My bibliography
Save this item
Forward Reliability Markets: Less Risk, Less Market Power, More Efficiency
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Meyer, Roland & Gore, Olga, 2015. "Cross-border effects of capacity mechanisms: Do uncoordinated market design changes contradict the goals of the European market integration?," Energy Economics, Elsevier, vol. 51(C), pages 9-20.
- Nagl, Stephan, 2013. "The Effect of Weather Uncertainty on the Financial Risk of Green Electricity Producers under Various Renewable Policies," EWI Working Papers 2013-15, Energiewirtschaftliches Institut an der Universitaet zu Koeln (EWI).
- Nicolosi, S., 2010. "Wind power integration, negative prices and power system flexibility - An empirical analysis of extreme events in Germany," MPRA Paper 31834, University Library of Munich, Germany.
- Newbery, David, 2016.
"Missing money and missing markets: Reliability, capacity auctions and interconnectors,"
Energy Policy, Elsevier, vol. 94(C), pages 401-410.
- David Newbery, 2015. "Missing Money and Missing Markets: Reliability, Capacity Auctions and Interconnectors," Cambridge Working Papers in Economics 1513, Faculty of Economics, University of Cambridge.
- David Newbery, 2015. "Missing Money and Missing Markets: Reliability, Capacity Auctions and Interconnectors," Working Papers EPRG 1508, Energy Policy Research Group, Cambridge Judge Business School, University of Cambridge.
- de Vries, Laurens & Heijnen, Petra, 2008. "The impact of electricity market design upon investment under uncertainty: The effectiveness of capacity mechanisms," Utilities Policy, Elsevier, vol. 16(3), pages 215-227, September.
- Nagl, Stephan, 2013. "Prices vs. Quantities: Incentives for Renewable Power Generation - Numerical Analysis for the European Power Market," EWI Working Papers 2013-4, Energiewirtschaftliches Institut an der Universitaet zu Koeln (EWI).
- Elberg, Christina & Kranz, Sebastian, 2013.
"Capacity Mechanisms and Effects on Market Structure,"
VfS Annual Conference 2013 (Duesseldorf): Competition Policy and Regulation in a Global Economic Order
79811, Verein für Socialpolitik / German Economic Association.
- Elberg, Christina & Kranz, Sebastian, 2014. "Capacity Mechanisms and Effects on Market Structure," EWI Working Papers 2014-4, Energiewirtschaftliches Institut an der Universitaet zu Koeln (EWI).
- Arango, Santiago & Castañeda, Jaime A. & Larsen, Erik R., 2013. "Mothballing in power markets: An experimental study," Energy Economics, Elsevier, vol. 36(C), pages 125-134.
- Cuervo, Felipe Isaza & Botero, Sergio Botero, 2016. "Wind power reliability valuation in a Hydro-Dominated power market: The Colombian case," Renewable and Sustainable Energy Reviews, Elsevier, vol. 57(C), pages 1359-1372.
- Simshauser, Paul, 2022.
"Rooftop solar PV and the peak load problem in the NEM's Queensland region,"
Energy Economics, Elsevier, vol. 109(C).
- Paul Simshauser, 2021. "Rooftop solar PV and the peak load problem in the NEM’s Queensland region," Working Papers EPRG2125, Energy Policy Research Group, Cambridge Judge Business School, University of Cambridge.
- Nicolosi, Marco, 2010. "Wind power integration and power system flexibility-An empirical analysis of extreme events in Germany under the new negative price regime," Energy Policy, Elsevier, vol. 38(11), pages 7257-7268, November.
- Bertsch, Joachim & Growitsch, Christian & Lorenczik, Stefan & Nagl, Stephan, 2016.
"Flexibility in Europe's power sector — An additional requirement or an automatic complement?,"
Energy Economics, Elsevier, vol. 53(C), pages 118-131.
- Bertsch, Joachim & Growitsch, Christian & Lorenczik, Stefan & Nagl, Stephan, 2013. "Flexibility in Europe's Power Sector - an Additional Requirement or an Automatic Complement?," EWI Working Papers 2013-10, Energiewirtschaftliches Institut an der Universitaet zu Koeln (EWI).
- Bertsch, Joachim & Growitsch, Christian & Lorenczik, Stefan & Nagl, Stephan, 2013. "Flexibility in Europe's power sector - an additional requirement or an automatic complement?," VfS Annual Conference 2013 (Duesseldorf): Competition Policy and Regulation in a Global Economic Order 79944, Verein für Socialpolitik / German Economic Association.
- Peter Cramton, 2009.
"Innovation and Market Design,"
NBER Chapters, in: Innovation Policy and the Economy, Volume 9, pages 113-137,
National Bureau of Economic Research, Inc.
- Peter Cramton, 2009. "Innovation and Market Design," Innovation Policy and the Economy, University of Chicago Press, vol. 9(1), pages 113-137.
- Peter Cramton, 2009. "Innovation and Market Design," Papers of Peter Cramton 09imd, University of Maryland, Department of Economics - Peter Cramton, revised 2009.
- David Andrés‐Cerezo & Natalia Fabra, 2023.
"Storing power: market structure matters,"
RAND Journal of Economics, RAND Corporation, vol. 54(1), pages 3-53, March.
- David Andrés-Cerezo & Natalia Fabra, 2020. "Storing Power: Market Structure Matters," Working Papers EPRG2038, Energy Policy Research Group, Cambridge Judge Business School, University of Cambridge.
- Andrés-Cerezo, D. & Fabra, N., 2020. "Storing Power: Market Structure Matters," Cambridge Working Papers in Economics 20122, Faculty of Economics, University of Cambridge.
- Fabra, Natalia & Andrés-Cerezo, David, 2020. "Storing Power: Market Structure Matters," CEPR Discussion Papers 15444, C.E.P.R. Discussion Papers.
- Finon, Dominique & Pignon, Virginie, 2008. "Electricity and long-term capacity adequacy: The quest for regulatory mechanism compatible with electricity market," Utilities Policy, Elsevier, vol. 16(3), pages 143-158, September.
- Jean-Michel Glachant, 2012.
"Regulating Networks in the New Economy,"
Review of Economics and Institutions, Università di Perugia, vol. 3(1).
- Jean-Michel Glachant, 2009. "Regulating Networks in the New Economy," EUI-RSCAS Working Papers 5, European University Institute (EUI), Robert Schuman Centre of Advanced Studies (RSCAS).
- Jean-Michel Glachant, 2009. "Regulating Networks in the New Economy," RSCAS Working Papers 2009/05, European University Institute.
- David Newbery and Michael Grubb, 2015. "Security of Supply, the Role of Interconnectors and Option Values : insights from the GB Capacity Auction," Economics of Energy & Environmental Policy, International Association for Energy Economics, vol. 0(Number 2).
- Rai, Alan & Nunn, Oliver, 2020. "On the impact of increasing penetration of variable renewables on electricity spot price extremes in Australia," Economic Analysis and Policy, Elsevier, vol. 67(C), pages 67-86.
- Green, Richard, 2010. "Are the British electricity trading and transmission arrangements future-proof?," Utilities Policy, Elsevier, vol. 18(4), pages 186-194, December.
- Di Cosmo, Valeria & Lynch, Muireann Á., 2016.
"Competition and the single electricity market: Which lessons for Ireland?,"
Utilities Policy, Elsevier, vol. 41(C), pages 40-47.
- di Cosmo, Valeria & Lynch, Muireann A., 2015. "Competition and the Single Electricity Market: Which Lessons for Ireland," Papers WP497, Economic and Social Research Institute (ESRI).
- Simshauser, Paul, 2020.
"Merchant renewables and the valuation of peaking plant in energy-only markets,"
Energy Economics, Elsevier, vol. 91(C).
- Paul Simshauser, 2020. "Merchant renewables and the valuation of peaking plant in energy-only markets," Working Papers EPRG2002, Energy Policy Research Group, Cambridge Judge Business School, University of Cambridge.
- Simshauser, P., 2020. "Merchant renewables and the valuation of peaking plant in energy-only markets," Cambridge Working Papers in Economics 2002, Faculty of Economics, University of Cambridge.
- Devine, Mel & Lynch, Muireann Á., 2015. "A Menu Approach to Revealing Generator Reliability using a Stochastic Bilevel Mathematical Program," Papers WP518, Economic and Social Research Institute (ESRI).
- Bolton, Gary E. & Ockenfels, Axel, 2012. "Behavioral economic engineering," Journal of Economic Psychology, Elsevier, vol. 33(3), pages 665-676.
- Ray REES & Sebastian SCHOLZ, 2010. "Electricity Market Design for Germany," Sosyoekonomi Journal, Sosyoekonomi Society, issue 2010-EN.
- Arango, Santiago & Larsen, Erik R., 2010. "The environmental paradox in generation: How South America is gradually becoming more dependent on thermal generation," Renewable and Sustainable Energy Reviews, Elsevier, vol. 14(9), pages 2956-2965, December.
- Simshauser, Paul, 2022.
"Rooftop solar PV and the peak load problem in the NEM's Queensland region,"
Energy Economics, Elsevier, vol. 109(C).
- Paul Simshauser, 2021. "Rooftop solar PV and the peak load problem in the NEM’s Queensland region," Working Papers EPRG2125, Energy Policy Research Group, Cambridge Judge Business School, University of Cambridge.
- Simshauser, P., 2021. "Rooftop Solar PV and the Peak Load Problem in the NEM's Queensland Region," Cambridge Working Papers in Economics 2180, Faculty of Economics, University of Cambridge.
- Osorio, A.F. & Ortega, Santiago & Arango-Aramburo, Santiago, 2016. "Assessment of the marine power potential in Colombia," Renewable and Sustainable Energy Reviews, Elsevier, vol. 53(C), pages 966-977.
- Richard Green, 2010. "Energy Regulation in a Low Carbon World," Discussion Papers 10-16, Department of Economics, University of Birmingham.
- Mohsin, Muhammad & Hanif, Imran & Taghizadeh-Hesary, Farhad & Abbas, Qaiser & Iqbal, Wasim, 2021. "Nexus between energy efficiency and electricity reforms: A DEA-Based way forward for clean power development," Energy Policy, Elsevier, vol. 149(C).
- Muireann A. Lynch and Mel T. Devine, 2017. "Investment vs. Refurbishment: Examining Capacity Payment Mechanisms Using Stochastic Mixed Complementarity Problems," The Energy Journal, International Association for Energy Economics, vol. 0(Number 2).
- Peter Cramton & Axel Ockenfels, 2012. "Economics and Design of Capacity Markets for the Power Sector," Papers of Peter Cramton 12cocap, University of Maryland, Department of Economics - Peter Cramton, revised 2012.
- Newbery, David & Pollitt, Michael G. & Ritz, Robert A. & Strielkowski, Wadim, 2018.
"Market design for a high-renewables European electricity system,"
Renewable and Sustainable Energy Reviews, Elsevier, vol. 91(C), pages 695-707.
- Newbery, D. & Pollitt, M. & Ritz, R. & Strielkowski, W., 2017. "Market design for a high-renewables European electricity system," Cambridge Working Papers in Economics 1726, Faculty of Economics, University of Cambridge.
- David Newbery & Michael Pollitt & Robert Ritz & Wadim Strielkowski, 2017. "Market design for a high-renewables European electricity system," Working Papers EPRG 1711, Energy Policy Research Group, Cambridge Judge Business School, University of Cambridge.
- Devine, Mel T. & Lynch, Muireann Á., 2017. "Inducing truthful revelation of generator reliability," Energy Economics, Elsevier, vol. 64(C), pages 186-195.
- Petitet, Marie & Finon, Dominique & Janssen, Tanguy, 2017. "Capacity adequacy in power markets facing energy transition: A comparison of scarcity pricing and capacity mechanism," Energy Policy, Elsevier, vol. 103(C), pages 30-46.
- Pär Holmberg & Thomas Tangerås, 2021.
"Strategic Reserves versus Market-wide Capacity Mechanisms,"
Working Papers
EPRG2109, Energy Policy Research Group, Cambridge Judge Business School, University of Cambridge.
- Holmberg, Pär & Tangerås, Thomas, 2021. "Strategic Reserves versus Market-wide Capacity Mechanisms," Working Paper Series 1387, Research Institute of Industrial Economics.
- Holmberg, P. & Tangerås, T., 2021. "Strategic Reserves versus Market-wide Capacity Mechanisms," Cambridge Working Papers in Economics 2132, Faculty of Economics, University of Cambridge.
- Juha Teirilä & Robert A. Ritz, 2019.
"Strategic Behaviour in a Capacity Market? The New Irish Electricity Market Design,"
The Energy Journal, , vol. 40(1_suppl), pages 105-126, June.
- Juha Teirilä and Robert A. Ritz, 2019. "Strategic Behaviour in a Capacity Market? The New Irish Electricity Market Design," The Energy Journal, International Association for Energy Economics, vol. 0(The New E).
- Teirilä, J. & Ritz, R., 2018. "Strategic behaviour in a capacity market? The new Irish electricity market design," Cambridge Working Papers in Economics 1863, Faculty of Economics, University of Cambridge.
- Juha Teirilä & Robert A. Ritz, 2018. "Strategic behaviour in a capacity market? The new Irish electricity market design," Working Papers EPRG 1833, Energy Policy Research Group, Cambridge Judge Business School, University of Cambridge.
- Curtis, John & Devitt, Niamh & di Cosmo, Valeria & Farrell, Niall & FitzGerald, John & Hyland, Marie & Lynch, Muireann & Lyons, Sean & McCoy, Daire & Malaguzzi Valeri, Laura & Walsh, Darragh, 2014. "Irish Energy Policy: An Analysis of Current Issues," Research Series, Economic and Social Research Institute (ESRI), number rs37 edited by FitzGerald, John & Malaguzzi Valeri, Laura.
- Brown, David P., 2018.
"Capacity payment mechanisms and investment incentives in restructured electricity markets,"
Energy Economics, Elsevier, vol. 74(C), pages 131-142.
- Brown, David, 2014. "Capacity Payment Mechanisms and Investment Incentives in Restructured Electricity Markets," Working Papers 2014-13, University of Alberta, Department of Economics.
- Olsina, Fernando & Pringles, Rolando & Larisson, Carlos & Garcés, Francisco, 2014. "Reliability payments to generation capacity in electricity markets," Energy Policy, Elsevier, vol. 73(C), pages 211-224.
- Natsuko Toba & Tooraj Jamasb & Luiz Maurer & Anupama Sen, 2024.
"Multi-objective Auctions for Utility-Scale Solar Battery Systems: Lessons for ASEAN and East Asia,"
Economics, Law, and Institutions in Asia Pacific, in: Han Phoumin & Rabindra Nepal & Fukunari Kimura & Farhad Taghizadeh-Hesary (ed.), Large-Scale Development of Renewables in the ASEAN, chapter 0, pages 21-53,
Springer.
- Natsuko Toba & Tooraj Jamasb & Luiz Maurer & Anupama Sen, 2023. "Multi-objective auctions for utility-scale solar battery systems: lessons for ASEAN and East Asia," Working Papers EPRG2312, Energy Policy Research Group, Cambridge Judge Business School, University of Cambridge.
- Toba, N. & Jamasb, T. & Maurer, L. & Sen, A., 2023. "Multi-Objective Auctions for Utility-Scale Solar Battery Systems: Lessons for ASEAN and East Asia," Cambridge Working Papers in Economics 2344, Faculty of Economics, University of Cambridge.
- Gregor Zoettl, 2021. "Emission trading systems and the optimal technology mix," SERIEs: Journal of the Spanish Economic Association, Springer;Spanish Economic Association, vol. 12(2), pages 281-327, June.
- Muireann à . Lynch & Mel T. Devine, 2017. "Investment vs. Refurbishment: Examining Capacity Payment Mechanisms Using Stochastic Mixed Complementarity Problems," The Energy Journal, , vol. 38(2), pages 27-52, March.
- Elberg, Christina, 2014. "Cross-Border Effects of Capacity Mechanisms in Electricity Markets," EWI Working Papers 2014-11, Energiewirtschaftliches Institut an der Universitaet zu Koeln (EWI).
- Simshauser, P., 2020.
"Merchant utilities and boundaries of the firm: vertical integration in energy-only markets,"
Cambridge Working Papers in Economics
2039, Faculty of Economics, University of Cambridge.
- Paul Simshauser, 2020. "Merchant utilities and boundaries of the firm: vertical integration in energy-only markets," Working Papers EPRG2008, Energy Policy Research Group, Cambridge Judge Business School, University of Cambridge.
- Rosen, Christiane & Madlener, Reinhard, 2015. "An Option-Based Approach for the Fair Pricing of Flexible Electricity Supply," FCN Working Papers 10/2015, E.ON Energy Research Center, Future Energy Consumer Needs and Behavior (FCN).
- Peter Cramton & Axel Ockenfels & Steven Stoft, 2013. "Capacity Market Fundamentals," Economics of Energy & Environmental Policy, International Association for Energy Economics, vol. 0(Number 2).
- Böckers, Veit & Giessing, Leonie & Rösch, Jürgen, 2013. "The green game changer: An empirical assessment of the effects of wind and solar power on the merit order," DICE Discussion Papers 104, Heinrich Heine University Düsseldorf, Düsseldorf Institute for Competition Economics (DICE).
- Hary, Nicolas & Rious, Vincent & Saguan, Marcelo, 2016. "The electricity generation adequacy problem: Assessing dynamic effects of capacity remuneration mechanisms," Energy Policy, Elsevier, vol. 91(C), pages 113-127.
- Ochoa, Camila & van Ackere, Ann, 2015. "Does size matter? Simulating electricity market coupling between Colombia and Ecuador," Renewable and Sustainable Energy Reviews, Elsevier, vol. 50(C), pages 1108-1124.
- Komorowska, Aleksandra & Benalcazar, Pablo & Kaszyński, Przemysław & Kamiński, Jacek, 2020. "Economic consequences of a capacity market implementation: The case of Poland," Energy Policy, Elsevier, vol. 144(C).
- Growitsch, Christian & Just, Lisa & Pedell, Burkhard, 2014. "Risk Assessment of Investments in Energy-only and Capacity Markets," Die Unternehmung - Swiss Journal of Business Research and Practice, Nomos Verlagsgesellschaft mbH & Co. KG, vol. 68(3), pages 181-188.
- Bhagwat, Pradyumna C. & Richstein, Jörn C. & Chappin, Emile J.L. & Iychettira, Kaveri K. & De Vries, Laurens J., 2017. "Cross-border effects of capacity mechanisms in interconnected power systems," Utilities Policy, Elsevier, vol. 46(C), pages 33-47.
- Thomas-Olivier Léautier, 2016. "The Visible Hand: Ensuring Optimal Investment in Electric Power Generation," The Energy Journal, , vol. 37(2), pages 89-109, April.
- Paul Simshauser & Joel Gilmore, 2020.
"Is the NEM broken? Policy discontinuity and the 2017-2020 investment megacycle,"
Working Papers
EPRG2014, Energy Policy Research Group, Cambridge Judge Business School, University of Cambridge.
- Simshauser, P. & Gilmore, J., 2020. "Is the NEM broken? Policy discontinuity and the 2017-2020 investment megacycle," Cambridge Working Papers in Economics 2048, Faculty of Economics, University of Cambridge.
- Ausubel, Lawrence M. & Cramton, Peter, 2010.
"Using forward markets to improve electricity market design,"
Utilities Policy, Elsevier, vol. 18(4), pages 195-200, December.
- Lawrence M. Ausubel & Peter Cramton, 2009. "Using Forward Markets to Improve Electricity Market Design," Papers of Peter Cramton 09ufm, University of Maryland, Department of Economics - Peter Cramton, revised 2009.
- Arango, Santiago & Larsen, Erik, 2011. "Cycles in deregulated electricity markets: Empirical evidence from two decades," Energy Policy, Elsevier, vol. 39(5), pages 2457-2466, May.
- Simshauser, Paul, 2018. "On intermittent renewable generation & the stability of Australia's National Electricity Market," Energy Economics, Elsevier, vol. 72(C), pages 1-19.
- Mastropietro, Paolo & Rodilla, Pablo & Rivier, Michel & Batlle, Carlos, 2024. "Reliability options: Regulatory recommendations for the next generation of capacity remuneration mechanisms," Energy Policy, Elsevier, vol. 185(C).
- Simshauser, Paul, 2019.
"Missing money, missing policy and Resource Adequacy in Australia's National Electricity Market,"
Utilities Policy, Elsevier, vol. 60(C), pages 1-1.
- Paul Simshauser, 2018. "Missing money, missing policy and Resource Adequacy in Australia's National Electricity Market," Working Papers EPRG 1821, Energy Policy Research Group, Cambridge Judge Business School, University of Cambridge.
- Simshauser, P, 2018. "Missing money, missing policy and Resource Adequacy in Australia’s National Electricity Market," Cambridge Working Papers in Economics 1840, Faculty of Economics, University of Cambridge.
- Bhagwat, Pradyumna C. & Richstein, Jörn C. & Chappin, Emile J.L. & Iychettira, Kaveri K. & Vries, Laurens J. De, 2017. "Cross-border effects of capacity mechanisms in interconnected power systems," EconStor Open Access Articles and Book Chapters, ZBW - Leibniz Information Centre for Economics, vol. 46, pages 33-47.
- Wolfgang Buchholz & Jonas Frank & Hans-Dieter Karl & Johannes Pfeiffer & Karen Pittel & Ursula Triebswetter & Jochen Habermann & Wolfgang Mauch & Thomas Staudacher, 2012. "Die Zukunft der Energiemärkte: Ökonomische Analyse und Bewertung von Potenzialen und Handlungsmöglichkeiten," ifo Forschungsberichte, ifo Institute - Leibniz Institute for Economic Research at the University of Munich, number 57, July.
- Murphy, Sinnott & Lavin, Luke & Apt, Jay, 2020. "Resource adequacy implications of temperature-dependent electric generator availability," Applied Energy, Elsevier, vol. 262(C).
- Meister, Urs, 2014. "Grenzüberschreitende Effekte von Kapazitätsmechanismen," Die Unternehmung - Swiss Journal of Business Research and Practice, Nomos Verlagsgesellschaft mbH & Co. KG, vol. 68(3), pages 189-196.
- Liu, Shuangquan & Yang, Qiang & Cai, Huaxiang & Yan, Minghui & Zhang, Maolin & Wu, Dianning & Xie, Mengfei, 2019. "Market reform of Yunnan electricity in southwestern China: Practice, challenges and implications," Renewable and Sustainable Energy Reviews, Elsevier, vol. 113(C), pages 1-1.
- Bublitz, Andreas & Keles, Dogan & Zimmermann, Florian & Fraunholz, Christoph & Fichtner, Wolf, 2018. "A survey on electricity market design: Insights from theory and real-world implementations of capacity remuneration mechanisms," Working Paper Series in Production and Energy 27, Karlsruhe Institute of Technology (KIT), Institute for Industrial Production (IIP).
- Lynch, Muireann Á. & Devine, Mel, 2015. "Investment vs. Refurbishment: Examining Capacity Payment Mechanisms Using Mixed Complementarity Problems With Endogenous Probability," Papers WP507, Economic and Social Research Institute (ESRI).
- Thomas-Olivier Léautier, 2016.
"The Visible Hand: Ensuring Optimal Investment in Electric Power Generation,"
The Energy Journal, International Association for Energy Economics, vol. 0(Number 2).
- Léautier, Thomas-Olivier, 2011. "The Visible Hand: Ensuring Optimal Investment in Electric Power Generation," TSE Working Papers 10-153, Toulouse School of Economics (TSE), revised 19 Aug 2012.
- Léautier, Thomas-Olivier, 2011. "The Visible Hand: Ensuring Optimal Investment in Electric Power Generation," IDEI Working Papers 605, Institut d'Économie Industrielle (IDEI), Toulouse, revised Mar 2013.
- Simshauser, Paul & Gilmore, Joel, 2022. "Climate change policy discontinuity & Australia's 2016-2021 renewable investment supercycle," Energy Policy, Elsevier, vol. 160(C).
- Csereklyei, Zsuzsanna & Kallies, Anne, 2022. "A legal-economic framework of electricity markets: Assessing Australia’s transition," MPRA Paper 114191, University Library of Munich, Germany.
- Joisa Dutra & Flavio M. Menezes, 2015. "Electricity Market Design in Brazil: An Assessment of the 2004 Reform," Discussion Papers Series 545, School of Economics, University of Queensland, Australia.
- Heidarizadeh, Mohammad & Ahmadian, Mohammad, 2019. "Capacity certificate mechanism: A step forward toward a market based generation capacity incentive," Energy, Elsevier, vol. 172(C), pages 45-56.
- Jin, Taeyoung & Lee, Tae Eui & Kim, Dowon, 2023. "Value of lost load estimation for the South Korea's manufacturing sector—finding the gap between the supply and demand side," Renewable and Sustainable Energy Reviews, Elsevier, vol. 187(C).
- Teirila, J., 2017. "Market Power in the Capacity Market? The Case of Ireland," Cambridge Working Papers in Economics 1727, Faculty of Economics, University of Cambridge.
- Frederic Murphy & Yves Smeers, 2012. "Withholding investments in energy only markets: can contracts make a difference?," Journal of Regulatory Economics, Springer, vol. 42(2), pages 159-179, October.
- Bublitz, Andreas & Keles, Dogan & Zimmermann, Florian & Fraunholz, Christoph & Fichtner, Wolf, 2019. "A survey on electricity market design: Insights from theory and real-world implementations of capacity remuneration mechanisms," Energy Economics, Elsevier, vol. 80(C), pages 1059-1078.