IDEAS home Printed from https://ideas.repec.org/a/vrs/nybujo/v5y2016i1p20-40n3.html
   My bibliography  Save this article

A Case Study of Inventory Management in a Manufacturing Company in China

Author

Listed:
  • Shen Hong
  • Deng Qiang
  • Lao Rebecca
  • Wu Simon

    (Faculty of Business Administration, University of Macau, Taipa, Macau)

Abstract

In this paper, we focus on inventory management in a manufacturing company in China. This study aims to identify the key factors that influence inventory management practices, investigate efficient and effective inventory management approaches, and examine the impact of supplier cooperation on supply chain improvement. A case study approach is used to identify the key factors that influence inventory management in a factory. Efficient and effective inventory management practices are derived from the case study and may provide practical guidance for foreign manufacturers in China. This study provides a valuable tool for identifying the key factors in inventory management which can be applied to similar problems encountered in actual manufactories.

Suggested Citation

  • Shen Hong & Deng Qiang & Lao Rebecca & Wu Simon, 2016. "A Case Study of Inventory Management in a Manufacturing Company in China," Nang Yan Business Journal, Sciendo, vol. 5(1), pages 20-40, December.
  • Handle: RePEc:vrs:nybujo:v:5:y:2016:i:1:p:20-40:n:3
    DOI: 10.1515/nybj-2017-0003
    as

    Download full text from publisher

    File URL: https://doi.org/10.1515/nybj-2017-0003
    Download Restriction: no

    File URL: https://libkey.io/10.1515/nybj-2017-0003?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    References listed on IDEAS

    as
    1. Leandro C. Coelho & Gilbert Laporte, 2015. "An optimised target-level inventory replenishment policy for vendor-managed inventory systems," International Journal of Production Research, Taylor & Francis Journals, vol. 53(12), pages 3651-3660, June.
    2. Rolf A. Lundin & Thomas E. Morton, 1975. "Planning Horizons for the Dynamic Lot Size Model: Zabel vs. Protective Procedures and Computational Results," Operations Research, INFORMS, vol. 23(4), pages 711-734, August.
    3. Awi Federgruen & Michal Tzur, 1995. "Fast Solution and Detection of Minimal Forecast Horizons in Dynamic Programs with a Single Indicator of the Future: Applications to Dynamic Lot-Sizing Models," Management Science, INFORMS, vol. 41(5), pages 874-893, May.
    4. Suresh Chand & Thomas E. Morton, 1986. "Minimal forecast horizon procedures for dynamic lot size models," Naval Research Logistics Quarterly, John Wiley & Sons, vol. 33(1), pages 111-122, February.
    5. Taleizadeh, Ata Allah & Noori-daryan, Mahsa & Cárdenas-Barrón, Leopoldo Eduardo, 2015. "Joint optimization of price, replenishment frequency, replenishment cycle and production rate in vendor managed inventory system with deteriorating items," International Journal of Production Economics, Elsevier, vol. 159(C), pages 285-295.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Fuying Jing & Zirui Lan, 2017. "Forecast horizon of multi-item dynamic lot size model with perishable inventory," PLOS ONE, Public Library of Science, vol. 12(11), pages 1-15, November.
    2. Awi Federgruen & Michal Tzur, 1996. "Detection of minimal forecast horizons in dynamic programs with multiple indicators of the future," Naval Research Logistics (NRL), John Wiley & Sons, vol. 43(2), pages 169-189, March.
    3. Kimms, Alf, 1996. "Stability measures for rolling schedules with applications to capacity expansion planning, master production scheduling, and lot sizing," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 418, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    4. Michael Bastian, 1992. "A perfect lot‐tree procedure for the discounted dynamic lot‐size problem with speculation," Naval Research Logistics (NRL), John Wiley & Sons, vol. 39(5), pages 651-668, August.
    5. Suresh Chand & Vernon Ning Hsu & Suresh Sethi, 2002. "Forecast, Solution, and Rolling Horizons in Operations Management Problems: A Classified Bibliography," Manufacturing & Service Operations Management, INFORMS, vol. 4(1), pages 25-43, September.
    6. Kimms, A, 1998. "Stability Measures for Rolling Schedules with Applications to Capacity Expansion Planning, Master Production Scheduling, and Lot Sizing," Omega, Elsevier, vol. 26(3), pages 355-366, June.
    7. Milind Dawande & Srinagesh Gavirneni & Sanjeewa Naranpanawe & Suresh Sethi, 2007. "Forecast Horizons for a Class of Dynamic Lot-Size Problems Under Discrete Future Demand," Operations Research, INFORMS, vol. 55(4), pages 688-702, August.
    8. Alain Bensoussan & Jean‐Marie Proth & Maurice Queyranne, 1991. "A planning horizon algorithm for deterministic inventory management with piecewise linear concave costs," Naval Research Logistics (NRL), John Wiley & Sons, vol. 38(5), pages 729-742, October.
    9. S. Selcuk Erenguc, 1988. "Multiproduct dynamic lot‐sizing model with coordinated replenishments," Naval Research Logistics (NRL), John Wiley & Sons, vol. 35(1), pages 1-22, February.
    10. Taleizadeh, Ata Allah & Shokr, Iman & Konstantaras, Ioannis & VafaeiNejad, Mahyar, 2020. "Stock replenishment policies for a vendor-managed inventory in a retailing system," Journal of Retailing and Consumer Services, Elsevier, vol. 55(C).
    11. Stanislaw Bylka, 1997. "Strong turnpike policies in the single‐item capacitated lot‐sizing problem with periodical dynamic parameter," Naval Research Logistics (NRL), John Wiley & Sons, vol. 44(8), pages 775-790, December.
    12. Martel, Alain & Gascon, Andre, 1998. "Dynamic lot-sizing with price changes and price-dependent holding costs," European Journal of Operational Research, Elsevier, vol. 111(1), pages 114-128, November.
    13. Drexl, A. & Kimms, A., 1997. "Lot sizing and scheduling -- Survey and extensions," European Journal of Operational Research, Elsevier, vol. 99(2), pages 221-235, June.
    14. Sahin, Funda & Powell Robinson, E. & Gao, Li-Lian, 2008. "Master production scheduling policy and rolling schedules in a two-stage make-to-order supply chain," International Journal of Production Economics, Elsevier, vol. 115(2), pages 528-541, October.
    15. Adeinat, Hamza & Pazhani, Subramanian & Mendoza, Abraham & Ventura, Jose A., 2022. "Coordination of pricing and inventory replenishment decisions in a supply chain with multiple geographically dispersed retailers," International Journal of Production Economics, Elsevier, vol. 248(C).
    16. Aarts, E. H. L. & Reijnhoudt, M. F. & Stehouwer, H. P. & Wessels, J., 2000. "A novel decomposition approach for on-line lot-sizing," European Journal of Operational Research, Elsevier, vol. 122(2), pages 339-353, April.
    17. Arpita Roy & Shib Sankar Sana & Kripasindhu Chaudhuri, 2018. "Optimal Pricing of competing retailers under uncertain demand-a two layer supply chain model," Annals of Operations Research, Springer, vol. 260(1), pages 481-500, January.
    18. Menezes, Mozart B.C. & Jalali, Hamed & Lamas, Alejandro, 2021. "One too many: Product proliferation and the financial performance in manufacturing," International Journal of Production Economics, Elsevier, vol. 242(C).
    19. Al-Amin Khan, Md. & Shaikh, Ali Akbar & Konstantaras, Ioannis & Bhunia, Asoke Kumar & Cárdenas-Barrón, Leopoldo Eduardo, 2020. "Inventory models for perishable items with advanced payment, linearly time-dependent holding cost and demand dependent on advertisement and selling price," International Journal of Production Economics, Elsevier, vol. 230(C).
    20. Chen, Zhixiang, 2019. "Reprint of “Optimization of production inventory with pricing and promotion effort for a single-vendor multi-buyer system of perishable products”," International Journal of Production Economics, Elsevier, vol. 209(C), pages 285-301.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:vrs:nybujo:v:5:y:2016:i:1:p:20-40:n:3. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Peter Golla (email available below). General contact details of provider: https://www.sciendo.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.