IDEAS home Printed from https://ideas.repec.org/a/spr/annopr/v240y2016i2d10.1007_s10479-014-1569-7.html
   My bibliography  Save this article

Supply planning models for a remanufacturer under just-in-time manufacturing environment with reverse logistics

Author

Listed:
  • Kyung Sung Jung

    (University of Florida)

  • Milind Dawande

    (The University of Texas at Dallas)

  • H. Neil Geismar

    (Texas A&M University)

  • V. Daniel R. Guide

    (The Pennsylvania State University)

  • Chelliah Sriskandarajah

    (Texas A&M University)

Abstract

We study a supply planning problem in a manufacturing system with two stages. The first stage is a remanufacturer that supplies two closely-related components to the second (manufacturing) stage, which uses each component as the basis for its respective product. The used products are recovered from the market by a third-party logistic provider through an established reverse logistics network. The remanufacturer may satisfy the manufacturer’s demand either by purchasing new components or by remanufacturing components recovered from the returned used products. The remanufacturer’s costs arise from product recovery, remanufacturing components, purchasing original components, holding inventories of recovered products and remanufactured components, production setups (at the first stage and at each component changeover), disposal of recovered products that are not remanufactured, and coordinating the supply modes. The objective is to develop optimal production plans for different production strategies. These strategies are differentiated by whether inventories of recovered products or remanufactured components are carried, and by whether the order in which retailers are served during the planning horizon may be resequenced. We devise production policies that minimize the total cost at the remanufacturer by specifying the quantity of components to be remanufactured, the quantity of new components to be purchased from suppliers, and the quantity of recovered used products that must be disposed. The effects of production capacity are also explored. A comprehensive computational study provides insights into this closed-loop supply chain for those strategies that are shown to be NP-hard.

Suggested Citation

  • Kyung Sung Jung & Milind Dawande & H. Neil Geismar & V. Daniel R. Guide & Chelliah Sriskandarajah, 2016. "Supply planning models for a remanufacturer under just-in-time manufacturing environment with reverse logistics," Annals of Operations Research, Springer, vol. 240(2), pages 533-581, May.
  • Handle: RePEc:spr:annopr:v:240:y:2016:i:2:d:10.1007_s10479-014-1569-7
    DOI: 10.1007/s10479-014-1569-7
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1007/s10479-014-1569-7
    File Function: Abstract
    Download Restriction: Access to the full text of the articles in this series is restricted.

    File URL: https://libkey.io/10.1007/s10479-014-1569-7?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Geraldo Ferrer & Jayashankar M. Swaminathan, 2006. "Managing New and Remanufactured Products," Management Science, INFORMS, vol. 52(1), pages 15-26, January.
    2. Ayres, Robert & Ferrer, Geraldo & Van Leynseele, Tania, 1997. "Eco-efficiency, asset recovery and remanufacturing," European Management Journal, Elsevier, vol. 15(5), pages 557-574, October.
    3. V. Daniel R. Guide & Terry P. Harrison & Luk N. Van Wassenhove, 2003. "The Challenge of Closed-Loop Supply Chains," Interfaces, INFORMS, vol. 33(6), pages 3-6, December.
    4. Inderfurth, K. & Teunter, R.H., 2001. "Production planning and control of closed-loop supply chains," Econometric Institute Research Papers EI 2001-39, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
    5. Michael R. Garey & Robert E. Tarjan & Gordon T. Wilfong, 1988. "One-Processor Scheduling with Symmetric Earliness and Tardiness Penalties," Mathematics of Operations Research, INFORMS, vol. 13(2), pages 330-348, May.
    6. Milind Dawande & Srinagesh Gavirneni & Yinping Mu & Suresh Sethi & Chelliah Sriskandarajah, 2010. "On the Interaction Between Demand Substitution and Production Changeovers," Manufacturing & Service Operations Management, INFORMS, vol. 12(4), pages 682-691, September.
    7. V. Daniel R. Guide & Luk N. Van Wassenhove, 2009. "OR FORUM---The Evolution of Closed-Loop Supply Chain Research," Operations Research, INFORMS, vol. 57(1), pages 10-18, February.
    8. Vedran Kordic (ed.), 2008. "Supply Chain," Books, IntechOpen, number 26, January-J.
    9. Roland Geyer & Luk N. Van Wassenhove & Atalay Atasu, 2007. "The Economics of Remanufacturing Under Limited Component Durability and Finite Product Life Cycles," Management Science, INFORMS, vol. 53(1), pages 88-100, January.
    10. Giutini, Ron & Gaudette, Kevin, 2003. "Remanufacturing: The next great opportunity for boosting US productivity," Business Horizons, Elsevier, vol. 46(6), pages 41-48.
    11. Teunter, Ruud & Kaparis, Konstantinos & Tang, Ou, 2008. "Multi-product economic lot scheduling problem with separate production lines for manufacturing and remanufacturing," European Journal of Operational Research, Elsevier, vol. 191(3), pages 1241-1253, December.
    12. Atalay Atasu & Miklos Sarvary & Luk N. Van Wassenhove, 2008. "Remanufacturing as a Marketing Strategy," Management Science, INFORMS, vol. 54(10), pages 1731-1746, October.
    13. U. Manoj & Jatinder Gupta & Sushil Gupta & Chelliah Sriskandarajah, 2008. "Supply chain scheduling: Just-in-time environment," Annals of Operations Research, Springer, vol. 161(1), pages 53-86, July.
    14. R. Canan Savaskan & Shantanu Bhattacharya & Luk N. Van Wassenhove, 2004. "Closed-Loop Supply Chain Models with Product Remanufacturing," Management Science, INFORMS, vol. 50(2), pages 239-252, February.
    15. Kaya, Onur, 2010. "Incentive and production decisions for remanufacturing operations," European Journal of Operational Research, Elsevier, vol. 201(2), pages 442-453, March.
    16. Irina Maslennikova & David Foley, 2000. "Xerox's Approach to Sustainability," Interfaces, INFORMS, vol. 30(3), pages 226-233, June.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Tamás Bányai & Béla Illés & Miklós Gubán & Ákos Gubán & Fabian Schenk & Ágota Bányai, 2019. "Optimization of Just-In-Sequence Supply: A Flower Pollination Algorithm-Based Approach," Sustainability, MDPI, vol. 11(14), pages 1-26, July.
    2. Hao Guo & Ying Zhang & Chunnan Zhang & Yu Liu & Yuan Zhou, 2020. "Location-inventory decisions for closed-loop supply chain management in the presence of the secondary market," Annals of Operations Research, Springer, vol. 291(1), pages 361-386, August.
    3. Wang, Nengmin & He, Qidong & Jiang, Bin, 2019. "Hybrid closed-loop supply chains with competition in recycling and product markets," International Journal of Production Economics, Elsevier, vol. 217(C), pages 246-258.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Kaya, Onur, 2010. "Incentive and production decisions for remanufacturing operations," European Journal of Operational Research, Elsevier, vol. 201(2), pages 442-453, March.
    2. Xiong, Yu & Zhou, Yu & Li, Gendao & Chan, Hing-Kai & Xiong, Zhongkai, 2013. "Don’t forget your supplier when remanufacturing," European Journal of Operational Research, Elsevier, vol. 230(1), pages 15-25.
    3. Liao, Haolan & Zhang, Qingyu & Shen, Neng & Nie, Yongyou & Li, Lu, 2021. "Coordination between forward and reverse production streams for maximum profitability," Omega, Elsevier, vol. 104(C).
    4. Qin Zhou & Kum Fai Yuen, 2020. "Analyzing the Effect of Government Subsidy on the Development of the Remanufacturing Industry," IJERPH, MDPI, vol. 17(10), pages 1-20, May.
    5. Zhou, Yu & Xiong, Yu & Jin, Minyue, 2021. "Less is more: Consumer education in a closed-loop supply chain with remanufacturing," Omega, Elsevier, vol. 101(C).
    6. Borenich, Andrea & Dickbauer, Yanick & Reimann, Marc & Souza, Gilvan C., 2020. "Should a manufacturer sell refurbished returns on the secondary market to incentivize retailers to reduce consumer returns?," European Journal of Operational Research, Elsevier, vol. 282(2), pages 569-579.
    7. Genc, Talat S. & Giovanni, Pietro De, 2017. "Trade-in and save: A two-period closed-loop supply chain game with price and technology dependent returns," International Journal of Production Economics, Elsevier, vol. 183(PB), pages 514-527.
    8. Ghosh, Debabrata & Gouda, Sirish & Shankar, Ravi & Swami, Sanjeev & Thomas, Vinu Cheruvil, 2018. "Strategic decision making under subscription-based contracts for remanufacturing," International Journal of Production Economics, Elsevier, vol. 200(C), pages 134-150.
    9. Xiong, Yu & Zhao, Quanwu & Zhou, Yu, 2016. "Manufacturer-remanufacturing vs supplier-remanufacturing in a closed-loop supply chain," International Journal of Production Economics, Elsevier, vol. 176(C), pages 21-28.
    10. Yan Zhang & Wen Zhang, 2023. "Optimal pricing and greening decisions in a supply chain when considering market segmentation," Annals of Operations Research, Springer, vol. 324(1), pages 93-130, May.
    11. Yenipazarli, Arda, 2016. "Managing new and remanufactured products to mitigate environmental damage under emissions regulation," European Journal of Operational Research, Elsevier, vol. 249(1), pages 117-130.
    12. Wu, Cheng-Han, 2015. "Strategic and operational decisions under sales competition and collection competition for end-of-use products in remanufacturing," International Journal of Production Economics, Elsevier, vol. 169(C), pages 11-20.
    13. Tianqin Shi & Dilip Chhajed & Zhixi Wan & Yunchuan Liu, 2020. "Distribution Channel Choice and Divisional Conflict in Remanufacturing Operations," Production and Operations Management, Production and Operations Management Society, vol. 29(7), pages 1702-1719, July.
    14. Zhou, Qin & Meng, Chao & Yuen, Kum Fai & Sheu, Jiuh-Biing, 2021. "Remanufacturing authorization strategy for an original equipment manufacturer-contract manufacturer supply chain: Cooperation or competition?," International Journal of Production Economics, Elsevier, vol. 240(C).
    15. Weisheng Deng, 2019. "Does Remanufacturing Always Benefit the Manufacturer and Hurt the Supplier?," Sustainability, MDPI, vol. 11(6), pages 1-13, March.
    16. Cao, Jian & Wu, Sisi & Kumar, Sanjay, 2023. "Recovering and remanufacturing to fulfill EPR regulation in the presence of secondary market," International Journal of Production Economics, Elsevier, vol. 263(C).
    17. Fuqiang Zhang & Renyu Zhang, 2018. "Trade-in Remanufacturing, Customer Purchasing Behavior, and Government Policy," Manufacturing & Service Operations Management, INFORMS, vol. 20(4), pages 601-616, October.
    18. Chen, Jen-Ming & Chang, Chia-I, 2012. "The co-opetitive strategy of a closed-loop supply chain with remanufacturing," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 48(2), pages 387-400.
    19. Gan, Shu-San & Pujawan, I. Nyoman & Suparno, & Widodo, Basuki, 2017. "Pricing decision for new and remanufactured product in a closed-loop supply chain with separate sales-channel," International Journal of Production Economics, Elsevier, vol. 190(C), pages 120-132.
    20. Ze-Bin Wang & Yao-Yu Wang & Jian-Cai Wang, 2016. "Optimal distribution channel strategy for new and remanufactured products," Electronic Commerce Research, Springer, vol. 16(2), pages 269-295, June.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:annopr:v:240:y:2016:i:2:d:10.1007_s10479-014-1569-7. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.