On the equivalence of jit and mrp as technologies for reducing wastes in manufacturing
Author
Abstract
Suggested Citation
DOI: 10.1002/1520-6750(199312)40:73.0.CO;2-L
Download full text from publisher
References listed on IDEAS
- Jean-Luc Deleersnyder & Thom J. Hodgson & Henri Muller-Malek & Peter J. O'Grady, 1989. "Kanban Controlled Pull Systems: An Analytic Approach," Management Science, INFORMS, vol. 35(9), pages 1079-1091, September.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Wilhelm, W. E. & Som, Pradip, 1998. "Analysis of a single-stage, single-product, stochastic, MRP-controlled assembly system," European Journal of Operational Research, Elsevier, vol. 108(1), pages 74-93, July.
- Alfieri, Arianna & Matta, Andrea, 2012. "Mathematical programming formulations for approximate simulation of multistage production systems," European Journal of Operational Research, Elsevier, vol. 219(3), pages 773-783.
- Kim, Ilhyung & Tang, Christopher S., 1997. "Lead time and response time in a pull production control system," European Journal of Operational Research, Elsevier, vol. 101(3), pages 474-485, September.
- Houmin Yan & Xun Yu Zhou & G. Yin, 1999. "Approximating an Optimal Production Policy in a Continuous Flow Line: Recurrence and Asymptotic Properties," Operations Research, INFORMS, vol. 47(4), pages 535-549, August.
- Zhao Xiaobo & Qiguo Gong & Kenichi Nakashima, 2001. "Analysis of a production system in a general configuration," Naval Research Logistics (NRL), John Wiley & Sons, vol. 48(2), pages 128-143, March.
- Iwase, Masaharu & Ohno, Katsuhisa, 2011. "The performance evaluation of a multi-stage JIT production system with stochastic demand and production capacities," European Journal of Operational Research, Elsevier, vol. 214(2), pages 216-222, October.
- Venky Nagar & Madhav V. Rajan & Richard Saouma, 2009. "The Incentive Value of Inventory and Cross‐training in Modern Manufacturing," Journal of Accounting Research, Wiley Blackwell, vol. 47(4), pages 991-1025, September.
- Subba Rao, S. & Gunasekaran, A. & Goyal, S. K. & Martikainen, T., 1998. "Waiting line model applications in manufacturing," International Journal of Production Economics, Elsevier, vol. 54(1), pages 1-28, January.
- Yucesan, Enver & de Groote, Xavier, 2000. "Lead times, order release mechanisms, and customer service," European Journal of Operational Research, Elsevier, vol. 120(1), pages 118-130, January.
- Hirakawa, Yasuhiro, 1996. "Performance of a multistage hybrid push/pull production control system," International Journal of Production Economics, Elsevier, vol. 44(1-2), pages 129-135, June.
- Chen-Yang Cheng & Shu-Fen Li & Chia-Leng Lee & Ranon Jientrakul & Chumpol Yuangyai, 2022. "A Comparative Study of Unbalanced Production Lines Using Simulation Modeling: A Case Study for Solar Silicon Manufacturing," Sustainability, MDPI, vol. 14(2), pages 1-15, January.
- Askin, Ronald G. & Krishnan, Shravan, 2009. "Defining inventory control points in multiproduct stochastic pull systems," International Journal of Production Economics, Elsevier, vol. 120(2), pages 418-429, August.
- Ou, Jihong & Jiang, Jiong, 1997. "Yield comparison of push and pull control methods on production systems with unreliable machines," International Journal of Production Economics, Elsevier, vol. 50(1), pages 1-12, May.
- Mascolo, Maria Di, 1996. "Analysis of a synchronization station for the performance evaluation of a kanban system with a general arrival process of demands," European Journal of Operational Research, Elsevier, vol. 89(1), pages 147-163, February.
- Ahmadi, Reza H. & Matsuo, Hirofumi, 2000. "A mini-line approach for pull production," European Journal of Operational Research, Elsevier, vol. 125(2), pages 340-358, September.
- Huang, Min & Wang, Dingwei & Ip, W. H., 1998. "Simulation study of CONWIP for a cold rolling plant," International Journal of Production Economics, Elsevier, vol. 54(3), pages 257-266, May.
- Kojima, Mitsutoshi & Nakashima, Kenichi & Ohno, Katsuhisa, 2008. "Performance evaluation of SCM in JIT environment," International Journal of Production Economics, Elsevier, vol. 115(2), pages 439-443, October.
- Andijani, A. A., 1998. "A multi-criterion approach for Kanban allocations," Omega, Elsevier, vol. 26(4), pages 483-493, August.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:wly:navres:v:40:y:1993:i:7:p:905-924. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Wiley Content Delivery (email available below). General contact details of provider: https://doi.org/10.1002/(ISSN)1520-6750 .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.