IDEAS home Printed from https://ideas.repec.org/r/inm/ormnsc/v33y1987i1p39-57.html
   My bibliography  Save this item

Kanban, MRP, and Shaping the Manufacturing Environment

Citations

Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
as


Cited by:

  1. Jonsson, Patrik, 2008. "Exploring problems related to the materials planning user environment," International Journal of Production Economics, Elsevier, vol. 113(1), pages 383-400, May.
  2. Pereira, Javier & Paulre, Bernard, 2001. "Flexibility in manufacturing systems: A relational and a dynamic approach," European Journal of Operational Research, Elsevier, vol. 130(1), pages 70-82, April.
  3. repec:dgr:rugsom:98a07 is not listed on IDEAS
  4. Sanchez, Susan M. & Moeeni, Farhad & Sanchez, Paul J., 2006. "So many factors, so little time...Simulation experiments in the frequency domain," International Journal of Production Economics, Elsevier, vol. 103(1), pages 149-165, September.
  5. Oke, Adegoke & Szwejczewski, Marek, 2005. "The relationship between UK manufacturers' inventory levels and supply, internal and market factors," International Journal of Production Economics, Elsevier, vol. 93(1), pages 151-160, January.
  6. Gaury, E.G.A. & Kleijnen, J.P.C. & Pierreval, H., 1998. "Customized Pull Systems for Single-Product Flow Lines," Discussion Paper 1998-117, Tilburg University, Center for Economic Research.
  7. Geraghty, John & Heavey, Cathal, 2004. "A comparison of Hybrid Push/Pull and CONWIP/Pull production inventory control policies," International Journal of Production Economics, Elsevier, vol. 91(1), pages 75-90, September.
  8. Gaury, E.G.A. & Pierreval, H. & Kleijnen, J.P.C., 1998. "New species of hybrid pull systems," Other publications TiSEM 8be33c99-40bc-4af0-bdf8-8, Tilburg University, School of Economics and Management.
  9. Fernandez-Viagas, Victor & Molina-Pariente, Jose M. & Framinan, Jose M., 2020. "Generalised accelerations for insertion-based heuristics in permutation flowshop scheduling," European Journal of Operational Research, Elsevier, vol. 282(3), pages 858-872.
  10. Kaman, Cumhur & Savasaneril, Secil & Serin, Yasemin, 2013. "Production and lead time quotation under imperfect shop floor information," International Journal of Production Economics, Elsevier, vol. 144(2), pages 422-431.
  11. Riezebos, J., 1998. "Production planning systems for cellular manufacturing," Research Report 98A07, University of Groningen, Research Institute SOM (Systems, Organisations and Management).
  12. Drexl, Andreas & Kimms, Alf, 1999. "Belastungsorientierte Just-in-Time Variantenfließfertigung," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 502, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
  13. Benton, W. C. & Shin, Hojung, 1998. "Manufacturing planning and control: The evolution of MRP and JIT integration," European Journal of Operational Research, Elsevier, vol. 110(3), pages 411-440, November.
  14. D J Meade & S Kumar & B White, 2010. "Analysing the impact of the implementation of lean manufacturing strategies on profitability," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 61(5), pages 858-871, May.
  15. Fernando Luis Rossi & Marcelo Seido Nagano, 2022. "Beam search-based heuristics for the mixed no-idle flowshop with total flowtime criterion," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 44(4), pages 1311-1346, December.
  16. S Wang & B R Sarker, 2004. "A single-stage supply chain system controlled by kanban under just-in-time philosophy," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 55(5), pages 485-494, May.
  17. White, Richard E. & Prybutok, Victor, 2001. "The relationship between JIT practices and type of production system," Omega, Elsevier, vol. 29(2), pages 113-124, April.
  18. Hurley, Simon F. & Clay Whybark, D., 1999. "Inventory and capacity trade-offs in a manufacturing cell," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 203-212, March.
  19. Riezebos, Jan, 2002. "Time bucket size and lot-splitting approach," Research Report 02A42, University of Groningen, Research Institute SOM (Systems, Organisations and Management).
  20. Rom, Walter O. & Tukel, Oya Icmeli & Muscatello, Joseph R., 2002. "MRP in a job shop environment using a resource constrained project scheduling model," Omega, Elsevier, vol. 30(4), pages 275-286, August.
  21. Ou, Jihong & Jiang, Jiong, 1997. "Yield comparison of push and pull control methods on production systems with unreliable machines," International Journal of Production Economics, Elsevier, vol. 50(1), pages 1-12, May.
  22. Libralesso, Luc & Focke, Pablo Andres & Secardin, Aurélien & Jost, Vincent, 2022. "Iterative beam search algorithms for the permutation flowshop," European Journal of Operational Research, Elsevier, vol. 301(1), pages 217-234.
  23. Allahverdi, Ali & Soroush, H.M., 2008. "The significance of reducing setup times/setup costs," European Journal of Operational Research, Elsevier, vol. 187(3), pages 978-984, June.
  24. Paul M. Swamidass & Satish S. Nair & Sanjay I. Mistry, 1999. "The Use of a Neural Factory to Investigate the Effect of Product Line Width on Manufacturing Performance," Management Science, INFORMS, vol. 45(11), pages 1524-1538, November.
  25. repec:dgr:rugsom:02a42 is not listed on IDEAS
  26. Shen, Liji & Dauzère-Pérès, Stéphane & Neufeld, Janis S., 2018. "Solving the flexible job shop scheduling problem with sequence-dependent setup times," European Journal of Operational Research, Elsevier, vol. 265(2), pages 503-516.
  27. Sarac, Aysegul & Absi, Nabil & Dauzère-Pérès, Stéphane, 2010. "A literature review on the impact of RFID technologies on supply chain management," International Journal of Production Economics, Elsevier, vol. 128(1), pages 77-95, November.
  28. Craighead, Christopher W. & Patterson, J. Wayne & Fredendall, Lawrence D., 2001. "Protective capacity positioning: Impact on manufacturing cell performance," European Journal of Operational Research, Elsevier, vol. 134(2), pages 425-438, October.
  29. Hong, Jae-Dong & Kim, Seung-Lae & Hayya, Jack C., 1996. "Dynamic setup reduction in production lot sizing with nonconstant deterministic demand," European Journal of Operational Research, Elsevier, vol. 90(1), pages 182-196, April.
  30. Wright, CM & Mehrez, A, 1998. "An Overview of Representative Research of the Relationships Between Quality and Inventory," Omega, Elsevier, vol. 26(1), pages 29-47, February.
  31. Fleisch, Elgar & Tellkamp, Christian, 2005. "Inventory inaccuracy and supply chain performance: a simulation study of a retail supply chain," International Journal of Production Economics, Elsevier, vol. 95(3), pages 373-385, March.
  32. Yucesan, Enver & de Groote, Xavier, 2000. "Lead times, order release mechanisms, and customer service," European Journal of Operational Research, Elsevier, vol. 120(1), pages 118-130, January.
  33. Jacobs, F. Robert & Bendoly, Elliot, 2003. "Enterprise resource planning: Developments and directions for operations management research," European Journal of Operational Research, Elsevier, vol. 146(2), pages 233-240, April.
  34. Cannon, Alan R., 2008. "Inventory improvement and financial performance," International Journal of Production Economics, Elsevier, vol. 115(2), pages 581-593, October.
  35. Ishii, Kazuyoshi & Imori, Shigeki, 1996. "A production ordering system for two-item, two-stage, capacity-constraint production and inventory model," International Journal of Production Economics, Elsevier, vol. 44(1-2), pages 119-128, June.
  36. Ahmadi, Reza H. & Matsuo, Hirofumi, 2000. "A mini-line approach for pull production," European Journal of Operational Research, Elsevier, vol. 125(2), pages 340-358, September.
  37. Allahverdi, Ali & Gupta, Jatinder N. D. & Aldowaisan, Tariq, 1999. "A review of scheduling research involving setup considerations," Omega, Elsevier, vol. 27(2), pages 219-239, April.
  38. Hirakawa, Yasuhiro, 1996. "Performance of a multistage hybrid push/pull production control system," International Journal of Production Economics, Elsevier, vol. 44(1-2), pages 129-135, June.
IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.