IDEAS home Printed from https://ideas.repec.org/a/inm/oropre/v47y1999i2p235-246.html
   My bibliography  Save this article

Managing Development Risk in Product Design Processes

Author

Listed:
  • Reza Ahmadi

    (University of California at Los Angeles, Los Angeles, California)

  • Robert H. Wang

    (University of California at Los Angeles, Los Angeles, California)

Abstract

Product development has become the focal point of industrial competition and is the cornerstone of long-term survival for most firms. One of the major management challenges in product development is to deal with development risk in the design process. In this paper we provide a strategic guideline as to how the design process should be managed and controlled. We describe how design reviews and engineering resources can be scheduled as the control mechanisms to operationally manage development risk. The methodologies developed are an integral part of a project to fundamentally restructure product design processes at Rocketdyne Division of Rockwell International, which designs and develops liquid-propellant rocket propulsion systems.

Suggested Citation

  • Reza Ahmadi & Robert H. Wang, 1999. "Managing Development Risk in Product Design Processes," Operations Research, INFORMS, vol. 47(2), pages 235-246, April.
  • Handle: RePEc:inm:oropre:v:47:y:1999:i:2:p:235-246
    DOI: 10.1287/opre.47.2.235
    as

    Download full text from publisher

    File URL: http://dx.doi.org/10.1287/opre.47.2.235
    Download Restriction: no

    File URL: https://libkey.io/10.1287/opre.47.2.235?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    References listed on IDEAS

    as
    1. Robert P. Smith & Steven D. Eppinger, 1997. "A Predictive Model of Sequential Iteration in Engineering Design," Management Science, INFORMS, vol. 43(8), pages 1104-1120, August.
    2. Albert Y. Ha & Evan L. Porteus, 1995. "Optimal Timing of Reviews in Concurrent Design for Manufacturability," Management Science, INFORMS, vol. 41(9), pages 1431-1447, September.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Bahram Hamraz & Nicholas H. M. Caldwell & P. John Clarkson, 2013. "A Holistic Categorization Framework for Literature on Engineering Change Management," Systems Engineering, John Wiley & Sons, vol. 16(4), pages 473-505, December.
    2. Whitney, Daniel & Eppinger, Steven D. & Yassine, Ali & Joglekar, Nitin & Braha, Dan, 2002. "Information Hiding in Product Development: The Design Churn Effect," Working papers 4333-02, Massachusetts Institute of Technology (MIT), Sloan School of Management.
    3. Aditya U. Kulkarni & Alejandro Salado & Peng Xu & Christian Wernz, 2021. "An evaluation of the optimality of frequent verification for vertically integrated systems," Systems Engineering, John Wiley & Sons, vol. 24(1), pages 17-33, January.
    4. Thomas A. Roemer & Reza Ahmadi & Robert H. Wang, 2000. "Time-Cost Trade-Offs in Overlapped Product Development," Operations Research, INFORMS, vol. 48(6), pages 858-865, December.
    5. Thomas A. Roemer & Reza Ahmadi, 2004. "Concurrent Crashing and Overlapping in Product Development," Operations Research, INFORMS, vol. 52(4), pages 606-622, August.
    6. Lin, Jun & Chai, Kah Hin & Wong, Yoke San & Brombacher, Aarnout C., 2008. "A dynamic model for managing overlapped iterative product development," European Journal of Operational Research, Elsevier, vol. 185(1), pages 378-392, February.
    7. Qian, Yanjun & Xie, Min & Goh, Thong Ngee & Lin, Jun, 2010. "Optimal testing strategies in overlapped design process," European Journal of Operational Research, Elsevier, vol. 206(1), pages 131-143, October.
    8. Salah Ahmed Mohamed Almoslehy & Mohammed Saad Alkahtani, 2021. "Key Approaches, Risks, and Product Performance in Managing the Development Process of Complex Products Sustainably," Sustainability, MDPI, vol. 13(9), pages 1-24, April.
    9. Bhattacharya, Shantanu & Krishnan, V. & Mahajan, Vijay, 2003. "Operationalizing technology improvements in product development decision-making," European Journal of Operational Research, Elsevier, vol. 149(1), pages 102-130, August.
    10. Nitindra R. Joglekar & Ali A. Yassine & Steven D. Eppinger & Daniel E. Whitney, 2001. "Performance of Coupled Product Development Activities with a Deadline," Management Science, INFORMS, vol. 47(12), pages 1605-1620, December.
    11. Ahmadi, Reza & Roemer, Thomas A. & Wang, Robert H., 2001. "Structuring product development processes," European Journal of Operational Research, Elsevier, vol. 130(3), pages 539-558, May.
    12. Joglekar, Nitindra R., 2003. "Performance of coupled product development activities with a deadline," Working papers WP 4122-00., Massachusetts Institute of Technology (MIT), Sloan School of Management.
    13. Tyson R. Browning & Ernst Fricke & Herbert Negele, 2006. "Key concepts in modeling product development processes," Systems Engineering, John Wiley & Sons, vol. 9(2), pages 104-128, June.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Atif Açıkgöz & Irem Demirkan & Gary P. Latham & Cemil Kuzey, 2021. "The Relationship Between Unlearning and Innovation Ambidexterity with the Performance of New Product Development Teams," Group Decision and Negotiation, Springer, vol. 30(4), pages 945-982, August.
    2. Nitindra R. Joglekar & Ali A. Yassine & Steven D. Eppinger & Daniel E. Whitney, 2001. "Performance of Coupled Product Development Activities with a Deadline," Management Science, INFORMS, vol. 47(12), pages 1605-1620, December.
    3. V. Krishnan & Karl T. Ulrich, 2001. "Product Development Decisions: A Review of the Literature," Management Science, INFORMS, vol. 47(1), pages 1-21, January.
    4. Morvarid Rahmani & Guillaume Roels & Uday S. Karmarkar, 2017. "Collaborative Work Dynamics in Projects with Co‐Production," Production and Operations Management, Production and Operations Management Society, vol. 26(4), pages 686-703, April.
    5. Thomas A. Roemer & Reza Ahmadi & Robert H. Wang, 2000. "Time-Cost Trade-Offs in Overlapped Product Development," Operations Research, INFORMS, vol. 48(6), pages 858-865, December.
    6. Christian Terwiesch & Christoph H. Loch, 1999. "Measuring the Effectiveness of Overlapping Development Activities," Management Science, INFORMS, vol. 45(4), pages 455-465, April.
    7. Christian Terwiesch & Yi Xu, 2008. "Innovation Contests, Open Innovation, and Multiagent Problem Solving," Management Science, INFORMS, vol. 54(9), pages 1529-1543, September.
    8. Luo, Jianxi & Triulzi, Giorgio, 2018. "Cyclic dependence, vertical integration, and innovation: The case of Japanese electronics sector in the 1990s," Technological Forecasting and Social Change, Elsevier, vol. 132(C), pages 46-55.
    9. Aditya U. Kulkarni & Alejandro Salado & Peng Xu & Christian Wernz, 2021. "An evaluation of the optimality of frequent verification for vertically integrated systems," Systems Engineering, John Wiley & Sons, vol. 24(1), pages 17-33, January.
    10. Stefan Thomke & David E. Bell, 2001. "Sequential Testing in Product Development," Management Science, INFORMS, vol. 47(2), pages 308-323, February.
    11. Lin, Jun & Qian, Yanjun & Cui, Wentian & Goh, Thong Ngee, 2015. "An effective approach for scheduling coupled activities in development projects," European Journal of Operational Research, Elsevier, vol. 243(1), pages 97-108.
    12. Thomke, Stefan H., 1998. "Simulation, learning and R&D performance: Evidence from automotive development," Research Policy, Elsevier, vol. 27(1), pages 55-74, May.
    13. Joglekar, Nitindra R., 2003. "Performance of coupled product development activities with a deadline," Working papers WP 4122-00., Massachusetts Institute of Technology (MIT), Sloan School of Management.
    14. Gülru F. Özkan-Seely & Cheryl Gaimon & Stylianos Kavadias, 2015. "Dynamic Knowledge Transfer and Knowledge Development for Product and Process Design Teams," Manufacturing & Service Operations Management, INFORMS, vol. 17(2), pages 177-190, May.
    15. Inayat Ullah & Dunbing Tang & Qi Wang & Leilei Yin, 2017. "Least Risky Change Propagation Path Analysis in Product Design Process," Systems Engineering, John Wiley & Sons, vol. 20(4), pages 379-391, July.
    16. Oliver Baumann, 2015. "Distributed Problem Solving in Modular Systems: the Benefit of Temporary Coordination Neglect," Systems Research and Behavioral Science, Wiley Blackwell, vol. 32(1), pages 124-136, January.
    17. Jeremy Hutchison-Krupat, 2018. "Communication, Incentives, and the Execution of a Strategic Initiative," Management Science, INFORMS, vol. 64(7), pages 3380-3399, July.
    18. Chakravarty, Amiya K., 2001. "Overlapping design and build cycles in product development," European Journal of Operational Research, Elsevier, vol. 134(2), pages 392-424, October.
    19. Sosa, Manuel E., 2003. "Factors that influence technical communication in distributed product development : an empirical study in the telecommunications industry," Working papers WP 4123-00., Massachusetts Institute of Technology (MIT), Sloan School of Management.
    20. Thomas A. Roemer & Reza Ahmadi, 2004. "Concurrent Crashing and Overlapping in Product Development," Operations Research, INFORMS, vol. 52(4), pages 606-622, August.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:oropre:v:47:y:1999:i:2:p:235-246. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.