IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v191y2008i3p1241-1253.html
   My bibliography  Save this article

Multi-product economic lot scheduling problem with separate production lines for manufacturing and remanufacturing

Author

Listed:
  • Teunter, Ruud
  • Kaparis, Konstantinos
  • Tang, Ou

Abstract

We study the economic lot scheduling problem with two production sources, manufacturing and remanufacturing, for which operations are performed on separate, dedicated lines. We develop an exact algorithm for finding the optimal common-cycle-time policy. The algorithm combines a search for the optimal cycle time with a mixed integer programming (MIP) formulation of the problem given a fixed cycle time. Using case study data from an auto part producer, we perform a sensitivity study on the effects of key problem parameters such as demand rates and return fractions. Furthermore, by comparing to results in Tang and Teunter [Tang, O., Teunter, R.H., 2006. Economic lot scheduling problem with returns. Production and Operations Management] for the situation where all operations are performed on the same line, we analyze the cost benefits of using dedicated lines.

Suggested Citation

  • Teunter, Ruud & Kaparis, Konstantinos & Tang, Ou, 2008. "Multi-product economic lot scheduling problem with separate production lines for manufacturing and remanufacturing," European Journal of Operational Research, Elsevier, vol. 191(3), pages 1241-1253, December.
  • Handle: RePEc:eee:ejores:v:191:y:2008:i:3:p:1241-1253
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(07)00873-9
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Salah E. Elmaghraby, 1978. "The Economic Lot Scheduling Problem (ELSP): Review and Extensions," Management Science, INFORMS, vol. 24(6), pages 587-598, February.
    2. Ramesh Bollapragada & Uday Rao, 1999. "Single-Stage Resource Allocation and Economic Lot Scheduling on Multiple, Nonidentical Production Lines," Management Science, INFORMS, vol. 45(6), pages 889-904, June.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Nazrul Shaikh & Vittal Prabhu & Danilo Abril & David Sánchez & Jorge Arias & Esteban Rodríguez & Germán Riaño, 2011. "Kimberly-Clark Latin America Builds an Optimization-Based System for Machine Scheduling," Interfaces, INFORMS, vol. 41(5), pages 455-465, October.
    2. Pesenti, Raffaele & Ukovich, Walter, 2003. "Economic lot scheduling on multiple production lines with resource constraints," International Journal of Production Economics, Elsevier, vol. 81(1), pages 469-481, January.
    3. Ramesh Bollapragada & Uday Rao, 1999. "Single-Stage Resource Allocation and Economic Lot Scheduling on Multiple, Nonidentical Production Lines," Management Science, INFORMS, vol. 45(6), pages 889-904, June.
    4. Heuts, R.M.J. & Nederstigt, P. & Roebroek, W. & Selen, W.J., 1992. "Multi-product cycling with packaging in the process industry," Other publications TiSEM 533d6bbb-e61a-4e4b-a44e-1, Tilburg University, School of Economics and Management.
    5. Robert R. Inman & Philip C. Jones & Guillermo M. Gallego, 1991. "Economic lot scheduling of fully loaded processes with external setups," Naval Research Logistics (NRL), John Wiley & Sons, vol. 38(5), pages 699-713, October.
    6. Hein, Fanny & Almeder, Christian, 2016. "Quantitative insights into the integrated supply vehicle routing and production planning problem," International Journal of Production Economics, Elsevier, vol. 177(C), pages 66-76.
    7. Bautista, Joaquín & Alfaro, Rocío & Batalla, Cristina, 2015. "Modeling and solving the mixed-model sequencing problem to improve productivity," International Journal of Production Economics, Elsevier, vol. 161(C), pages 83-95.
    8. Coelho, Leandro C. & Laporte, Gilbert, 2014. "Improved solutions for inventory-routing problems through valid inequalities and input ordering," International Journal of Production Economics, Elsevier, vol. 155(C), pages 391-397.
    9. Heuts, R.M.J. & Nederstigt, P. & Roebroek, W. & Selen, W.J., 1992. "Multi-product cycling with packaging in the process industry," Research Memorandum FEW 544, Tilburg University, School of Economics and Management.
    10. Brander, Par & Forsberg, Rolf, 2006. "Determination of safety stocks for cyclic schedules with stochastic demands," International Journal of Production Economics, Elsevier, vol. 104(2), pages 271-295, December.
    11. Lopez de Haro, Santiago & Gershwin, Stanley B. & Rosenfield, Donald B., 2009. "Schedule evaluation in unstable manufacturing environments," International Journal of Production Economics, Elsevier, vol. 121(1), pages 183-194, September.
    12. Vaughan, Timothy S., 2007. "Cyclical schedules vs. dynamic sequencing: Replenishment dynamics and inventory efficiency," International Journal of Production Economics, Elsevier, vol. 107(2), pages 518-527, June.
    13. Guillermo Gallego & Robin Roundy, 1992. "The economic lot scheduling problem with finite backorder costs," Naval Research Logistics (NRL), John Wiley & Sons, vol. 39(5), pages 729-739, August.
    14. Brander, Par & Leven, Erik & Segerstedt, Anders, 2005. "Lot sizes in a capacity constrained facility--a simulation study of stationary stochastic demand," International Journal of Production Economics, Elsevier, vol. 93(1), pages 375-386, January.
    15. George Liberopoulos & Dimitrios Pandelis & Olympia Hatzikonstantinou, 2013. "The stochastic economic lot sizing problem for non-stop multi-grade production with sequence-restricted setup changeovers," Annals of Operations Research, Springer, vol. 209(1), pages 179-205, October.
    16. Guillermo Gallego & Ilkyeong Moon, 1995. "Strategic investment to reduce setup times in the economic lot scheduling problem," Naval Research Logistics (NRL), John Wiley & Sons, vol. 42(5), pages 773-790, August.
    17. Vidal-Carreras, Pilar I. & Garcia-Sabater, Jose P. & Coronado-Hernandez, Jairo R., 2012. "Economic lot scheduling with deliberated and controlled coproduction," European Journal of Operational Research, Elsevier, vol. 219(2), pages 396-404.
    18. Leven, Erik & Segerstedt, Anders, 2007. "A scheduling policy for adjusting economic lot quantities to a feasible solution," European Journal of Operational Research, Elsevier, vol. 179(2), pages 414-423, June.
    19. Hoque, M.A. & Kingsman, B.G., 2006. "Synchronization in common cycle lot size scheduling for a multi-product serial supply chain," International Journal of Production Economics, Elsevier, vol. 103(1), pages 316-331, September.
    20. Gong, Qiguo & Chen, Guohui & Zhang, Wen & Wang, Hui, 2022. "The role of humans in flexible smart factories," International Journal of Production Economics, Elsevier, vol. 254(C).

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:191:y:2008:i:3:p:1241-1253. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.