Operations scheduling in reverse supply chains: Identical demand and delivery deadlines
Author
Abstract
Suggested Citation
DOI: 10.1016/j.ijpe.2016.08.010
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Niknejad, A. & Petrovic, D., 2014. "Optimisation of integrated reverse logistics networks with different product recovery routes," European Journal of Operational Research, Elsevier, vol. 238(1), pages 143-154.
- Guide, V. Daniel R. & Kraus, Mark E. & Srivastava, Rajesh, 1997. "Scheduling policies for remanufacturing," International Journal of Production Economics, Elsevier, vol. 48(2), pages 187-204, January.
- Teunter, Ruud & Kaparis, Konstantinos & Tang, Ou, 2008. "Multi-product economic lot scheduling problem with separate production lines for manufacturing and remanufacturing," European Journal of Operational Research, Elsevier, vol. 191(3), pages 1241-1253, December.
- Teunter, Ruud & Tang, Ou & Kaparis, Konstantinos, 2009. "Heuristics for the economic lot scheduling problem with returns," International Journal of Production Economics, Elsevier, vol. 118(1), pages 323-330, March.
- Wang, Gang & Lei, Lei, 2012. "Polynomial-time solvable cases of the capacitated multi-echelon shipping network scheduling problem with delivery deadlines," International Journal of Production Economics, Elsevier, vol. 137(2), pages 263-271.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Amir Hosein Afshar Sedigh & Rasoul Haji & Seyed Mehdi Sajadifar, 2023. "The Cost Function of a Two-Level Inventory System with identical retailers benefitting from Information Sharing," Papers 2312.03898, arXiv.org.
- Chen, Ziyue & Huang, Lizhen, 2021. "Digital twins for information-sharing in remanufacturing supply chain: A review," Energy, Elsevier, vol. 220(C).
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Gribkovskaia, Irina V. & Kovalev, Sergey & Werner, Frank, 2010. "Batching for work and rework processes on dedicated facilities to minimize the makespan," Omega, Elsevier, vol. 38(6), pages 522-527, December.
- Sifaleras, Angelo & Konstantaras, Ioannis & Mladenović, Nenad, 2015. "Variable neighborhood search for the economic lot sizing problem with product returns and recovery," International Journal of Production Economics, Elsevier, vol. 160(C), pages 133-143.
- Andreas Goerler & Stefan Voß, 2016. "Dynamic lot-sizing with rework of defective items and minimum lot-size constraints," International Journal of Production Research, Taylor & Francis Journals, vol. 54(8), pages 2284-2297, April.
- Tsiliyannis, Christos Aristeides, 2018. "Markov chain modeling and forecasting of product returns in remanufacturing based on stock mean-age," European Journal of Operational Research, Elsevier, vol. 271(2), pages 474-489.
- S. Malolan & M. Mathirajan & M. K. Tiwari, 2020. "A methodology for determining the optimal reverse flow capacities and the breakeven period for a multi products-component remanufacturing problem of an OEM," Operations Management Research, Springer, vol. 13(3), pages 233-248, December.
- Rahman, Shams & Subramanian, Nachiappan, 2012. "Factors for implementing end-of-life computer recycling operations in reverse supply chains," International Journal of Production Economics, Elsevier, vol. 140(1), pages 239-248.
- Zhang, Abraham & Wang, Jason X. & Farooque, Muhammad & Wang, Yulan & Choi, Tsan-Ming, 2021. "Multi-dimensional circular supply chain management: A comparative review of the state-of-the-art practices and research," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 155(C).
- Fleischmann, Moritz & Bloemhof-Ruwaard, Jacqueline M. & Dekker, Rommert & van der Laan, Erwin & van Nunen, Jo A. E. E. & Van Wassenhove, Luk N., 1997. "Quantitative models for reverse logistics: A review," European Journal of Operational Research, Elsevier, vol. 103(1), pages 1-17, November.
- Wang, Gang, 2024. "Order assignment and two-stage integrated scheduling in fruit and vegetable supply chains," Omega, Elsevier, vol. 124(C).
- Nenes, George & Panagiotidou, Sofia & Dekker, Rommert, 2010. "Inventory control policies for inspection and remanufacturing of returns: A case study," International Journal of Production Economics, Elsevier, vol. 125(2), pages 300-312, June.
- Kyung Sung Jung & Milind Dawande & H. Neil Geismar & V. Daniel R. Guide & Chelliah Sriskandarajah, 2016. "Supply planning models for a remanufacturer under just-in-time manufacturing environment with reverse logistics," Annals of Operations Research, Springer, vol. 240(2), pages 533-581, May.
- Wenjie Wang & Guangdong Tian & Gang Yuan & Duc Truong Pham, 2023. "Energy-time tradeoffs for remanufacturing system scheduling using an invasive weed optimization algorithm," Journal of Intelligent Manufacturing, Springer, vol. 34(3), pages 1065-1083, March.
- Kristianto, Yohanes & Helo, Petri, 2014. "Product architecture modularity implications for operations economy of green supply chains," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 70(C), pages 128-145.
- Felix T.S. Chan & Nan Li & S.H. Chung & Mozafar Saadat, 2017. "Management of sustainable manufacturing systems-a review on mathematical problems," International Journal of Production Research, Taylor & Francis Journals, vol. 55(4), pages 1210-1225, February.
- Hong, Xianpei & Cao, Xinlu & Gong, Yeming & Chen, Wanying, 2021. "Quality information acquisition and disclosure with green manufacturing in a closed-loop supply chain," International Journal of Production Economics, Elsevier, vol. 232(C).
- Chen, Daqiang & Ignatius, Joshua & Sun, Danzhi & Zhan, Shalei & Zhou, Chenyu & Marra, Marianna & Demirbag, Mehmet, 2019. "Reverse logistics pricing strategy for a green supply chain: A view of customers' environmental awareness," International Journal of Production Economics, Elsevier, vol. 217(C), pages 197-210.
- Zhang, Yanzi & Berenguer, Gemma & Zhang, Zhi-Hai, 2024. "A subsidized reverse supply chain in the Chinese electronics industry," Omega, Elsevier, vol. 122(C).
- V. Daniel R. Guide & Vaidyanathan Jayaraman & Rajesh Srivastava & W. C. Benton, 2000. "Supply-Chain Management for Recoverable Manufacturing Systems," Interfaces, INFORMS, vol. 30(3), pages 125-142, June.
- Kristianto, Yohanes & Helo, Petri, 2015. "Reprint of “Product architecture modularity implications for operations economy of green supply chains”," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 74(C), pages 63-80.
- Kilic, Onur A. & Tunc, Huseyin, 2019. "Heuristics for the stochastic economic lot sizing problem with remanufacturing under backordering costs," European Journal of Operational Research, Elsevier, vol. 276(3), pages 880-892.
More about this item
Keywords
Reverse supply chains; Integrated operations scheduling; Delivery deadlines; Bi-criteria decision making; Mixed integer programming;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:183:y:2017:i:pb:p:375-381. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.