IDEAS home Printed from https://ideas.repec.org/p/ess/wpaper/id12688.html
   My bibliography  Save this paper

Role of Bidding Method and Risk Allocation in the Performance of Public Private Partnership (PPP) Projects

Author

Listed:
  • Chandan Kumar

Abstract

This paper analyses the Indian PPP framework, including its bidding process and the standard concession agreement. The paper argues that the existing bidding method (i.e. premium/grant based method) can result in overvaluation of the projects due to optimism bias. When optimism about high traffic volumes do not materialize in the long run, projects could come under stress or fail, which is quite visible for Indian PPP road projects. This paper discusses an alternative bidding method called least present value of revenue (LPVR) and compares this method for the Indian PPP set-up with the help of Monte Carlo simulations by creating various real-life kind of scenarios. Results show that both methods have their own advantages depending on what was expected and what is actually realized. If expectations are low, then both methods gives more or less competitive results, but as expectations increase the LPVR method starts giving better results with a reasonably high certainty.

Suggested Citation

  • Chandan Kumar, 2018. "Role of Bidding Method and Risk Allocation in the Performance of Public Private Partnership (PPP) Projects," Working Papers id:12688, eSocialSciences.
  • Handle: RePEc:ess:wpaper:id:12688
    Note: Institutional Papers
    as

    Download full text from publisher

    File URL: http://www.esocialsciences.org/Download/repecDownload.aspx?fname=A201845152953_29.pdf&fcategory=Articles&AId=12688&fref=repec
    Download Restriction: no
    ---><---

    Other versions of this item:

    References listed on IDEAS

    as
    1. Darrin Grimsey & Mervyn K. Lewis, 2004. "Public Private Partnerships," Books, Edward Elgar Publishing, number 2438.
    2. Paul A. Grout, 2003. "Public and Private Sector Discount Rates in Public-Private Partnerships," Economic Journal, Royal Economic Society, vol. 113(486), pages 62-68, March.
    3. Tan, Zhijia & Yang, Hai, 2012. "Flexible build-operate-transfer contracts for road franchising under demand uncertainty," Transportation Research Part B: Methodological, Elsevier, vol. 46(10), pages 1419-1439.
    4. Eduardo M. R. A. Engel & Ronald D. Fischer & Alexander Galetovic, 2001. "Least-Present-Value-of-Revenue Auctions and Highway Franchising," Journal of Political Economy, University of Chicago Press, vol. 109(5), pages 993-1020, October.
    5. F CvN FOURIE & P BURGER, 2000. "An Economic Analysis and Assessment of Public ‐ Private Partnerships (PPPs)," South African Journal of Economics, Economic Society of South Africa, vol. 68(4), pages 305-316, December.
    6. A. V. Thomas & Satyanarayana Kalidindi & K. Ananthanarayanan, 2003. "Risk perception analysis of BOT road project participants in India," Construction Management and Economics, Taylor & Francis Journals, vol. 21(4), pages 393-407.
    7. Kagel, John H. & Levin, Dan, 1986. "The Winner's Curse and Public Information in Common Value Auctions," American Economic Review, American Economic Association, vol. 76(5), pages 894-920, December.
    8. José M. Vassallo, 2006. "Traffic Risk Mitigation in Highway Concession Projects: The Experience of Chile," Journal of Transport Economics and Policy, University of Bath, vol. 40(3), pages 359-381, September.
    9. Engel, Eduardo & Fischer, Ronald & Galetovic, Alexander, 1997. "Highway Franchising: Pitfalls and Opportunities," American Economic Review, American Economic Association, vol. 87(2), pages 68-72, May.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Tan, Zhijia & Yang, Hai, 2012. "Flexible build-operate-transfer contracts for road franchising under demand uncertainty," Transportation Research Part B: Methodological, Elsevier, vol. 46(10), pages 1419-1439.
    2. Meng, Qiang & Lu, Zhaoyang, 2017. "Quantitative analyses of highway franchising under build-operate-transfer scheme: Critical review and future research directions," Transportation Research Part B: Methodological, Elsevier, vol. 102(C), pages 105-123.
    3. Shi, Shasha & Yin, Yafeng & An, Qingxian & Chen, Ke, 2021. "Optimal build-operate-transfer road contracts under information asymmetry and uncertainty," Transportation Research Part B: Methodological, Elsevier, vol. 152(C), pages 65-86.
    4. Feng, Zhuo & Zhang, Yiwen & Zhang, Shuibo & Song, Jinbo, 2018. "Contracting and renegotiating with a loss-averse private firm in BOT road projects," Transportation Research Part B: Methodological, Elsevier, vol. 112(C), pages 40-72.
    5. Albalate, Daniel & Bel, Germà, 2009. "Regulating concessions of toll motorways: An empirical study on fixed vs. variable term contracts," Transportation Research Part A: Policy and Practice, Elsevier, vol. 43(2), pages 219-229, February.
    6. Zhang, Yiwen & Feng, Zhuo & Zhang, Shuibo, 2018. "The effects of concession period structures on BOT road contracts," Transportation Research Part A: Policy and Practice, Elsevier, vol. 107(C), pages 106-125.
    7. Vassallo, José Manuel, 2010. "The role of the discount rate in tendering highway concessions under the LPVR approach," Transportation Research Part A: Policy and Practice, Elsevier, vol. 44(10), pages 806-814, December.
    8. Diego Aycinena & Rimvydas Baltaduonis & Lucas Rentschler, 2014. "Valuation structure in first-price and least-revenue auctions: an experimental investigation," Experimental Economics, Springer;Economic Science Association, vol. 17(1), pages 100-128, March.
    9. Huang, Hai-Jun & Xia, Tian & Tian, Qiong & Liu, Tian-Liang & Wang, Chenlan & Li, Daqing, 2020. "Transportation issues in developing China's urban agglomerations," Transport Policy, Elsevier, vol. 85(C), pages 1-22.
    10. Jin, Hongyu & Liu, Shijing & Sun, Jide & Liu, Chunlu, 2021. "Determining concession periods and minimum revenue guarantees in public-private-partnership agreements," European Journal of Operational Research, Elsevier, vol. 291(2), pages 512-524.
    11. Viegas, José M., 2010. "Questioning the need for full amortization in PPP contracts for transport Infrastructure," Research in Transportation Economics, Elsevier, vol. 30(1), pages 139-144.
    12. Lu, Zhaoyang & Meng, Qiang, 2017. "Analysis of optimal BOT highway capacity and economic toll adjustment provisions under traffic demand uncertainty," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 100(C), pages 17-37.
    13. Babatunde, Solomon Olusola & Perera, Srinath, 2017. "Analysis of traffic revenue risk factors in BOT road projects in developing countries," Transport Policy, Elsevier, vol. 56(C), pages 41-49.
    14. Fandel, Günter & Giese, Anke & Mohn, Brigitte, 2012. "Measuring synergy effects of a Public Social Private Partnership (PSPP) project," International Journal of Production Economics, Elsevier, vol. 140(2), pages 815-824.
    15. Baños-Pino, José F. & Boto-García, David & Zapico, Emma, 2021. "Persistence and dynamics in the efficiency of toll motorways: The Spanish case," Efficiency Series Papers 2021/03, University of Oviedo, Department of Economics, Oviedo Efficiency Group (OEG).
    16. Feng, Zhuo & Song, Jinbo & Yang, Xiaoxing & Guo, Ran, 2023. "Contractual flexibility, firm effort, and subsidy design: A comparison of PPP project contracts," European Journal of Operational Research, Elsevier, vol. 307(1), pages 484-496.
    17. Watling, D.P. & Shepherd, S.P. & Koh, A., 2015. "Cordon toll competition in a network of two cities: Formulation and sensitivity to traveller route and demand responses," Transportation Research Part B: Methodological, Elsevier, vol. 76(C), pages 93-116.
    18. Rachael Nsasira & Benon C. Basheka & Pross. N. Oluka, 2013. "Public Private Partnerships (PPPs) and Enhanced Service Delivery in Uganda: Implications from the Energy Sector," International Journal of Business Administration, International Journal of Business Administration, Sciedu Press, vol. 4(3), pages 48-60, May.
    19. Nicolas Campos & Eduardo Engel & Ronald D. Fischer & Alexander Galetovic, 2019. "Renegotiations and corruption in infrastructure: The Odebrecht case," "Marco Fanno" Working Papers 0230, Dipartimento di Scienze Economiche "Marco Fanno".
    20. Marian MOSZORO, 2014. "Efficient Public-Private Capital Structures," Annals of Public and Cooperative Economics, Wiley Blackwell, vol. 85(1), pages 103-126, March.

    More about this item

    Keywords

    Public Private Partnership (PPP); Road Sector; Bidding Method; Contract Design; Monte Carlo Simulation; Sensitivity Analysis; Opportunism; Hold-up; Contracts; Public Private Partnership; design; low probability; possible opportunism; accountability; Indian PPP contracts; India;
    All these keywords.

    JEL classification:

    • D44 - Microeconomics - - Market Structure, Pricing, and Design - - - Auctions
    • H54 - Public Economics - - National Government Expenditures and Related Policies - - - Infrastructures
    • C15 - Mathematical and Quantitative Methods - - Econometric and Statistical Methods and Methodology: General - - - Statistical Simulation Methods: General

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:ess:wpaper:id:12688. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Padma Prakash (email available below). General contact details of provider: http://www.esocialsciences.org .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.