IDEAS home Printed from https://ideas.repec.org/r/inm/oropre/v23y1975i4p711-734.html
   My bibliography  Save this item

Planning Horizons for the Dynamic Lot Size Model: Zabel vs. Protective Procedures and Computational Results

Citations

Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
as


Cited by:

  1. Robert L. Smith & Rachel Q. Zhang, 1998. "Infinite Horizon Production Planning in Time-Varying Systems with Convex Production and Inventory Costs," Management Science, INFORMS, vol. 44(9), pages 1313-1320, September.
  2. Marshall Fisher & Kamalini Ramdas & Yu-Sheng Zheng, 2001. "Ending Inventory Valuation in Multiperiod Production Scheduling," Management Science, INFORMS, vol. 47(5), pages 679-692, May.
  3. Kimms, A, 1998. "Stability Measures for Rolling Schedules with Applications to Capacity Expansion Planning, Master Production Scheduling, and Lot Sizing," Omega, Elsevier, vol. 26(3), pages 355-366, June.
  4. Sahin, Funda & Powell Robinson, E. & Gao, Li-Lian, 2008. "Master production scheduling policy and rolling schedules in a two-stage make-to-order supply chain," International Journal of Production Economics, Elsevier, vol. 115(2), pages 528-541, October.
  5. Aarts, E. H. L. & Reijnhoudt, M. F. & Stehouwer, H. P. & Wessels, J., 2000. "A novel decomposition approach for on-line lot-sizing," European Journal of Operational Research, Elsevier, vol. 122(2), pages 339-353, April.
  6. Michael Bastian, 1992. "A perfect lot‐tree procedure for the discounted dynamic lot‐size problem with speculation," Naval Research Logistics (NRL), John Wiley & Sons, vol. 39(5), pages 651-668, August.
  7. Martel, Alain & Gascon, Andre, 1998. "Dynamic lot-sizing with price changes and price-dependent holding costs," European Journal of Operational Research, Elsevier, vol. 111(1), pages 114-128, November.
  8. Ahmed, Shabbir & Sahinidis, Nikolaos V., 2008. "Selection, acquisition, and allocation of manufacturing technology in a multi-period environment," European Journal of Operational Research, Elsevier, vol. 189(3), pages 807-821, September.
  9. Jing, Fuying & Chao, Xiangrui, 2022. "Forecast horizons for a two-echelon dynamic lot-sizing problem," Omega, Elsevier, vol. 110(C).
  10. Balakrishnan, Jaydeep & Hung Cheng, Chun, 2009. "The dynamic plant layout problem: Incorporating rolling horizons and forecast uncertainty," Omega, Elsevier, vol. 37(1), pages 165-177, February.
  11. S. Selcuk Erenguc, 1988. "Multiproduct dynamic lot‐sizing model with coordinated replenishments," Naval Research Logistics (NRL), John Wiley & Sons, vol. 35(1), pages 1-22, February.
  12. Alain Bensoussan & Jean‐Marie Proth & Maurice Queyranne, 1991. "A planning horizon algorithm for deterministic inventory management with piecewise linear concave costs," Naval Research Logistics (NRL), John Wiley & Sons, vol. 38(5), pages 729-742, October.
  13. Lodi, Andrea & Vigo, Daniele & Zannoni, Cinzia, 2000. "Exact and heuristic algorithms for data sets reconstruction," European Journal of Operational Research, Elsevier, vol. 124(1), pages 139-150, July.
  14. Milind Dawande & Srinagesh Gavirneni & Sanjeewa Naranpanawe & Suresh Sethi, 2007. "Forecast Horizons for a Class of Dynamic Lot-Size Problems Under Discrete Future Demand," Operations Research, INFORMS, vol. 55(4), pages 688-702, August.
  15. Fuying Jing & Zirui Lan, 2017. "Forecast horizon of multi-item dynamic lot size model with perishable inventory," PLOS ONE, Public Library of Science, vol. 12(11), pages 1-15, November.
  16. Awi Federgruen & Michal Tzur, 1996. "Detection of minimal forecast horizons in dynamic programs with multiple indicators of the future," Naval Research Logistics (NRL), John Wiley & Sons, vol. 43(2), pages 169-189, March.
  17. Suresh Chand & Vernon Ning Hsu & Suresh Sethi, 2002. "Forecast, Solution, and Rolling Horizons in Operations Management Problems: A Classified Bibliography," Manufacturing & Service Operations Management, INFORMS, vol. 4(1), pages 25-43, September.
  18. Richter, Knut & Sombrutzki, Mirko, 2000. "Remanufacturing planning for the reverse Wagner/Whitin models," European Journal of Operational Research, Elsevier, vol. 121(2), pages 304-315, March.
  19. Kimms, Alf, 1996. "Stability measures for rolling schedules with applications to capacity expansion planning, master production scheduling, and lot sizing," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 418, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
  20. Jeunet, Jully, 2006. "Demand forecast accuracy and performance of inventory policies under multi-level rolling schedule environments," International Journal of Production Economics, Elsevier, vol. 103(1), pages 401-419, September.
  21. Shen Hong & Deng Qiang & Lao Rebecca & Wu Simon, 2016. "A Case Study of Inventory Management in a Manufacturing Company in China," Nang Yan Business Journal, Sciendo, vol. 5(1), pages 20-40, December.
  22. Narayanan, Arunachalam & Robinson, Powell, 2010. "Evaluation of joint replenishment lot-sizing procedures in rolling horizon planning systems," International Journal of Production Economics, Elsevier, vol. 127(1), pages 85-94, September.
  23. repec:dau:papers:123456789/2078 is not listed on IDEAS
  24. S. Bylka & S. Sethi & G. Sorger, 1992. "Minimal forecast horizons in equipment replacement models with multiple technologies and general switching costs," Naval Research Logistics (NRL), John Wiley & Sons, vol. 39(4), pages 487-507, June.
  25. Bhattacharjee, Sudip & Ramesh, R., 2000. "A multi-period profit maximizing model for retail supply chain management: An integration of demand and supply-side mechanisms," European Journal of Operational Research, Elsevier, vol. 122(3), pages 584-601, May.
  26. Brahimi, Nadjib & Dauzere-Peres, Stephane & Najid, Najib M. & Nordli, Atle, 2006. "Single item lot sizing problems," European Journal of Operational Research, Elsevier, vol. 168(1), pages 1-16, January.
IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.