, vol. 339(C).
- Frank A. Wolak, 2022. "Long-Term Resource Adequacy in Wholesale Electricity Markets with Significant Intermittent Renewables," Environmental and Energy Policy and the Economy, University of Chicago Press, vol. 3(1), pages 155-220.
- Maulén, Lucas & Castro, Margarita & Lorca, Álvaro & Negrete-Pincetic, Matías, 2023. "Optimization-based expansion planning for power and hydrogen systems with feedback from a unit commitment model," Applied Energy, Elsevier, vol. 343(C).
- Anwar, Muhammad Bashar & Stephen, Gord & Dalvi, Sourabh & Frew, Bethany & Ericson, Sean & Brown, Maxwell & O’Malley, Mark, 2022. "Modeling investment decisions from heterogeneous firms under imperfect information and risk in wholesale electricity markets," Applied Energy, Elsevier, vol. 306(PA).
- Newbery, David, 2016.
"Missing money and missing markets: Reliability, capacity auctions and interconnectors,"
Energy Policy, Elsevier, vol. 94(C), pages 401-410.
- David Newbery, 2015. "Missing Money and Missing Markets: Reliability, Capacity Auctions and Interconnectors," Cambridge Working Papers in Economics 1513, Faculty of Economics, University of Cambridge.
- David Newbery, 2015. "Missing Money and Missing Markets: Reliability, Capacity Auctions and Interconnectors," Working Papers EPRG 1508, Energy Policy Research Group, Cambridge Judge Business School, University of Cambridge.
- Frazier, A. Will & Cole, Wesley & Denholm, Paul & Greer, Daniel & Gagnon, Pieter, 2020. "Assessing the potential of battery storage as a peaking capacity resource in the United States," Applied Energy, Elsevier, vol. 275(C).
- Lavin, Luke & Murphy, Sinnott & Sergi, Brian & Apt, Jay, 2020. "Dynamic operating reserve procurement improves scarcity pricing in PJM," Energy Policy, Elsevier, vol. 147(C).
- Cole, Wesley & Greer, Daniel & Ho, Jonathan & Margolis, Robert, 2020. "Considerations for maintaining resource adequacy of electricity systems with high penetrations of PV and storage," Applied Energy, Elsevier, vol. 279(C).
- Zappa, William & Junginger, Martin & van den Broek, Machteld, 2019. "Is a 100% renewable European power system feasible by 2050?," Applied Energy, Elsevier, vol. 233, pages 1027-1050.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Frew, Bethany & Bashar Anwar, Muhammad & Dalvi, Sourabh & Brooks, Adria, 2023. "The interaction of wholesale electricity market structures under futures with decarbonization policy goals: A complexity conundrum," Applied Energy, Elsevier, vol. 339(C).
- Lebeau, Alexis & Petitet, Marie & Quemin, Simon & Saguan, Marcelo, 2024. "Long-term issues with the Energy-Only Market design in the context of deep decarbonization," Energy Economics, Elsevier, vol. 132(C).
- Jimenez, I. Sanchez & Ribó-Pérez, D. & Cvetkovic, M. & Kochems, J. & Schimeczek, C. & de Vries, L.J., 2024. "Can an energy only market enable resource adequacy in a decarbonized power system? A co-simulation with two agent-based-models," Applied Energy, Elsevier, vol. 360(C).
- Keppler, Jan Horst & Quemin, Simon & Saguan, Marcelo, 2022.
"Why the sustainable provision of low-carbon electricity needs hybrid markets,"
Energy Policy, Elsevier, vol. 171(C).
- Jan-Horst Keppler & Simon Quemin & Marcelo Saguan, 2022. "Why the sustainable provision of low-carbon electricity needs hybrid markets," Post-Print hal-03964488, HAL.
- Simshauser, Paul, 2024.
"On static vs. dynamic line ratings in renewable energy zones,"
Energy Economics, Elsevier, vol. 129(C).
- Paul Simshauser, 2023. "On static vs. dynamic line ratings in renewable energy zones," Working Papers EPRG2321, Energy Policy Research Group, Cambridge Judge Business School, University of Cambridge.
- Simshauser, P., 2023. "On Static vs. Dynamic Line Ratings in Renewable Energy Zones," Cambridge Working Papers in Economics 2362, Faculty of Economics, University of Cambridge.
- Deakin, Matthew & Bloomfield, Hannah & Greenwood, David & Sheehy, Sarah & Walker, Sara & Taylor, Phil C., 2021. "Impacts of heat decarbonization on system adequacy considering increased meteorological sensitivity," Applied Energy, Elsevier, vol. 298(C).
- Mai, Trieu & Lopez, Anthony & Mowers, Matthew & Lantz, Eric, 2021. "Interactions of wind energy project siting, wind resource potential, and the evolution of the U.S. power system," Energy, Elsevier, vol. 223(C).
- Dranka, Géremi Gilson & Ferreira, Paula & Vaz, A. Ismael F., 2021. "A review of co-optimization approaches for operational and planning problems in the energy sector," Applied Energy, Elsevier, vol. 304(C).
- Shu, Han & Mays, Jacob, 2023. "Beyond capacity: Contractual form in electricity reliability obligations," Energy Economics, Elsevier, vol. 126(C).
- Fang, Xichen & Guo, Hongye & Zheng, Kedi & Liu, Shuangquan & Chen, Qixin, 2024. "Real-time capacity cost obligations design in high-renewables energy markets," Renewable and Sustainable Energy Reviews, Elsevier, vol. 191(C).
- Bajo-Buenestado, Raúl, 2021. "Operating reserve demand curve, scarcity pricing and intermittent generation: Lessons from the Texas ERCOT experience," Energy Policy, Elsevier, vol. 149(C).
- Bublitz, Andreas & Keles, Dogan & Zimmermann, Florian & Fraunholz, Christoph & Fichtner, Wolf, 2018. "A survey on electricity market design: Insights from theory and real-world implementations of capacity remuneration mechanisms," Working Paper Series in Production and Energy 27, Karlsruhe Institute of Technology (KIT), Institute for Industrial Production (IIP).
- Newbery, David M., 2023. "High renewable electricity penetration: Marginal curtailment and market failure under “subsidy-free” entry," Energy Economics, Elsevier, vol. 126(C).
- Zappa, William & Junginger, Martin & van den Broek, Machteld, 2021. "Can liberalised electricity markets support decarbonised portfolios in line with the Paris Agreement? A case study of Central Western Europe," Energy Policy, Elsevier, vol. 149(C).
- Anthony Papavasiliou & Yves Smeers, 2017. "Remuneration of Flexibility using Operating Reserve Demand Curves: A Case Study of Belgium," The Energy Journal, International Association for Energy Economics, vol. 0(Number 6).
- Chi Kong Chyong & Michael Pollitt & Reuben Cruise, 2019.
"Can wholesale electricity prices support "subsidy-free" generation investment in Europe?,"
Working Papers
EPRG1919, Energy Policy Research Group, Cambridge Judge Business School, University of Cambridge.
- Chyong, C. & Pollitt, M. & Cruise, R., 2019. "Can wholesale electricity prices support “subsidy-free” generation investment in Europe?," Cambridge Working Papers in Economics 1955, Faculty of Economics, University of Cambridge.
- Lynch, Muireann Á. & Longoria, Genora & Curtis, John, 2021. "Future market design options for electricity markets with high RES-E: lessons from the Irish Single Electricity Market," Papers WP702, Economic and Social Research Institute (ESRI).
- Dimanchev, Emil & Gabriel, Steven A. & Reichenberg, Lina & Korpås, Magnus, 2024. "Consequences of the missing risk market problem for power system emissions," Energy Economics, Elsevier, vol. 136(C).
- Wierzbowski, Michal & Filipiak, Izabela, 2017. "Enhanced operational reserve as a tool for development of optimal energy mix," Energy Policy, Elsevier, vol. 102(C), pages 602-615.
- Bublitz, Andreas & Keles, Dogan & Zimmermann, Florian & Fraunholz, Christoph & Fichtner, Wolf, 2019. "A survey on electricity market design: Insights from theory and real-world implementations of capacity remuneration mechanisms," Energy Economics, Elsevier, vol. 80(C), pages 1059-1078.
More about this item
Keywords
Competitive wholesale electricity market design; Capacity expansion; Resource adequacy; Capacity market; Operating reserve demand curve;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:appene:v:359:y:2024:i:c:s0306261924001570. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/wps/find/journaldescription.cws_home/405891/description#description .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.