IDEAS home Printed from https://ideas.repec.org/r/inm/oropre/v40y1992i5p959-971.html
   My bibliography  Save this item

Production Batching with Machine Breakdowns and Safety Stocks

Citations

Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
as


Cited by:

  1. Meller, Russell D. & Kim, David S., 1996. "The impact of preventive maintenance on system cost and buffer size," European Journal of Operational Research, Elsevier, vol. 95(3), pages 577-591, December.
  2. Jeang, Angus, 2012. "Simultaneous determination of production lot size and process parameters under process deterioration and process breakdown," Omega, Elsevier, vol. 40(6), pages 774-781.
  3. Chelbi, Anis & Rezg, Nidhal, 2006. "Analysis of a production/inventory system with randomly failing production unit subjected to a minimum required availability level," International Journal of Production Economics, Elsevier, vol. 99(1-2), pages 131-143, February.
  4. Giri, B. C. & Yun, W. Y. & Dohi, T., 2005. "Optimal design of unreliable production-inventory systems with variable production rate," European Journal of Operational Research, Elsevier, vol. 162(2), pages 372-386, April.
  5. Thomas Sloan, 2008. "Simultaneous determination of production and maintenance schedules using in‐line equipment condition and yield information," Naval Research Logistics (NRL), John Wiley & Sons, vol. 55(2), pages 116-129, March.
  6. Chelbi, Anis & Ait-Kadi, Daoud, 2004. "Analysis of a production/inventory system with randomly failing production unit submitted to regular preventive maintenance," European Journal of Operational Research, Elsevier, vol. 156(3), pages 712-718, August.
  7. Giri, B. C. & Dohi, T., 2004. "Optimal lot sizing for an unreliable production system based on net present value approach," International Journal of Production Economics, Elsevier, vol. 92(2), pages 157-167, November.
  8. Dbouk, Wassim & Moussawi-Haidar, Lama & Jaber, Mohamad Y., 2020. "The effect of economic uncertainty on inventory and working capital for manufacturing firms," International Journal of Production Economics, Elsevier, vol. 230(C).
  9. Peymankar, Mahboobe & Dehghanian, Farzad & Ghiami, Yousef & Abolbashari, Mohammad Hassan, 2018. "The effects of contractual agreements on the economic production quantity model with machine breakdown," International Journal of Production Economics, Elsevier, vol. 201(C), pages 203-215.
  10. Xiaoqiang Cai & Xianyi Wu & Xian Zhou, 2009. "Stochastic Scheduling Subject to Preemptive-Repeat Breakdowns with Incomplete Information," Operations Research, INFORMS, vol. 57(5), pages 1236-1249, October.
  11. Nabil Nahas, 2017. "Buffer allocation and preventive maintenance optimization in unreliable production lines," Journal of Intelligent Manufacturing, Springer, vol. 28(1), pages 85-93, January.
  12. Skouri, K. & Konstantaras, I. & Lagodimos, A.G. & Papachristos, S., 2014. "An EOQ model with backorders and rejection of defective supply batches," International Journal of Production Economics, Elsevier, vol. 155(C), pages 148-154.
  13. Antonio Arreola‐Risa & Gregory A. DeCroix, 1998. "Inventory management under random supply disruptions and partial backorders," Naval Research Logistics (NRL), John Wiley & Sons, vol. 45(7), pages 687-703, October.
  14. Wright, CM & Mehrez, A, 1998. "An Overview of Representative Research of the Relationships Between Quality and Inventory," Omega, Elsevier, vol. 26(1), pages 29-47, February.
  15. Om Prakash & A.R. Roy & A. Goswami, 2014. "Stochastic manufacturing system with process deterioration and machine breakdown," International Journal of Systems Science, Taylor & Francis Journals, vol. 45(12), pages 2539-2551, December.
  16. Ait-El-Cadi, Abdessamad & Gharbi, Ali & Dhouib, Karem & Artiba, Abdelhakim, 2021. "Integrated production, maintenance and quality control policy for unreliable manufacturing systems under dynamic inspection," International Journal of Production Economics, Elsevier, vol. 236(C).
  17. Ki Ling Cheung & Warren H. Hausman, 1997. "Joint determination of preventive maintenance and safety stocks in an unreliable production environment," Naval Research Logistics (NRL), John Wiley & Sons, vol. 44(3), pages 257-272, April.
  18. Viliam Makis, 1998. "Optimal lot sizing and inspection policy for an EMQ model with imperfect inspections," Naval Research Logistics (NRL), John Wiley & Sons, vol. 45(2), pages 165-186, March.
  19. Lee, S. D. & Rung, J. M., 2000. "Production lot sizing in failure prone two-stage serial systems," European Journal of Operational Research, Elsevier, vol. 123(1), pages 42-60, May.
  20. Bouslah, Bassem & Gharbi, Ali & Pellerin, Robert, 2013. "Joint optimal lot sizing and production control policy in an unreliable and imperfect manufacturing system," International Journal of Production Economics, Elsevier, vol. 144(1), pages 143-156.
  21. Mohebbi, E., 2008. "A note on a production control model for a facility with limited storage capacity in a random environment," European Journal of Operational Research, Elsevier, vol. 190(2), pages 562-570, October.
  22. Salameh, M. K. & Ghattas, R. E., 2001. "Optimal just-in-time buffer inventory for regular preventive maintenance," International Journal of Production Economics, Elsevier, vol. 74(1-3), pages 157-161, December.
  23. Kazaz, Burak & Sloan, Thomas W., 2013. "The impact of process deterioration on production and maintenance policies," European Journal of Operational Research, Elsevier, vol. 227(1), pages 88-100.
  24. Giri, B. C. & Yun, W. Y., 2005. "Optimal lot sizing for an unreliable production system under partial backlogging and at most two failures in a production cycle," International Journal of Production Economics, Elsevier, vol. 95(2), pages 229-243, February.
  25. Gonçalves, João N.C. & Sameiro Carvalho, M. & Cortez, Paulo, 2020. "Operations research models and methods for safety stock determination: A review," Operations Research Perspectives, Elsevier, vol. 7(C).
  26. Kim, Chang Hyun & Hong, Yushin, 1997. "An extended EMQ model for a failure prone machine with general lifetime distribution," International Journal of Production Economics, Elsevier, vol. 49(3), pages 215-223, May.
IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.