Production and lead time quotation under imperfect shop floor information
Author
Abstract
Suggested Citation
DOI: 10.1016/j.ijpe.2013.03.010
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Izak Duenyas & Wallace J. Hopp, 1995. "Quoting Customer Lead Times," Management Science, INFORMS, vol. 41(1), pages 43-57, January.
- Özalp Özer & Wei Wei, 2004. "Inventory Control with Limited Capacity and Advance Demand Information," Operations Research, INFORMS, vol. 52(6), pages 988-1000, December.
- Sheppard, George M. & Brown, Karen A., 1993. "Predicting inventory record-keeping errors with discriminant analysis: A field experiment," International Journal of Production Economics, Elsevier, vol. 32(1), pages 39-51, August.
- Dellaert, Nico P., 1991. "Due-date setting and production control," International Journal of Production Economics, Elsevier, vol. 23(1-3), pages 59-67, October.
- Zhang, Juliang & Shou, Biying & Chen, Jian, 2013. "Postponed product differentiation with demand information update," International Journal of Production Economics, Elsevier, vol. 141(2), pages 529-540.
- Yacine Rekik, 2011. "Inventory inaccuracies in the wholesale supply chain," Post-Print hal-02312498, HAL.
- Lode Li, 1992. "The Role of Inventory in Delivery-Time Competition," Management Science, INFORMS, vol. 38(2), pages 182-197, February.
- Bendre, Abhijit Bhagwan & Nielsen, Lars Relund, 2013. "Inventory control in a lost-sales setting with information about supply lead times," International Journal of Production Economics, Elsevier, vol. 142(2), pages 324-331.
- Kaminsky, Philip & Kaya, Onur, 2008. "Inventory positioning, scheduling and lead-time quotation in supply chains," International Journal of Production Economics, Elsevier, vol. 114(1), pages 276-293, July.
- Nicole DeHoratius & Ananth Raman, 2008. "Inventory Record Inaccuracy: An Empirical Analysis," Management Science, INFORMS, vol. 54(4), pages 627-641, April.
- Hau L. Lee & V. Padmanabhan & Seungjin Whang, 1997. "Information Distortion in a Supply Chain: The Bullwhip Effect," Management Science, INFORMS, vol. 43(4), pages 546-558, April.
- Fleisch, Elgar & Tellkamp, Christian, 2005. "Inventory inaccuracy and supply chain performance: a simulation study of a retail supply chain," International Journal of Production Economics, Elsevier, vol. 95(3), pages 373-385, March.
- Fangruo Chen & Bin Yu, 2005. "Quantifying the Value of Leadtime Information in a Single-Location Inventory System," Manufacturing & Service Operations Management, INFORMS, vol. 7(2), pages 144-151, December.
- Minhui Liu & Mandyam Srinivasan & Nana Vepkhvadze, 2009. "What is the value of real-time shipment tracking information?," IISE Transactions, Taylor & Francis Journals, vol. 41(12), pages 1019-1034.
- S. Rajagopalan, 2002. "Make to Order or Make to Stock: Model and Application," Management Science, INFORMS, vol. 48(2), pages 241-256, February.
- Tan, Tarkan & Güllü, Refik & Erkip, Nesim, 2009. "Using imperfect advance demand information in ordering and rationing decisions," International Journal of Production Economics, Elsevier, vol. 121(2), pages 665-677, October.
- A. Gürhan Kök & Kevin H. Shang, 2007. "Inspection and Replenishment Policies for Systems with Inventory Record Inaccuracy," Manufacturing & Service Operations Management, INFORMS, vol. 9(2), pages 185-205, February.
- Lee J. Krajewski & Barry E. King & Larry P. Ritzman & Danny S. Wong, 1987. "Kanban, MRP, and Shaping the Manufacturing Environment," Management Science, INFORMS, vol. 33(1), pages 39-57, January.
- Roman Kapuscinski & Sridhar Tayur, 2007. "Reliable Due-Date Setting in a Capacitated MTO System with Two Customer Classes," Operations Research, INFORMS, vol. 55(1), pages 56-74, February.
- Gel, Esma S. & Erkip, Nesim & Thulaseedas, Anoop, 2010. "Analysis of simple inventory control systems with execution errors: Economic impact under correction opportunities," International Journal of Production Economics, Elsevier, vol. 125(1), pages 153-166, May.
- Rekik, Yacine, 2011. "Inventory inaccuracies in the wholesale supply chain," International Journal of Production Economics, Elsevier, vol. 133(1), pages 172-181, September.
- Srinagesh Gavirneni & Roman Kapuscinski & Sridhar Tayur, 1999. "Value of Information in Capacitated Supply Chains," Management Science, INFORMS, vol. 45(1), pages 16-24, January.
- Pinar Keskinocak & R. Ravi & Sridhar Tayur, 2001. "Scheduling and Reliable Lead-Time Quotation for Orders with Availability Intervals and Lead-Time Sensitive Revenues," Management Science, INFORMS, vol. 47(2), pages 264-279, February.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Wu, Zhengping & Zhai, Xin & Liu, Zhongyi, 2015. "The inventory billboard effect on the lead-time decision," International Journal of Production Economics, Elsevier, vol. 170(PA), pages 45-53.
- Bryan, Nana & Srinivasan, Mandyam M., 2014. "Real-time order tracking for supply systems with multiple transportation stages," European Journal of Operational Research, Elsevier, vol. 236(2), pages 548-560.
- Tanja Mlinar & Philippe Chevalier, 2016.
"Pooling heterogeneous products for manufacturing environments,"
4OR, Springer, vol. 14(2), pages 173-200, June.
- MLINAR, Tanja & CHEVALIER, Philippe, 2016. "Pooling Heterogeneous Products for Manufacturing Environments," LIDAM Reprints CORE 2744, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
- Nelson Duarte, 2018. "Systemy informatyczne w przemyśle: perspektywa dostawcy," Collegium of Economic Analysis Annals, Warsaw School of Economics, Collegium of Economic Analysis, issue 49, pages 465-476.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Cannella, Salvatore & Dominguez, Roberto & Framinan, Jose M., 2017. "Inventory record inaccuracy – The impact of structural complexity and lead time variability," Omega, Elsevier, vol. 68(C), pages 123-138.
- Seçil Savaşaneril & Paul M. Griffin & Pınar Keskinocak, 2010. "Dynamic Lead-Time Quotation for an M/M/1 Base-Stock Inventory Queue," Operations Research, INFORMS, vol. 58(2), pages 383-395, April.
- Gökçe Kahveciog̃lu & Barış Balcıog̃lu, 2016. "Coping with production time variability via dynamic lead-time quotation," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 38(4), pages 877-898, October.
- Cannella, Salvatore & Framinan, Jose M. & Bruccoleri, Manfredi & Barbosa-Póvoa, Ana Paula & Relvas, Susana, 2015. "The effect of Inventory Record Inaccuracy in Information Exchange Supply Chains," European Journal of Operational Research, Elsevier, vol. 243(1), pages 120-129.
- Wang, Fuqiang & Fang, Xiaoping & Chen, Xiaohong & Li, Xihua, 2016. "Impact of inventory inaccuracies on products with inventory-dependent demand," International Journal of Production Economics, Elsevier, vol. 177(C), pages 118-130.
- Xu, Jinpeng & Jiang, Wei & Feng, Gengzhong & Tian, Jun, 2012. "Comparing improvement strategies for inventory inaccuracy in a two-echelon supply chain," European Journal of Operational Research, Elsevier, vol. 221(1), pages 213-221.
- Kök, A. Gürhan & Shang, Kevin H., 2014. "Evaluation of cycle-count policies for supply chains with inventory inaccuracy and implications on RFID investments," European Journal of Operational Research, Elsevier, vol. 237(1), pages 91-105.
- Feng Tao & Tijun Fan & Kin Keung Lai & Lin Li, 2017. "Impact of RFID technology on inventory control policy," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 68(2), pages 207-220, February.
- Sarac, Aysegul & Absi, Nabil & Dauzère-Pérès, Stéphane, 2010. "A literature review on the impact of RFID technologies on supply chain management," International Journal of Production Economics, Elsevier, vol. 128(1), pages 77-95, November.
- Shabani, Amir & Maroti, Gabor & de Leeuw, Sander & Dullaert, Wout, 2021. "Inventory record inaccuracy and store-level performance," International Journal of Production Economics, Elsevier, vol. 235(C).
- Dai, Hongyan & Li, Jianbin & Yan, Nina & Zhou, Weihua, 2016. "Bullwhip effect and supply chain costs with low- and high-quality information on inventory shrinkage," European Journal of Operational Research, Elsevier, vol. 250(2), pages 457-469.
- Sari, Kazim, 2010. "Exploring the impacts of radio frequency identification (RFID) technology on supply chain performance," European Journal of Operational Research, Elsevier, vol. 207(1), pages 174-183, November.
- Li, Ming & Wang, Zheng & Chan, Felix T.S., 2016. "A robust inventory routing policy under inventory inaccuracy and replenishment lead-time," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 91(C), pages 290-305.
- Fan, Tijun & Tao, Feng & Deng, Sheng & Li, Shuxia, 2015. "Impact of RFID technology on supply chain decisions with inventory inaccuracies," International Journal of Production Economics, Elsevier, vol. 159(C), pages 117-125.
- Ahmed Musa & Al-Amin Abba Dabo, 2016. "A Review of RFID in Supply Chain Management: 2000–2015," Global Journal of Flexible Systems Management, Springer;Global Institute of Flexible Systems Management, vol. 17(2), pages 189-228, June.
- Secil Savasaneril & Ece Sayin, 2017. "Dynamic lead time quotation under responsive inventory and multiple customer classes," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 39(1), pages 95-135, January.
- Slotnick, Susan A. & Sobel, Matthew J., 2005. "Manufacturing lead-time rules: Customer retention versus tardiness costs," European Journal of Operational Research, Elsevier, vol. 163(3), pages 825-856, June.
- Y. Boulaksil & J. C. Fransoo & T. Tan, 2017. "Capacity reservation and utilization for a manufacturer with uncertain capacity and demand," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 39(3), pages 689-709, July.
- Thiesse, Frédéric & Buckel, Thomas, 2015. "A comparison of RFID-based shelf replenishment policies in retail stores under suboptimal read rates," International Journal of Production Economics, Elsevier, vol. 159(C), pages 126-136.
- Tanja Mlinar & Philippe Chevalier, 2016.
"Pooling heterogeneous products for manufacturing environments,"
4OR, Springer, vol. 14(2), pages 173-200, June.
- MLINAR, Tanja & CHEVALIER, Philippe, 2016. "Pooling Heterogeneous Products for Manufacturing Environments," LIDAM Reprints CORE 2744, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
More about this item
Keywords
Value of information; Production control; Lead time quotation; Policies under imperfect information; Partially observable Markov decision process;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:144:y:2013:i:2:p:422-431. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.