IDEAS home Printed from https://ideas.repec.org/a/wly/navres/v43y1996i2p191-210.html
   My bibliography  Save this article

Inventory models of future supply uncertainty with single and multiple suppliers

Author

Listed:
  • Mahmut Parlar
  • David Perry

Abstract

We consider order‐quantity/reorder‐point inventory models where the availability of supply is subject to random fluctuations. We use concepts from renewal reward processes to develop average cost objective function models for single, two, and multiple suppliers. Identifying the regenerative cycle for each problem aids the development of the cost function. In the case of two suppliers, spectral theory is used to derive explicit expressions for the transient probabilities of a four‐state continuous‐time Markov chain representing the status of the system. These probabilities are used to compute the exact form of the average cost expression. For the multiple‐supplier problem, assuming that all the suppliers have similar availability characteristics, we develop a simple model and show that as the number of suppliers becomes large, the model reduces to the classical EOQ model. © 1996 John Wiley & Sons, Inc.

Suggested Citation

  • Mahmut Parlar & David Perry, 1996. "Inventory models of future supply uncertainty with single and multiple suppliers," Naval Research Logistics (NRL), John Wiley & Sons, vol. 43(2), pages 191-210, March.
  • Handle: RePEc:wly:navres:v:43:y:1996:i:2:p:191-210
    DOI: 10.1002/(SICI)1520-6750(199603)43:23.0.CO;2-5
    as

    Download full text from publisher

    File URL: https://doi.org/10.1002/(SICI)1520-6750(199603)43:23.0.CO;2-5
    Download Restriction: no

    File URL: https://libkey.io/10.1002/(SICI)1520-6750(199603)43:23.0.CO;2-5?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    References listed on IDEAS

    as
    1. Harry Groenevelt & Liliane Pintelon & Abraham Seidmann, 1992. "Production Lot Sizing with Machine Breakdowns," Management Science, INFORMS, vol. 38(1), pages 104-123, January.
    2. Hung-Po Chao, 1987. "Inventory Policy in the Presence of Market Disruptions," Operations Research, INFORMS, vol. 35(2), pages 274-281, April.
    3. Robert R. Meyer & Michael H. Rothkopf & Stephen A. Smith, 1979. "Reliability and Inventory in a Production-Storage System," Management Science, INFORMS, vol. 25(8), pages 799-807, August.
    4. Mahmut Parlar & Defne Berkin, 1991. "Future supply uncertainty in EOQ models," Naval Research Logistics (NRL), John Wiley & Sons, vol. 38(1), pages 107-121, February.
    5. Edward A. Silver, 1981. "Operations Research in Inventory Management: A Review and Critique," Operations Research, INFORMS, vol. 29(4), pages 628-645, August.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Parlar, Mahmut & Perry, David, 1995. "Analysis of a (Q, r, T) inventory policy with deterministic and random yields when future supply is uncertain," European Journal of Operational Research, Elsevier, vol. 84(2), pages 431-443, July.
    2. Mahmut Parlar & Defne Berkin, 1991. "Future supply uncertainty in EOQ models," Naval Research Logistics (NRL), John Wiley & Sons, vol. 38(1), pages 107-121, February.
    3. Antonio Arreola‐Risa & Gregory A. DeCroix, 1998. "Inventory management under random supply disruptions and partial backorders," Naval Research Logistics (NRL), John Wiley & Sons, vol. 45(7), pages 687-703, October.
    4. Luangkesorn, K.L. & Klein, G. & Bidanda, B., 2016. "Analysis of production systems with potential for severe disruptions," International Journal of Production Economics, Elsevier, vol. 171(P4), pages 478-486.
    5. Gregory A. DeCroix, 2013. "Inventory Management for an Assembly System Subject to Supply Disruptions," Management Science, INFORMS, vol. 59(9), pages 2079-2092, September.
    6. Harun Öztürk, 2019. "Modeling an inventory problem with random supply, inspection and machine breakdown," OPSEARCH, Springer;Operational Research Society of India, vol. 56(2), pages 497-527, June.
    7. Yimin Wang & Brian Tomlin, 2009. "To wait or not to wait: Optimal ordering under lead time uncertainty and forecast updating," Naval Research Logistics (NRL), John Wiley & Sons, vol. 56(8), pages 766-779, December.
    8. Mahmut Parlar, 2000. "Probabilistic Analysis of Renewal Cycles: An Application to a Non-Markovian Inventory Problem with Multiple Objectives," Operations Research, INFORMS, vol. 48(2), pages 243-255, April.
    9. Karakatsoulis, G. & Skouri, K., 2023. "A periodic review inventory model facing different disruption profiles," International Journal of Production Economics, Elsevier, vol. 265(C).
    10. Snyder, Lawrence V., 2014. "A tight approximation for an EOQ model with supply disruptions," International Journal of Production Economics, Elsevier, vol. 155(C), pages 91-108.
    11. Schmid, Verena & Doerner, Karl F. & Laporte, Gilbert, 2013. "Rich routing problems arising in supply chain management," European Journal of Operational Research, Elsevier, vol. 224(3), pages 435-448.
    12. B. Khoury, 2009. "A discrete approach to designing optimal hedging-point control policies for production-inventory systems with general stochastic behavior," Computational Management Science, Springer, vol. 6(4), pages 399-409, October.
    13. A. Dolgui & M. Kovalyov & K. Shchamialiova, 2011. "Multi-product lot-sizing and sequencing on a single imperfect machine," Computational Optimization and Applications, Springer, vol. 50(3), pages 465-482, December.
    14. Mohebbi, E., 2008. "A note on a production control model for a facility with limited storage capacity in a random environment," European Journal of Operational Research, Elsevier, vol. 190(2), pages 562-570, October.
    15. Kumar, Anupam & Evers, Philip T., 2015. "Setting safety stock based on imprecise records," International Journal of Production Economics, Elsevier, vol. 169(C), pages 68-75.
    16. Jingfu Huang & Gaoke Wu & Yiju Wang, 2021. "Retailer’s Emergency Ordering Policy When Facing an Impending Supply Disruption," Sustainability, MDPI, vol. 13(13), pages 1-21, June.
    17. Yingjie Fan & Frank Schwartz & Stefan Voß & David L. Woodruff, 2017. "Stochastic programming for flexible global supply chain planning," Flexible Services and Manufacturing Journal, Springer, vol. 29(3), pages 601-633, December.
    18. Chakraborty, Tulika & Giri, B.C. & Chaudhuri, K.S., 2008. "Production lot sizing with process deterioration and machine breakdown," European Journal of Operational Research, Elsevier, vol. 185(2), pages 606-618, March.
    19. Kosuke Kawakami & Hirokazu Kobayashi & Kazuhide Nakata, 2021. "Seasonal Inventory Management Model for Raw Materials in Steel Industry," Interfaces, INFORMS, vol. 51(4), pages 312-324, July.
    20. Chiu, Singa Wang & Chou, Chung-Li & Wu, Wen-Kuei, 2013. "Optimizing replenishment policy in an EPQ-based inventory model with nonconforming items and breakdown," Economic Modelling, Elsevier, vol. 35(C), pages 330-337.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:wly:navres:v:43:y:1996:i:2:p:191-210. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Wiley Content Delivery (email available below). General contact details of provider: https://doi.org/10.1002/(ISSN)1520-6750 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.