The discrete lot-sizing and scheduling problem with sequence-dependent setup costs

Citations

Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
as


Cited by:

  1. Drexl, Andreas & Haase, Knut, 1997. "Vorbeugende Instandhaltung und Eilaufträge in der Produktionsplanung," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 450, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
  2. Laurence A. Wolsey, 2002. "Solving Multi-Item Lot-Sizing Problems with an MIP Solver Using Classification and Reformulation," Management Science, INFORMS, vol. 48(12), pages 1587-1602, December.
  3. Drexl, Andreas & Kimms, Alf, 1996. "Lot sizing and scheduling: Survey and extensions," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 421, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
  4. Jing Wu & Dan Zhang & Yang Yang & Gongshu Wang & Lijie Su, 2022. "Multi-Stage Multi-Product Production and Inventory Planning for Cold Rolling under Random Yield," Mathematics, MDPI, vol. 10(4), pages 1-21, February.
  5. Kimms, A, 1998. "Stability Measures for Rolling Schedules with Applications to Capacity Expansion Planning, Master Production Scheduling, and Lot Sizing," Omega, Elsevier, vol. 26(3), pages 355-366, June.
  6. A.C. Mahasinghe & L.A. Sarathchandra, 2020. "An Optimization Model for Production Planning in the Synthetic Fertilizer Industry," Advances in Decision Sciences, Asia University, Taiwan, vol. 24(3), pages 28-62, September.
  7. Drexl, Andreas & Haase, Knut, 1995. "Proportional lotsizing and scheduling," International Journal of Production Economics, Elsevier, vol. 40(1), pages 73-87, June.
  8. Karina Copil & Martin Wörbelauer & Herbert Meyr & Horst Tempelmeier, 2017. "Simultaneous lotsizing and scheduling problems: a classification and review of models," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 39(1), pages 1-64, January.
  9. Meyr, Herbert, 2002. "Simultaneous lotsizing and scheduling on parallel machines," European Journal of Operational Research, Elsevier, vol. 139(2), pages 277-292, June.
  10. BELVAUX, Gaetan & WOLSEY, Laurence A., 2000. "Modelling practical lot-sizing problems as mixed integer programs," LIDAM Discussion Papers CORE 2000009, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
  11. A.C. Mahasinghe & L.A. Sarathchandra, 2020. "An Optimization Model for Production Planning in the Synthetic Fertilizer Industry," International Association of Decision Sciences, Asia University, Taiwan, vol. 24(3), pages 28-62, September.
  12. Lee, Younsoo & Lee, Kyungsik, 2020. "Lot-sizing and scheduling in flat-panel display manufacturing process," Omega, Elsevier, vol. 93(C).
  13. Haase, Knut, 1994. "Capacitated lot-sizing with sequence dependent setup costs," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 340, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
  14. Rohaninejad, Mohammad & Hanzálek, Zdeněk, 2023. "Multi-level lot-sizing and job shop scheduling with lot-streaming: Reformulation and solution approaches," International Journal of Production Economics, Elsevier, vol. 263(C).
  15. Haase, Knut & Göpfert, Lars, 1995. "Engpaßorientierte Fertigungssteuerung bei reihenfolgeabhängigen Rüstvorgängen in einem Unternehmen der Satz- und Drucktechnik," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 373, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
  16. Bouchriha, Hanen & Ouhimmou, Mustapha & D'Amours, Sophie, 2007. "Lot sizing problem on a paper machine under a cyclic production approach," International Journal of Production Economics, Elsevier, vol. 105(2), pages 318-328, February.
  17. Kimms, Alf, 1996. "Parameter controlled instance generation for lot sizing problems," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 412, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
  18. Li, Hui & Liu, Liming, 2006. "Production control in a two-stage system," European Journal of Operational Research, Elsevier, vol. 174(2), pages 887-904, October.
  19. BELVAUX, Gaetan & WOLSEY, Laurence A., 1998. "Lot-sizing problems: modelling issues and a specialized branch-and-cut system BC-PROD," LIDAM Discussion Papers CORE 1998049, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
  20. Tian, Xiaoyu & Zhang, Zhi-Hai, 2019. "Capacitated disassembly scheduling and pricing of returned products with price-dependent yield," Omega, Elsevier, vol. 84(C), pages 160-174.
  21. Jans, R.F. & Degraeve, Z., 2005. "Modeling Industrial Lot Sizing Problems: A Review," ERIM Report Series Research in Management ERS-2005-049-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
  22. Drexl, A. & Kimms, A., 1997. "Lot sizing and scheduling -- Survey and extensions," European Journal of Operational Research, Elsevier, vol. 99(2), pages 221-235, June.
  23. Józefowska, J. & Zimniak, A., 2008. "Optimization tool for short-term production planning and scheduling," International Journal of Production Economics, Elsevier, vol. 112(1), pages 109-120, March.
  24. Schirmer, Andreas, 1996. "New insights on the complexity of resource-constrained project scheduling: Two cases of multi-mode scheduling," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 391, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
  25. Jordan, Carsten, 1995. "A two-phase genetic algorithm to solve variants of the batch sequencing problem," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 363, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
  26. Drexl, Andreas & Jordan, Carsten & Kimms, Alf, 1997. "Gruppierungs- und Reihenfolgeprobleme in der Fertigung," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 447, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
  27. Guimarães, Luis & Klabjan, Diego & Almada-Lobo, Bernardo, 2014. "Modeling lotsizing and scheduling problems with sequence dependent setups," European Journal of Operational Research, Elsevier, vol. 239(3), pages 644-662.
  28. Andrew J. Miller & Laurence A. Wolsey, 2003. "Tight Mip Formulation for Multi-Item Discrete Lot-Sizing Problems," Operations Research, INFORMS, vol. 51(4), pages 557-565, August.
  29. Salomon, Marc & Solomon, Marius M. & Van Wassenhove, Luk N. & Dumas, Yvan & Dauzere-Peres, Stephane, 1997. "Solving the discrete lotsizing and scheduling problem with sequence dependent set-up costs and set-up times using the Travelling Salesman Problem with time windows," European Journal of Operational Research, Elsevier, vol. 100(3), pages 494-513, August.
  30. Gaetan Belvaux & Laurence A. Wolsey, 2001. "Modelling Practical Lot-Sizing Problems as Mixed-Integer Programs," Management Science, INFORMS, vol. 47(7), pages 993-1007, July.
  31. Gaetan Belvaux & Laurence A. Wolsey, 2000. "bc --- prod: A Specialized Branch-and-Cut System for Lot-Sizing Problems," Management Science, INFORMS, vol. 46(5), pages 724-738, May.
  32. Jans, Raf & Degraeve, Zeger, 2007. "Meta-heuristics for dynamic lot sizing: A review and comparison of solution approaches," European Journal of Operational Research, Elsevier, vol. 177(3), pages 1855-1875, March.
  33. Kimms, Alf, 1996. "Stability measures for rolling schedules with applications to capacity expansion planning, master production scheduling, and lot sizing," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 418, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
  34. Meyr, H., 2000. "Simultaneous lotsizing and scheduling by combining local search with dual reoptimization," European Journal of Operational Research, Elsevier, vol. 120(2), pages 311-326, January.
  35. Wei, Wenchao & Guimarães, Luis & Amorim, Pedro & Almada-Lobo, Bernardo, 2017. "Tactical production and distribution planning with dependency issues on the production process," Omega, Elsevier, vol. 67(C), pages 99-114.
  36. Carsten Jordan & Andreas Drexl, 1998. "Discrete Lotsizing and Scheduling by Batch Sequencing," Management Science, INFORMS, vol. 44(5), pages 698-713, May.
  37. Jordan, Carsten & Drexl, Andreas, 1997. "Discrete lotsizing and scheduling by batch sequencing," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 438, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
  38. Sungmin Kang & Kavindra Malik & L. Joseph Thomas, 1999. "Lotsizing and Scheduling on Parallel Machines with Sequence-Dependent Setup Costs," Management Science, INFORMS, vol. 45(2), pages 273-289, February.
  39. Mathieu Van Vyve, 2007. "Algorithms for Single-Item Lot-Sizing Problems with Constant Batch Size," Mathematics of Operations Research, INFORMS, vol. 32(3), pages 594-613, August.
  40. Haase, Knut & Kimms, Alf, 2000. "Lot sizing and scheduling with sequence-dependent setup costs and times and efficient rescheduling opportunities," International Journal of Production Economics, Elsevier, vol. 66(2), pages 159-169, June.
  41. Bruggemann, Wolfgang & Jahnke, Hermann, 2000. "The discrete lot-sizing and scheduling problem: Complexity and modification for batch availability," European Journal of Operational Research, Elsevier, vol. 124(3), pages 511-528, August.
IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.