Kanban Controlled Pull Systems: An Analytic Approach
Author
Abstract
Suggested Citation
DOI: 10.1287/mnsc.35.9.1079
Download full text from publisher
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Chen-Yang Cheng & Shu-Fen Li & Chia-Leng Lee & Ranon Jientrakul & Chumpol Yuangyai, 2022. "A Comparative Study of Unbalanced Production Lines Using Simulation Modeling: A Case Study for Solar Silicon Manufacturing," Sustainability, MDPI, vol. 14(2), pages 1-15, January.
- John Miltenburg, 1993. "On the equivalence of jit and mrp as technologies for reducing wastes in manufacturing," Naval Research Logistics (NRL), John Wiley & Sons, vol. 40(7), pages 905-924, December.
- Venky Nagar & Madhav V. Rajan & Richard Saouma, 2009. "The Incentive Value of Inventory and Crossâtraining in Modern Manufacturing," Journal of Accounting Research, Wiley Blackwell, vol. 47(4), pages 991-1025, September.
- Huang, Min & Wang, Dingwei & Ip, W. H., 1998. "Simulation study of CONWIP for a cold rolling plant," International Journal of Production Economics, Elsevier, vol. 54(3), pages 257-266, May.
- Iwase, Masaharu & Ohno, Katsuhisa, 2011. "The performance evaluation of a multi-stage JIT production system with stochastic demand and production capacities," European Journal of Operational Research, Elsevier, vol. 214(2), pages 216-222, October.
- Kojima, Mitsutoshi & Nakashima, Kenichi & Ohno, Katsuhisa, 2008. "Performance evaluation of SCM in JIT environment," International Journal of Production Economics, Elsevier, vol. 115(2), pages 439-443, October.
- Wilhelm, W. E. & Som, Pradip, 1998. "Analysis of a single-stage, single-product, stochastic, MRP-controlled assembly system," European Journal of Operational Research, Elsevier, vol. 108(1), pages 74-93, July.
- Alfieri, Arianna & Matta, Andrea, 2012. "Mathematical programming formulations for approximate simulation of multistage production systems," European Journal of Operational Research, Elsevier, vol. 219(3), pages 773-783.
- Kim, Ilhyung & Tang, Christopher S., 1997. "Lead time and response time in a pull production control system," European Journal of Operational Research, Elsevier, vol. 101(3), pages 474-485, September.
- Zhao Xiaobo & Qiguo Gong & Kenichi Nakashima, 2001. "Analysis of a production system in a general configuration," Naval Research Logistics (NRL), John Wiley & Sons, vol. 48(2), pages 128-143, March.
- Ou, Jihong & Jiang, Jiong, 1997. "Yield comparison of push and pull control methods on production systems with unreliable machines," International Journal of Production Economics, Elsevier, vol. 50(1), pages 1-12, May.
- Subba Rao, S. & Gunasekaran, A. & Goyal, S. K. & Martikainen, T., 1998. "Waiting line model applications in manufacturing," International Journal of Production Economics, Elsevier, vol. 54(1), pages 1-28, January.
- Askin, Ronald G. & Krishnan, Shravan, 2009. "Defining inventory control points in multiproduct stochastic pull systems," International Journal of Production Economics, Elsevier, vol. 120(2), pages 418-429, August.
- Mascolo, Maria Di, 1996. "Analysis of a synchronization station for the performance evaluation of a kanban system with a general arrival process of demands," European Journal of Operational Research, Elsevier, vol. 89(1), pages 147-163, February.
- Andijani, A. A., 1998. "A multi-criterion approach for Kanban allocations," Omega, Elsevier, vol. 26(4), pages 483-493, August.
- Yucesan, Enver & de Groote, Xavier, 2000. "Lead times, order release mechanisms, and customer service," European Journal of Operational Research, Elsevier, vol. 120(1), pages 118-130, January.
- Ahmadi, Reza H. & Matsuo, Hirofumi, 2000. "A mini-line approach for pull production," European Journal of Operational Research, Elsevier, vol. 125(2), pages 340-358, September.
- Hirakawa, Yasuhiro, 1996. "Performance of a multistage hybrid push/pull production control system," International Journal of Production Economics, Elsevier, vol. 44(1-2), pages 129-135, June.
- Houmin Yan & Xun Yu Zhou & G. Yin, 1999. "Approximating an Optimal Production Policy in a Continuous Flow Line: Recurrence and Asymptotic Properties," Operations Research, INFORMS, vol. 47(4), pages 535-549, August.
More about this item
Keywords
kanban system; production/inventory; Markov process;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:ormnsc:v:35:y:1989:i:9:p:1079-1091. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.