IDEAS home Printed from https://ideas.repec.org/r/inm/ortrsc/v46y2012i2p217-232.html
   My bibliography  Save this item

Railway Rolling Stock Planning: Robustness Against Large Disruptions

Citations

Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
as


Cited by:

  1. Francisco A. Ortega & Miguel A. Pozo & Justo Puerto, 2018. "On-Line Timetable Rescheduling in a Transit Line," Transportation Science, INFORMS, vol. 52(5), pages 1106-1121, October.
  2. Joris Wagenaar & Ioannis Fragkos & Rob Zuidwijk, 2021. "Integrated Planning for Multimodal Networks with Disruptions and Customer Service Requirements," Transportation Science, INFORMS, vol. 55(1), pages 196-221, 1-2.
  3. Ji, Hangyu & Wang, Rui & Zhang, Chuntian & Yin, Jiateng & Ma, Lin & Yang, Lixing, 2024. "Optimization of train schedule with uncertain maintenance plans in high-speed railways: A stochastic programming approach," Omega, Elsevier, vol. 124(C).
  4. Leo Kroon & Gábor Maróti & Lars Nielsen, 2015. "Rescheduling of Railway Rolling Stock with Dynamic Passenger Flows," Transportation Science, INFORMS, vol. 49(2), pages 165-184, May.
  5. Tönissen, D.D. & Arts, J.J., 2018. "Economies of scale in recoverable robust maintenance location routing for rolling stock," Transportation Research Part B: Methodological, Elsevier, vol. 117(PA), pages 360-377.
  6. Jabbarzadeh, Armin & Azad, Nader & Verma, Manish, 2020. "An optimization approach to planning rail hazmat shipments in the presence of random disruptions," Omega, Elsevier, vol. 96(C).
  7. Lusby, Richard M. & Haahr, Jørgen Thorlund & Larsen, Jesper & Pisinger, David, 2017. "A Branch-and-Price algorithm for railway rolling stock rescheduling," Transportation Research Part B: Methodological, Elsevier, vol. 99(C), pages 228-250.
  8. Zhou, Yaoming & Kundu, Tanmoy & Qin, Wei & Goh, Mark & Sheu, Jiuh-Biing, 2021. "Vulnerability of the worldwide air transportation network to global catastrophes such as COVID-19," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 154(C).
  9. Vansteenwegen, Pieter & Dewilde, Thijs & Burggraeve, Sofie & Cattrysse, Dirk, 2016. "An iterative approach for reducing the impact of infrastructure maintenance on the performance of railway systems," European Journal of Operational Research, Elsevier, vol. 252(1), pages 39-53.
  10. Carrizosa, Emilio & Goerigk, Marc & Schöbel, Anita, 2017. "A biobjective approach to recoverable robustness based on location planning," European Journal of Operational Research, Elsevier, vol. 261(2), pages 421-435.
  11. van der Hurk, E. & Koutsopoulos, H.N. & Wilson, N. & Kroon, L.G. & Maróti, G., 2014. "Shuttle Planning for Link Closures in Urban Public Transport Networks," ERIM Report Series Research in Management ERS-2014-011-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
  12. Gao, Yuan & Schmidt, Marie & Yang, Lixing & Gao, Ziyou, 2020. "A branch-and-price approach for trip sequence planning of high-speed train units," Omega, Elsevier, vol. 92(C).
  13. Chen, Zebin & D’Ariano, Andrea & Li, Shukai & Tessitore, Marta Leonina & Yang, Lixing, 2024. "Robust dynamic train regulation integrated with stop-skipping strategy in urban rail networks: An outer approximation based solution method," Omega, Elsevier, vol. 128(C).
  14. Lucas P. Veelenturf & Daniel Potthoff & Dennis Huisman & Leo G. Kroon & Gábor Maróti & Albert P. M. Wagelmans, 2016. "A Quasi-Robust Optimization Approach for Crew Rescheduling," Transportation Science, INFORMS, vol. 50(1), pages 204-215, February.
  15. Evelien van der Hurk & Leo Kroon & Gábor Maróti, 2018. "Passenger Advice and Rolling Stock Rescheduling Under Uncertainty for Disruption Management," Service Science, INFORMS, vol. 52(6), pages 1391-1411, December.
  16. Wagenaar, Joris & Kroon, Leo & Fragkos, Ioannis, 2017. "Rolling stock rescheduling in passenger railway transportation using dead-heading trips and adjusted passenger demand," Transportation Research Part B: Methodological, Elsevier, vol. 101(C), pages 140-161.
  17. Maarten L. Trap & Dennis Huisman & Rob M. P. Goverde, 2017. "Assessment of alternative line plans for severe winter conditions in the Netherlands," Public Transport, Springer, vol. 9(1), pages 55-71, July.
  18. Canca, David & Barrena, Eva, 2018. "The integrated rolling stock circulation and depot location problem in railway rapid transit systems," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 109(C), pages 115-138.
  19. Lusby, Richard M. & Larsen, Jesper & Bull, Simon, 2018. "A survey on robustness in railway planning," European Journal of Operational Research, Elsevier, vol. 266(1), pages 1-15.
  20. Tomas Lidén, 2020. "Coordinating maintenance windows and train traffic: a case study," Public Transport, Springer, vol. 12(2), pages 261-298, June.
  21. Li, Tao & Rong, Lili, 2020. "A comprehensive method for the robustness assessment of high-speed rail network with operation data: A case in China," Transportation Research Part A: Policy and Practice, Elsevier, vol. 132(C), pages 666-681.
  22. Cadarso, Luis & Marín, Ángel & Maróti, Gábor, 2013. "Recovery of disruptions in rapid transit networks," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 53(C), pages 15-33.
  23. Yin, Jiateng & Pu, Fan & Yang, Lixing & D’Ariano, Andrea & Wang, Zhouhong, 2023. "Integrated optimization of rolling stock allocation and train timetables for urban rail transit networks: A benders decomposition approach," Transportation Research Part B: Methodological, Elsevier, vol. 176(C).
  24. Gao, Yuan & Xia, Jun & D’Ariano, Andrea & Yang, Lixing, 2022. "Weekly rolling stock planning in Chinese high-speed rail networks," Transportation Research Part B: Methodological, Elsevier, vol. 158(C), pages 295-322.
  25. Wenjun Li & Lei Nie & Tianwei Zhang, 2018. "Electric multiple unit circulation plan optimization based on the branch-and-price algorithm under different maintenance management schemes," PLOS ONE, Public Library of Science, vol. 13(7), pages 1-23, July.
  26. Cadarso, Luis & Escudero, Laureano F. & Marín, Angel, 2018. "On strategic multistage operational two-stage stochastic 0–1 optimization for the Rapid Transit Network Design problem," European Journal of Operational Research, Elsevier, vol. 271(2), pages 577-593.
  27. Evelien van der Hurk & Haris N. Koutsopoulos & Nigel Wilson & Leo G. Kroon & Gábor Maróti, 2016. "Shuttle Planning for Link Closures in Urban Public Transport Networks," Transportation Science, INFORMS, vol. 50(3), pages 947-965, August.
  28. Eva König, 2020. "A review on railway delay management," Public Transport, Springer, vol. 12(2), pages 335-361, June.
  29. Tang, Junqing & Xu, Lei & Luo, Chunling & Ng, Tsan Sheng Adam, 2021. "Multi-disruption resilience assessment of rail transit systems with optimized commuter flows," Reliability Engineering and System Safety, Elsevier, vol. 214(C).
IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.