My bibliography
Save this item
Multi-product economic lot scheduling problem with separate production lines for manufacturing and remanufacturing
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Ferrer, Geraldo & Swaminathan, Jayashankar M., 2010. "Managing new and differentiated remanufactured products," European Journal of Operational Research, Elsevier, vol. 203(2), pages 370-379, June.
- Wang, Gang & Gunasekaran, Angappa, 2017. "Operations scheduling in reverse supply chains: Identical demand and delivery deadlines," International Journal of Production Economics, Elsevier, vol. 183(PB), pages 375-381.
- Chan, Chi Kin & Man, Nora & Fang, Fei & Campbell, J.F., 2020. "Supply chain coordination with reverse logistics: A vendor/recycler-buyer synchronized cycles model," Omega, Elsevier, vol. 95(C).
- Yi-Kuei Lin & Ping-Chen Chang, 2015. "A novel model for a manufacturing system with joint production lines in terms of prior-set," International Journal of Systems Science, Taylor & Francis Journals, vol. 46(2), pages 340-354, January.
- Kilic, Onur A. & Tunc, Huseyin, 2019. "Heuristics for the stochastic economic lot sizing problem with remanufacturing under backordering costs," European Journal of Operational Research, Elsevier, vol. 276(3), pages 880-892.
- Xianpei Hong & Xinlu Cao & Yeming Gong & Wanying (amanda) Chen, 2021. "Quality information acquisition and disclosure with green manufacturing in a closed-loop supply chain," Post-Print hal-03188234, HAL.
- Timo Hilger & Florian Sahling & Horst Tempelmeier, 2016. "Capacitated dynamic production and remanufacturing planning under demand and return uncertainty," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 38(4), pages 849-876, October.
- Fadeyi, Johnson Adebayo & Monplaisir, Leslie, 2022. "Instilling lifecycle costs into modular product development for improved remanufacturing-product service system enterprise," International Journal of Production Economics, Elsevier, vol. 246(C).
- Govindan, Kannan & Soleimani, Hamed & Kannan, Devika, 2015. "Reverse logistics and closed-loop supply chain: A comprehensive review to explore the future," European Journal of Operational Research, Elsevier, vol. 240(3), pages 603-626.
- Rahman, Shams & Subramanian, Nachiappan, 2012. "Factors for implementing end-of-life computer recycling operations in reverse supply chains," International Journal of Production Economics, Elsevier, vol. 140(1), pages 239-248.
- Tsiliyannis, Christos Aristeides, 2018. "Markov chain modeling and forecasting of product returns in remanufacturing based on stock mean-age," European Journal of Operational Research, Elsevier, vol. 271(2), pages 474-489.
- Sabbaghi, Mostafa & Behdad, Sara & Zhuang, Jun, 2016. "Managing consumer behavior toward on-time return of the waste electrical and electronic equipment: A game theoretic approach," International Journal of Production Economics, Elsevier, vol. 182(C), pages 545-563.
- S. Malolan & M. Mathirajan & M. K. Tiwari, 2020. "A methodology for determining the optimal reverse flow capacities and the breakeven period for a multi products-component remanufacturing problem of an OEM," Operations Management Research, Springer, vol. 13(3), pages 233-248, December.
- Sifaleras, Angelo & Konstantaras, Ioannis & Mladenović, Nenad, 2015. "Variable neighborhood search for the economic lot sizing problem with product returns and recovery," International Journal of Production Economics, Elsevier, vol. 160(C), pages 133-143.
- Andreas Goerler & Stefan Voß, 2016. "Dynamic lot-sizing with rework of defective items and minimum lot-size constraints," International Journal of Production Research, Taylor & Francis Journals, vol. 54(8), pages 2284-2297, April.
- Hong, Xianpei & Cao, Xinlu & Gong, Yeming & Chen, Wanying, 2021. "Quality information acquisition and disclosure with green manufacturing in a closed-loop supply chain," International Journal of Production Economics, Elsevier, vol. 232(C).
- Malolan Sundararaman & Mathirajan Muthu, 2020. "Component remanufacturing: a new prospective profitable business approach for the Indian automobile sector," OPSEARCH, Springer;Operational Research Society of India, vol. 57(4), pages 1244-1280, December.
- Hao, Zhifeng & Yeh, Wei-Chang & Tan, Shi-Yi, 2021. "One-batch preempt deterioration-effect multi-state multi-rework network reliability problem and algorithms," Reliability Engineering and System Safety, Elsevier, vol. 215(C).
- Kaya, Onur, 2010. "Incentive and production decisions for remanufacturing operations," European Journal of Operational Research, Elsevier, vol. 201(2), pages 442-453, March.
- Gribkovskaia, Irina V. & Kovalev, Sergey & Werner, Frank, 2010. "Batching for work and rework processes on dedicated facilities to minimize the makespan," Omega, Elsevier, vol. 38(6), pages 522-527, December.
- Hao, Zhifeng & Yeh, Wei-Chang & Liu, Zhenyao & Forghani-elahabad, Majid, 2020. "General multi-state rework network and reliability algorithm," Reliability Engineering and System Safety, Elsevier, vol. 203(C).
- Assid, M. & Gharbi, A. & Hajji, A., 2020. "Production control of failure-prone manufacturing-remanufacturing systems using mixed dedicated and shared facilities," International Journal of Production Economics, Elsevier, vol. 224(C).
- Felix T.S. Chan & Nan Li & S.H. Chung & Mozafar Saadat, 2017. "Management of sustainable manufacturing systems-a review on mathematical problems," International Journal of Production Research, Taylor & Francis Journals, vol. 55(4), pages 1210-1225, February.
- Liu, Baolong & Papier, Felix, 2022. "Remanufacturing of multi-component systems with product substitution," European Journal of Operational Research, Elsevier, vol. 301(3), pages 896-911.
- Lin, Yi-Kuei & Chang, Ping-Chen, 2012. "Evaluate the system reliability for a manufacturing network with reworking actions," Reliability Engineering and System Safety, Elsevier, vol. 106(C), pages 127-137.
- Kyung Sung Jung & Milind Dawande & H. Neil Geismar & V. Daniel R. Guide & Chelliah Sriskandarajah, 2016. "Supply planning models for a remanufacturer under just-in-time manufacturing environment with reverse logistics," Annals of Operations Research, Springer, vol. 240(2), pages 533-581, May.