My bibliography
Save this item
Kanban, MRP, and Shaping the Manufacturing Environment
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Jonsson, Patrik, 2008. "Exploring problems related to the materials planning user environment," International Journal of Production Economics, Elsevier, vol. 113(1), pages 383-400, May.
- Pereira, Javier & Paulre, Bernard, 2001. "Flexibility in manufacturing systems: A relational and a dynamic approach," European Journal of Operational Research, Elsevier, vol. 130(1), pages 70-82, April.
- repec:dgr:rugsom:98a07 is not listed on IDEAS
- Sanchez, Susan M. & Moeeni, Farhad & Sanchez, Paul J., 2006. "So many factors, so little time...Simulation experiments in the frequency domain," International Journal of Production Economics, Elsevier, vol. 103(1), pages 149-165, September.
- Oke, Adegoke & Szwejczewski, Marek, 2005. "The relationship between UK manufacturers' inventory levels and supply, internal and market factors," International Journal of Production Economics, Elsevier, vol. 93(1), pages 151-160, January.
- Gaury, E.G.A. & Kleijnen, J.P.C. & Pierreval, H., 1998.
"Customized Pull Systems for Single-Product Flow Lines,"
Discussion Paper
1998-117, Tilburg University, Center for Economic Research.
- Gaury, E.G.A. & Kleijnen, J.P.C. & Pierreval, H., 1998. "Customized Pull Systems for Single-Product Flow Lines," Other publications TiSEM ac7da569-7495-4fc4-a4e1-0, Tilburg University, School of Economics and Management.
- Geraghty, John & Heavey, Cathal, 2004. "A comparison of Hybrid Push/Pull and CONWIP/Pull production inventory control policies," International Journal of Production Economics, Elsevier, vol. 91(1), pages 75-90, September.
- Gaury, E.G.A. & Pierreval, H. & Kleijnen, J.P.C., 1998.
"New species of hybrid pull systems,"
Other publications TiSEM
8be33c99-40bc-4af0-bdf8-8, Tilburg University, School of Economics and Management.
- Gaury, E.G.A. & Pierreval, H. & Kleijnen, J.P.C., 1998. "New species of hybrid pull systems," Discussion Paper 1998-31, Tilburg University, Center for Economic Research.
- Fernandez-Viagas, Victor & Molina-Pariente, Jose M. & Framinan, Jose M., 2020. "Generalised accelerations for insertion-based heuristics in permutation flowshop scheduling," European Journal of Operational Research, Elsevier, vol. 282(3), pages 858-872.
- Kaman, Cumhur & Savasaneril, Secil & Serin, Yasemin, 2013. "Production and lead time quotation under imperfect shop floor information," International Journal of Production Economics, Elsevier, vol. 144(2), pages 422-431.
- Riezebos, J., 1998. "Production planning systems for cellular manufacturing," Research Report 98A07, University of Groningen, Research Institute SOM (Systems, Organisations and Management).
- Drexl, Andreas & Kimms, Alf, 1999. "Belastungsorientierte Just-in-Time Variantenfließfertigung," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 502, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
- Benton, W. C. & Shin, Hojung, 1998. "Manufacturing planning and control: The evolution of MRP and JIT integration," European Journal of Operational Research, Elsevier, vol. 110(3), pages 411-440, November.
- D J Meade & S Kumar & B White, 2010. "Analysing the impact of the implementation of lean manufacturing strategies on profitability," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 61(5), pages 858-871, May.
- Fernando Luis Rossi & Marcelo Seido Nagano, 2022. "Beam search-based heuristics for the mixed no-idle flowshop with total flowtime criterion," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 44(4), pages 1311-1346, December.
- S Wang & B R Sarker, 2004. "A single-stage supply chain system controlled by kanban under just-in-time philosophy," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 55(5), pages 485-494, May.
- White, Richard E. & Prybutok, Victor, 2001. "The relationship between JIT practices and type of production system," Omega, Elsevier, vol. 29(2), pages 113-124, April.
- Hurley, Simon F. & Clay Whybark, D., 1999. "Inventory and capacity trade-offs in a manufacturing cell," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 203-212, March.
- Riezebos, Jan, 2002. "Time bucket size and lot-splitting approach," Research Report 02A42, University of Groningen, Research Institute SOM (Systems, Organisations and Management).
- Rom, Walter O. & Tukel, Oya Icmeli & Muscatello, Joseph R., 2002. "MRP in a job shop environment using a resource constrained project scheduling model," Omega, Elsevier, vol. 30(4), pages 275-286, August.
- Ou, Jihong & Jiang, Jiong, 1997. "Yield comparison of push and pull control methods on production systems with unreliable machines," International Journal of Production Economics, Elsevier, vol. 50(1), pages 1-12, May.
- Libralesso, Luc & Focke, Pablo Andres & Secardin, Aurélien & Jost, Vincent, 2022. "Iterative beam search algorithms for the permutation flowshop," European Journal of Operational Research, Elsevier, vol. 301(1), pages 217-234.
- Allahverdi, Ali & Soroush, H.M., 2008. "The significance of reducing setup times/setup costs," European Journal of Operational Research, Elsevier, vol. 187(3), pages 978-984, June.
- Paul M. Swamidass & Satish S. Nair & Sanjay I. Mistry, 1999. "The Use of a Neural Factory to Investigate the Effect of Product Line Width on Manufacturing Performance," Management Science, INFORMS, vol. 45(11), pages 1524-1538, November.
- repec:dgr:rugsom:02a42 is not listed on IDEAS
- Shen, Liji & Dauzère-Pérès, Stéphane & Neufeld, Janis S., 2018. "Solving the flexible job shop scheduling problem with sequence-dependent setup times," European Journal of Operational Research, Elsevier, vol. 265(2), pages 503-516.
- Sarac, Aysegul & Absi, Nabil & Dauzère-Pérès, Stéphane, 2010. "A literature review on the impact of RFID technologies on supply chain management," International Journal of Production Economics, Elsevier, vol. 128(1), pages 77-95, November.
- Craighead, Christopher W. & Patterson, J. Wayne & Fredendall, Lawrence D., 2001. "Protective capacity positioning: Impact on manufacturing cell performance," European Journal of Operational Research, Elsevier, vol. 134(2), pages 425-438, October.
- Hong, Jae-Dong & Kim, Seung-Lae & Hayya, Jack C., 1996. "Dynamic setup reduction in production lot sizing with nonconstant deterministic demand," European Journal of Operational Research, Elsevier, vol. 90(1), pages 182-196, April.
- Wright, CM & Mehrez, A, 1998. "An Overview of Representative Research of the Relationships Between Quality and Inventory," Omega, Elsevier, vol. 26(1), pages 29-47, February.
- Fleisch, Elgar & Tellkamp, Christian, 2005. "Inventory inaccuracy and supply chain performance: a simulation study of a retail supply chain," International Journal of Production Economics, Elsevier, vol. 95(3), pages 373-385, March.
- Yucesan, Enver & de Groote, Xavier, 2000. "Lead times, order release mechanisms, and customer service," European Journal of Operational Research, Elsevier, vol. 120(1), pages 118-130, January.
- Jacobs, F. Robert & Bendoly, Elliot, 2003. "Enterprise resource planning: Developments and directions for operations management research," European Journal of Operational Research, Elsevier, vol. 146(2), pages 233-240, April.
- Cannon, Alan R., 2008. "Inventory improvement and financial performance," International Journal of Production Economics, Elsevier, vol. 115(2), pages 581-593, October.
- Ishii, Kazuyoshi & Imori, Shigeki, 1996. "A production ordering system for two-item, two-stage, capacity-constraint production and inventory model," International Journal of Production Economics, Elsevier, vol. 44(1-2), pages 119-128, June.
- Ahmadi, Reza H. & Matsuo, Hirofumi, 2000. "A mini-line approach for pull production," European Journal of Operational Research, Elsevier, vol. 125(2), pages 340-358, September.
- Allahverdi, Ali & Gupta, Jatinder N. D. & Aldowaisan, Tariq, 1999. "A review of scheduling research involving setup considerations," Omega, Elsevier, vol. 27(2), pages 219-239, April.
- Hirakawa, Yasuhiro, 1996. "Performance of a multistage hybrid push/pull production control system," International Journal of Production Economics, Elsevier, vol. 44(1-2), pages 129-135, June.