Parallel machine replacement
Author
Abstract
Suggested Citation
DOI: 10.1002/1520-6750(199106)38:33.0.CO;2-U
Download full text from publisher
References listed on IDEAS
- Suresh Sethi & Suresh Chand, 1979. "Planning Horizon Procedures for Machine Replacement Models," Management Science, INFORMS, vol. 25(2), pages 140-151, February.
- James C. Bean & Robert L. Smith, 1984. "Conditions for the Existence of Planning Horizons," Mathematics of Operations Research, INFORMS, vol. 9(3), pages 391-401, August.
- William P. Pierskalla & John A. Voelker, 1976. "A survey of maintenance models: The control and surveillance of deteriorating systems," Naval Research Logistics Quarterly, John Wiley & Sons, vol. 23(3), pages 353-388, September.
- P. S. Davis & T. L. Ray, 1969. "A branch‐bound algorithm for the capacitated facilities location problem," Naval Research Logistics Quarterly, John Wiley & Sons, vol. 16(3), pages 331-344, September.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Zhang, Le & Gu, Weihua & Fu, Liangliang & Mei, Yu & Hu, Yaohua, 2021. "A two-stage heuristic approach for fleet management optimization under time-varying demand," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 147(C).
- Tim McClurg & Suresh Chand, 2002. "A parallel machine replacement model," Naval Research Logistics (NRL), John Wiley & Sons, vol. 49(3), pages 275-287, April.
- Peiling Wu & Joseph C. Hartman & George R. Wilson, 2005. "An Integrated Model and Solution Approach for Fleet Sizing with Heterogeneous Assets," Transportation Science, INFORMS, vol. 39(1), pages 87-103, February.
- Joseph C. Hartman, 2000. "The parallel replacement problem with demand and capital budgeting constraints," Naval Research Logistics (NRL), John Wiley & Sons, vol. 47(1), pages 40-56, February.
- Giovanni Pantuso & Kjetil Fagerholt & Stein W. Wallace, 2016. "Uncertainty in Fleet Renewal: A Case from Maritime Transportation," Transportation Science, INFORMS, vol. 50(2), pages 390-407, May.
- Hongmin Li & Stephen C. Graves & Woonghee Tim Huh, 2014. "Optimal Capacity Conversion for Product Transitions Under High Service Requirements," Manufacturing & Service Operations Management, INFORMS, vol. 16(1), pages 46-60, February.
- Shields, Brett A. & Seif, Javad & Yu, Andrew Junfang, 2019. "Parallel machine replacement with shipping decisions," International Journal of Production Economics, Elsevier, vol. 218(C), pages 62-71.
- Suzanne Childress & Pablo Durango‐Cohen, 2005. "On parallel machine replacement problems with general replacement cost functions and stochastic deterioration," Naval Research Logistics (NRL), John Wiley & Sons, vol. 52(5), pages 409-419, August.
- Paul R. Kleindorfer & Andrei Neboian & Alain Roset & Stefan Spinler, 2012. "Fleet Renewal with Electric Vehicles at La Poste," Interfaces, INFORMS, vol. 42(5), pages 465-477, October.
- Wallace J. Hopp & Philip C. Jones & James L. Zydiak, 1993. "A further note on parallel machine replacement," Naval Research Logistics (NRL), John Wiley & Sons, vol. 40(4), pages 575-579, June.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Wallace J. Hopp & Suresh K. Nair, 1991. "Timing replacement decisions under discontinuous technological change," Naval Research Logistics (NRL), John Wiley & Sons, vol. 38(2), pages 203-220, April.
- Suresh Chand & Vernon Ning Hsu & Suresh Sethi, 2002. "Forecast, Solution, and Rolling Horizons in Operations Management Problems: A Classified Bibliography," Manufacturing & Service Operations Management, INFORMS, vol. 4(1), pages 25-43, September.
- Awi Federgruen & Michal Tzur, 1996. "Detection of minimal forecast horizons in dynamic programs with multiple indicators of the future," Naval Research Logistics (NRL), John Wiley & Sons, vol. 43(2), pages 169-189, March.
- S. Bylka & S. Sethi & G. Sorger, 1992. "Minimal forecast horizons in equipment replacement models with multiple technologies and general switching costs," Naval Research Logistics (NRL), John Wiley & Sons, vol. 39(4), pages 487-507, June.
- Rommert Dekker & Eric Smeitink, 1994.
"Preventive maintenance at opportunities of restricted duration,"
Naval Research Logistics (NRL), John Wiley & Sons, vol. 41(3), pages 335-353, April.
- Dekker, R. & Smeitink, E., 1991. "Preventive maintenance at opportunities of restricted duration," Serie Research Memoranda 0038, VU University Amsterdam, Faculty of Economics, Business Administration and Econometrics.
- Joseph B. Mazzola & Robert H. Schantz, 1997. "Multiple‐facility loading under capacity‐based economies of scope," Naval Research Logistics (NRL), John Wiley & Sons, vol. 44(3), pages 229-256, April.
- Bauer, L. & Mumey, G.A. & Lohr, W., 1989. "Economic Replacement Strategies for Dairy Cattle," Project Report Series 232069, University of Alberta, Department of Resource Economics and Environmental Sociology.
- Yatsenko, Yuri & Hritonenko, Natali, 2017. "Machine replacement under evolving deterministic and stochastic costs," International Journal of Production Economics, Elsevier, vol. 193(C), pages 491-501.
- Maryam Shoaeinaeini & Kannan Govindan & Donya Rahmani, 2022. "Pricing policy in green supply chain design: the impact of consumer environmental awareness and green subsidies," Operational Research, Springer, vol. 22(4), pages 3989-4028, September.
- F. A. Van Der Duyn Schouten & P. Wartenhorst, 1993. "A two‐machine repair model with variable repair rate," Naval Research Logistics (NRL), John Wiley & Sons, vol. 40(4), pages 495-523, June.
- Michael Bastian, 1992. "A perfect lot‐tree procedure for the discounted dynamic lot‐size problem with speculation," Naval Research Logistics (NRL), John Wiley & Sons, vol. 39(5), pages 651-668, August.
- Dmitry BANNIKOV & Nina SIRINA & Alexander SMOLYANINOV, 2018. "Model Of The Maintenance And Repair System In Service Maintenance Management," Transport Problems, Silesian University of Technology, Faculty of Transport, vol. 13(3), pages 5-14, September.
- James Flynn & Chia‐Shin Chung, 2002. "A branch and bound algorithm for computing optimal replacement policies in consecutive k‐out‐of‐n‐systems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 49(3), pages 288-302, April.
- Wang, Wei & Wu, Zhiying & Xiong, Junlin & Xu, Yaofeng, 2018. "Redundancy optimization of cold-standby systems under periodic inspection and maintenance," Reliability Engineering and System Safety, Elsevier, vol. 180(C), pages 394-402.
- James C. Bean & Jack R. Lohmann & Robert L. Smith, 1994. "Equipment replacement under technological change," Naval Research Logistics (NRL), John Wiley & Sons, vol. 41(1), pages 117-128, February.
- Chand, Suresh & McClurg, Tim & Ward, Jim, 2000. "A model for parallel machine replacement with capacity expansion," European Journal of Operational Research, Elsevier, vol. 121(3), pages 519-531, March.
- Wallace J. Hopp & Yar‐Lin Kuo, 1998. "Heuristics for multicomponent joint replacement: Applications to aircraft engine maintenance," Naval Research Logistics (NRL), John Wiley & Sons, vol. 45(5), pages 435-458, August.
- Scholl, Joachim & Boysen, Nils & Scholl, Armin, 2023. "E-platooning: Optimizing platoon formation for long-haul transportation with electric commercial vehicles," European Journal of Operational Research, Elsevier, vol. 304(2), pages 525-542.
- Yatsenko, Yuri & Hritonenko, Natali, 2008. "Properties of optimal service life under technological change," International Journal of Production Economics, Elsevier, vol. 114(1), pages 230-238, July.
- Lisa M. Maillart & Xiang Fang, 2006. "Optimal maintenance policies for serial, multi‐machine systems with non‐instantaneous repairs," Naval Research Logistics (NRL), John Wiley & Sons, vol. 53(8), pages 804-813, December.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:wly:navres:v:38:y:1991:i:3:p:351-365. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Wiley Content Delivery (email available below). General contact details of provider: https://doi.org/10.1002/(ISSN)1520-6750 .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.