IDEAS home Printed from https://ideas.repec.org/r/inm/ormnsc/v30y1984i2p222-239.html
   My bibliography  Save this item

Computationally Efficient Optimal Solutions to the Lot-Sizing Problem in Multistage Assembly Systems

Citations

Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
as


Cited by:

  1. Sereshti, Narges & Adulyasak, Yossiri & Jans, Raf, 2024. "Managing flexibility in stochastic multi-level lot sizing problem with service level constraints," Omega, Elsevier, vol. 122(C).
  2. Larry J. Leblanc, 1987. "Optimization methods for large‐scale multiechelon stockage problems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 34(2), pages 239-249, April.
  3. Dellaert, N. & Jeunet, J. & Jonard, N., 2000. "A genetic algorithm to solve the general multi-level lot-sizing problem with time-varying costs," International Journal of Production Economics, Elsevier, vol. 68(3), pages 241-257, December.
  4. Chu, Chi-Leung & Leon, V. Jorge, 2009. "Scalable methodology for supply chain inventory coordination with private information," European Journal of Operational Research, Elsevier, vol. 195(1), pages 262-279, May.
  5. N.C. Simpson & S. Selcuk Erenguc, 2005. "Modeling multiple stage manufacturing systems with generalized costs and capacity issues," Naval Research Logistics (NRL), John Wiley & Sons, vol. 52(6), pages 560-570, September.
  6. Erenguc, S. Selcuk & Simpson, N. C. & Vakharia, Asoo J., 1999. "Integrated production/distribution planning in supply chains: An invited review," European Journal of Operational Research, Elsevier, vol. 115(2), pages 219-236, June.
  7. Escudero, L. F. & Galindo, E. & Garcia, G. & Gomez, E. & Sabau, V., 1999. "Schumann, a modeling framework for supply chain management under uncertainty," European Journal of Operational Research, Elsevier, vol. 119(1), pages 14-34, November.
  8. Alf Kimms, 1998. "Ablauforganisation bei Serienproduktion in Fließfertigungssystemen," Schmalenbach Journal of Business Research, Springer, vol. 50(7), pages 641-655, July.
  9. dos Santos-Meza, Elisangela & Oliveira dos Santos, Maristela & Nereu Arenales, Marcos, 2002. "A lot-sizing problem in an automated foundry," European Journal of Operational Research, Elsevier, vol. 139(3), pages 490-500, June.
  10. Kimms, Alf, 1997. "Ablauforganisation bei Serienproduktion in Fließfertigungssystemen," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 431, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
  11. Anantaram Balakrishnan & Joseph Geunes, 2000. "Requirements Planning with Substitutions: Exploiting Bill-of-Materials Flexibility in Production Planning," Manufacturing & Service Operations Management, INFORMS, vol. 2(2), pages 166-185, January.
  12. Grubbström, Robert W. & Tang, Ou, 2012. "The space of solution alternatives in the optimal lotsizing problem for general assembly systems applying MRP theory," International Journal of Production Economics, Elsevier, vol. 140(2), pages 765-777.
  13. Sazvar, Z. & Mirzapour Al-e-hashem, S.M.J. & Govindan, K. & Bahli, B., 2016. "A novel mathematical model for a multi-period, multi-product optimal ordering problem considering expiry dates in a FEFO system," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 93(C), pages 232-261.
  14. Joseph Geunes & H. Edwin Romeijn & Kevin Taaffe, 2006. "Requirements Planning with Pricing and Order Selection Flexibility," Operations Research, INFORMS, vol. 54(2), pages 394-401, April.
  15. Lee, S. D. & Rung, J. M., 2000. "Production lot sizing in failure prone two-stage serial systems," European Journal of Operational Research, Elsevier, vol. 123(1), pages 42-60, May.
  16. Simpson, N. C., 1999. "Multiple level production planning in rolling horizon assembly environments," European Journal of Operational Research, Elsevier, vol. 114(1), pages 15-28, April.
  17. Voros, Jozsef, 1995. "Setup cost stability region for the multi-level dynamic lot sizing problem," European Journal of Operational Research, Elsevier, vol. 87(1), pages 132-141, November.
  18. Xiao, Yiyong & Kaku, Ikou & Zhao, Qiuhong & Zhang, Renqian, 2011. "A reduced variable neighborhood search algorithm for uncapacitated multilevel lot-sizing problems," European Journal of Operational Research, Elsevier, vol. 214(2), pages 223-231, October.
  19. A. Kimms, 1997. "Demand shuffle—A method for multilevel proportional lot sizing and scheduling," Naval Research Logistics (NRL), John Wiley & Sons, vol. 44(4), pages 319-340, June.
  20. Dellaert, N. P. & Jeunet, J., 2003. "Randomized multi-level lot-sizing heuristics for general product structures," European Journal of Operational Research, Elsevier, vol. 148(1), pages 211-228, July.
  21. Kimms, Alf & Drexl, Andreas, 1996. "Multi-level lot sizing: A literature survey," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 405, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
  22. Degraeve, Z. & Jans, R.F., 2003. "A New Dantzig-Wolfe Reformulation And Branch-And-Price Algorithm For The Capacitated Lot Sizing Problem With Set Up Times," ERIM Report Series Research in Management ERS-2003-010-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
  23. Xiao, Yiyong & Zhang, Renqian & Zhao, Qiuhong & Kaku, Ikou & Xu, Yuchun, 2014. "A variable neighborhood search with an effective local search for uncapacitated multilevel lot-sizing problems," European Journal of Operational Research, Elsevier, vol. 235(1), pages 102-114.
  24. Kimms, Alf, 1998. "Short-term management of lot production," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 480, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
  25. Ralph D. Badinelli & Leroy B. Schwarz, 1988. "Backorders optimization in a one‐warehouse N‐identical retailer distribution system," Naval Research Logistics (NRL), John Wiley & Sons, vol. 35(5), pages 427-440, October.
  26. Sunil Chopra & M.R. Rao & Chih‐Yang Tsai, 1997. "Computational study of the multiechelon production planning problem," Naval Research Logistics (NRL), John Wiley & Sons, vol. 44(1), pages 1-19, February.
  27. Tobias Harks & Felix G. König & Jannik Matuschke & Alexander T. Richter & Jens Schulz, 2016. "An Integrated Approach to Tactical Transportation Planning in Logistics Networks," Transportation Science, INFORMS, vol. 50(2), pages 439-460, May.
  28. Jörg Homberger, 2008. "A Parallel Genetic Algorithm for the Multilevel Unconstrained Lot-Sizing Problem," INFORMS Journal on Computing, INFORMS, vol. 20(1), pages 124-132, February.
  29. Jans, Raf & Degraeve, Zeger, 2007. "Meta-heuristics for dynamic lot sizing: A review and comparison of solution approaches," European Journal of Operational Research, Elsevier, vol. 177(3), pages 1855-1875, March.
IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.