Performance evaluation of SCM in JIT environment
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Debasis Mitra & Isi Mitrani, 1991. "Analysis of a Kanban Discipline for Cell Coordination in Production Lines, II: Stochastic Demands," Operations Research, INFORMS, vol. 39(5), pages 807-823, October.
- Debasis Mitra & Isi Mitrani, 1990. "Analysis of a Kanban Discipline for Cell Coordination in Production Lines. I," Management Science, INFORMS, vol. 36(12), pages 1548-1566, December.
- Sridhar R. Tayur, 1993. "Structural Properties and a Heuristic for Kanban-Controlled Serial Lines," Management Science, INFORMS, vol. 39(11), pages 1347-1368, November.
- Jean-Luc Deleersnyder & Thom J. Hodgson & Henri Muller-Malek & Peter J. O'Grady, 1989. "Kanban Controlled Pull Systems: An Analytic Approach," Management Science, INFORMS, vol. 35(9), pages 1079-1091, September.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Garcia, Fernanda A. & Marchetta, Martin G. & Camargo, Mauricio & Morel, Laure & Forradellas, Raymundo Q., 2012. "A framework for measuring logistics performance in the wine industry," International Journal of Production Economics, Elsevier, vol. 135(1), pages 284-298.
- Andreas C. Nearchou, 2018. "Multicriteria scheduling optimization using an elitist multiobjective population heuristic: the h-NSDE algorithm," Journal of Heuristics, Springer, vol. 24(6), pages 817-851, December.
- Om Prakash Mishra & Vikas Kumar & Dixit Garg, 2018. "Performance evaluation of JIT enabled SCM using ANP method," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 9(2), pages 547-558, April.
- Walker, Nathan L. & Styles, David & Coughlan, Paul & Williams, A. Prysor, 2022. "Cross-sector sustainability benchmarking of major utilities in the United Kingdom," Utilities Policy, Elsevier, vol. 78(C).
- Lo, Chris K.Y. & Yeung, Andy C.L. & Cheng, T.C.E., 2009. "ISO 9000 and supply chain efficiency: Empirical evidence on inventory and account receivable days," International Journal of Production Economics, Elsevier, vol. 118(2), pages 367-374, April.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Kim, Ilhyung & Tang, Christopher S., 1997. "Lead time and response time in a pull production control system," European Journal of Operational Research, Elsevier, vol. 101(3), pages 474-485, September.
- Zhao Xiaobo & Qiguo Gong & Kenichi Nakashima, 2001. "Analysis of a production system in a general configuration," Naval Research Logistics (NRL), John Wiley & Sons, vol. 48(2), pages 128-143, March.
- Ou, Jihong & Jiang, Jiong, 1997. "Yield comparison of push and pull control methods on production systems with unreliable machines," International Journal of Production Economics, Elsevier, vol. 50(1), pages 1-12, May.
- Papadopoulos, H. T. & Heavey, C., 1996. "Queueing theory in manufacturing systems analysis and design: A classification of models for production and transfer lines," European Journal of Operational Research, Elsevier, vol. 92(1), pages 1-27, July.
- Askin, Ronald G. & Krishnan, Shravan, 2009. "Defining inventory control points in multiproduct stochastic pull systems," International Journal of Production Economics, Elsevier, vol. 120(2), pages 418-429, August.
- Houmin Yan & Xun Yu Zhou & G. Yin, 1999. "Approximating an Optimal Production Policy in a Continuous Flow Line: Recurrence and Asymptotic Properties," Operations Research, INFORMS, vol. 47(4), pages 535-549, August.
- Iwase, Masaharu & Ohno, Katsuhisa, 2011. "The performance evaluation of a multi-stage JIT production system with stochastic demand and production capacities," European Journal of Operational Research, Elsevier, vol. 214(2), pages 216-222, October.
- Mascolo, Maria Di, 1996. "Analysis of a synchronization station for the performance evaluation of a kanban system with a general arrival process of demands," European Journal of Operational Research, Elsevier, vol. 89(1), pages 147-163, February.
- Andijani, A. A., 1998. "A multi-criterion approach for Kanban allocations," Omega, Elsevier, vol. 26(4), pages 483-493, August.
- Zipkin, Paul, 1995. "Processing networks with planned inventories: Tandem queues with feedback," European Journal of Operational Research, Elsevier, vol. 80(2), pages 344-349, January.
- Cigdem Gurgur, 2013. "Optimal configuration of a decentralized, market-driven production/inventory system," Annals of Operations Research, Springer, vol. 209(1), pages 139-157, October.
- Takahashi, Katsuhiko & Morikawa, Katsumi & Nakamura, Nobuto, 2004. "Reactive JIT ordering system for changes in the mean and variance of demand," International Journal of Production Economics, Elsevier, vol. 92(2), pages 181-196, November.
- Mark Vroblefski & R. Ramesh & Stanley Zionts, 2000. "General Open and Closed Queueing Networks with Blocking: A Unified Framework for Approximation," INFORMS Journal on Computing, INFORMS, vol. 12(4), pages 299-316, November.
- Cigdem Z. Gurgur & Tayfur Altiok, 2007. "Analysis of decentralized multi‐product pull systems with lost sales," Naval Research Logistics (NRL), John Wiley & Sons, vol. 54(4), pages 357-370, June.
- Albino, Vito & Dassisti, Michele & O. Okogbaa, Geoffrey, 1995. "Approximation approach for the performance analysis of production lines under a kanban discipline," International Journal of Production Economics, Elsevier, vol. 40(2-3), pages 197-207, August.
- Subba Rao, S. & Gunasekaran, A. & Goyal, S. K. & Martikainen, T., 1998. "Waiting line model applications in manufacturing," International Journal of Production Economics, Elsevier, vol. 54(1), pages 1-28, January.
- Wilhelm, W. E. & Som, Pradip, 1998. "Analysis of a single-stage, single-product, stochastic, MRP-controlled assembly system," European Journal of Operational Research, Elsevier, vol. 108(1), pages 74-93, July.
- Alfieri, Arianna & Matta, Andrea, 2012. "Mathematical programming formulations for approximate simulation of multistage production systems," European Journal of Operational Research, Elsevier, vol. 219(3), pages 773-783.
- Yucesan, Enver & de Groote, Xavier, 2000. "Lead times, order release mechanisms, and customer service," European Journal of Operational Research, Elsevier, vol. 120(1), pages 118-130, January.
- Hirakawa, Yasuhiro, 1996. "Performance of a multistage hybrid push/pull production control system," International Journal of Production Economics, Elsevier, vol. 44(1-2), pages 129-135, June.
More about this item
Keywords
JIT Kanban control Performance evaluation Stochastic model;Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:115:y:2008:i:2:p:439-443. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.