IDEAS home Printed from https://ideas.repec.org/p/mit/sloanp/703.html
   My bibliography  Save this paper

Information Hiding in Product Development: The Design Churn Effect

Author

Listed:
  • Whitney, Daniel
  • Eppinger, Steven D.
  • Yassine, Ali
  • Joglekar, Nitin
  • Braha, Dan

Abstract

Execution of a complex product development project is facilitated through its decomposition into an interrelated set of localized development tasks. When a local task is completed, its output is integrated through an iterative cycle of system-wide integration activities. Integration is often accompanied by inadvertent information hiding due to the asynchronous information exchanges. We show that information hiding leads to persistent recurrence of problems (termed as the design churn effect) such that progress oscillates between being on schedule and falling behind. The oscillatory nature of the PD process confounds progress measurement and makes it difficult to judge whether the project is on schedule or slipping. We develop a dynamic model of work transformation to derive conditions under which churn is observed as an unintended consequence of information hiding due to local and system task decomposition. We illustrate these conditions with a case example from an automotive development project and discuss strategies to mitigate design churn.

Suggested Citation

  • Whitney, Daniel & Eppinger, Steven D. & Yassine, Ali & Joglekar, Nitin & Braha, Dan, 2002. "Information Hiding in Product Development: The Design Churn Effect," Working papers 4333-02, Massachusetts Institute of Technology (MIT), Sloan School of Management.
  • Handle: RePEc:mit:sloanp:703
    as

    Download full text from publisher

    File URL: http://hdl.handle.net/1721.1/703
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Paul S. Adler & Avi Mandelbaum & Viên Nguyen & Elizabeth Schwerer, 1995. "From Project to Process Management: An Empirically-Based Framework for Analyzing Product Development Time," Management Science, INFORMS, vol. 41(3), pages 458-484, March.
    2. Robert P. Smith & Steven D. Eppinger, 1997. "Identifying Controlling Features of Engineering Design Iteration," Management Science, INFORMS, vol. 43(3), pages 276-293, March.
    3. Stefan Thomke & David E. Bell, 2001. "Sequential Testing in Product Development," Management Science, INFORMS, vol. 47(2), pages 308-323, February.
    4. Reza Ahmadi & Robert H. Wang, 1999. "Managing Development Risk in Product Design Processes," Operations Research, INFORMS, vol. 47(2), pages 235-246, April.
    5. Viswanathan Krishnan & Steven D. Eppinger & Daniel E. Whitney, 1997. "A Model-Based Framework to Overlap Product Development Activities," Management Science, INFORMS, vol. 43(4), pages 437-451, April.
    6. Nitindra R. Joglekar & Ali A. Yassine & Steven D. Eppinger & Daniel E. Whitney, 2001. "Performance of Coupled Product Development Activities with a Deadline," Management Science, INFORMS, vol. 47(12), pages 1605-1620, December.
    7. Hau L. Lee & V. Padmanabhan & Seungjin Whang, 1997. "Information Distortion in a Supply Chain: The Bullwhip Effect," Management Science, INFORMS, vol. 43(4), pages 546-558, April.
    8. Ford, David N., 1999. "Overcoming the 90% syndrome : iteration management in concurrent development projects," Working papers WP 4081-99., Massachusetts Institute of Technology (MIT), Sloan School of Management.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Scott A. Shane & Karl T. Ulrich, 2004. "50th Anniversary Article: Technological Innovation, Product Development, and Entrepreneurship in Management Science," Management Science, INFORMS, vol. 50(2), pages 133-144, February.
    2. Lin, Jun & Chai, Kah Hin & Wong, Yoke San & Brombacher, Aarnout C., 2008. "A dynamic model for managing overlapped iterative product development," European Journal of Operational Research, Elsevier, vol. 185(1), pages 378-392, February.
    3. Annika Lorenz & Michael Raven & Knut Blind, 2019. "The role of standardization at the interface of product and process development in biotechnology," The Journal of Technology Transfer, Springer, vol. 44(4), pages 1097-1133, August.
    4. Nitindra R. Joglekar & Ali A. Yassine & Steven D. Eppinger & Daniel E. Whitney, 2001. "Performance of Coupled Product Development Activities with a Deadline," Management Science, INFORMS, vol. 47(12), pages 1605-1620, December.
    5. Thomas A. Roemer & Reza Ahmadi, 2004. "Concurrent Crashing and Overlapping in Product Development," Operations Research, INFORMS, vol. 52(4), pages 606-622, August.
    6. Qian, Yanjun & Xie, Min & Goh, Thong Ngee & Lin, Jun, 2010. "Optimal testing strategies in overlapped design process," European Journal of Operational Research, Elsevier, vol. 206(1), pages 131-143, October.
    7. Victoria L. Mitchell & Barrie R. Nault, 2007. "Cooperative Planning, Uncertainty, and Managerial Control in Concurrent Design," Management Science, INFORMS, vol. 53(3), pages 375-389, March.
    8. V. Krishnan & Karl T. Ulrich, 2001. "Product Development Decisions: A Review of the Literature," Management Science, INFORMS, vol. 47(1), pages 1-21, January.
    9. Bhattacharya, Shantanu & Krishnan, V. & Mahajan, Vijay, 2003. "Operationalizing technology improvements in product development decision-making," European Journal of Operational Research, Elsevier, vol. 149(1), pages 102-130, August.
    10. Bernardo A. Huberman & Dennis M. Wilkinson, 2010. "Fluctuating Efforts and Interdependencies in Collaborative Work," Group Decision and Negotiation, Springer, vol. 19(2), pages 169-191, March.
    11. Joglekar, Nitin R. & Ford, David N., 2005. "Product development resource allocation with foresight," European Journal of Operational Research, Elsevier, vol. 160(1), pages 72-87, January.
    12. Lin, Jun & Qian, Yanjun & Cui, Wentian & Miao, Zhanli, 2010. "Overlapping and communication policies in product development," European Journal of Operational Research, Elsevier, vol. 201(3), pages 737-750, March.
    13. Yassine, Ali A. & Sreenivas, Ramavarapu S. & Zhu, Jian, 2008. "Managing the exchange of information in product development," European Journal of Operational Research, Elsevier, vol. 184(1), pages 311-326, January.
    14. Joglekar, Nitindra R., 2003. "Performance of coupled product development activities with a deadline," Working papers WP 4122-00., Massachusetts Institute of Technology (MIT), Sloan School of Management.
    15. Morris A. Cohen & Teck H. Ho & Z. Justin Ren & Christian Terwiesch, 2003. "Measuring Imputed Cost in the Semiconductor Equipment Supply Chain," Management Science, INFORMS, vol. 49(12), pages 1653-1670, December.
    16. Indranil R. Bardhan & Vish V. Krishnan & Shu Lin, 2007. "Project Performance and the Enabling Role of Information Technology: An Exploratory Study on the Role of Alignment," Manufacturing & Service Operations Management, INFORMS, vol. 9(4), pages 579-595, May.
    17. Sosa, Manuel E., 2003. "Factors that influence technical communication in distributed product development : an empirical study in the telecommunications industry," Working papers WP 4123-00., Massachusetts Institute of Technology (MIT), Sloan School of Management.
    18. Wallace J. Hopp & Seyed M. R. Iravani & Gigi Y. Yuen, 2007. "Operations Systems with Discretionary Task Completion," Management Science, INFORMS, vol. 53(1), pages 61-77, January.
    19. Akhilesh Bajaj & Sunder Kekre & Kannan Srinivasan, 2004. "Managing NPD: Cost and Schedule Performance in Design and Manufacturing," Management Science, INFORMS, vol. 50(4), pages 527-536, April.
    20. Nadia Bhuiyan & Donald Gerwin & Vince Thomson, 2004. "Simulation of the New Product Development Process for Performance Improvement," Management Science, INFORMS, vol. 50(12), pages 1690-1703, December.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:mit:sloanp:703. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: None (email available below). General contact details of provider: https://edirc.repec.org/data/ssmitus.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.