Construction Schedule Risk Assessment and Management Strategy for Foreign General Contractors Working in the Ethiopian Construction Industry

Author

Listed:
  • Min-Yuan Cheng

    (Department of Civil and Construction Engineering, National Taiwan University of Science and Technology, Taipei 106335, Taiwan)

  • Mohammadzen Hasan Darsa

    (Department of Civil and Construction Engineering, National Taiwan University of Science and Technology, Taipei 106335, Taiwan)

Abstract

Construction project schedule delay is a worldwide concern and especially severe in the Ethiopian construction industry. This study developed a Construction Schedule Risk Assessment Model (CSRAM) and a management strategy for foreign general contractors (FGCs). 94 construction projects with schedule delay were collected and a questionnaire survey of 75 domain experts was conducted to systematically select 22 risk factors. In CSRAM, the artificial neural network (ANN) inference model was developed to predict the project schedule delay. Integrating it with the Garson algorithm (GA), the relative weights of risk factors with rankings were calculated and identified. For comparison, the Relative Importance Index (RII) method was also applied to rank the risk factors. Management strategies were developed to improve the three highest-ranked factors identified using the GA (change order, corruption/bribery, and delay in payment), and the RII (poor resource management, corruption/bribery, and delay in material delivery). Moreover, the improvement results were used as inputs for the trained ANN to conduct a sensitivity analysis. The findings of this study indicate that improvements in the factors that considerably affect the construction schedule can significantly reduce construction schedule delays. This study acts as an important reference for FGCs who plan to enter or work in the Ethiopian construction industry.

Suggested Citation

  • Min-Yuan Cheng & Mohammadzen Hasan Darsa, 2021. "Construction Schedule Risk Assessment and Management Strategy for Foreign General Contractors Working in the Ethiopian Construction Industry," Sustainability, MDPI, vol. 13(14), pages 1-23, July.
  • Handle: RePEc:gam:jsusta:v:13:y:2021:i:14:p:7830-:d:593479
    as

    Download full text from publisher

    File URL: https://www.mdpi.com/2071-1050/13/14/7830/pdf
    Download Restriction: no

    File URL: https://www.mdpi.com/2071-1050/13/14/7830/
    Download Restriction: no
    ---><---

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Seyed Ashkan Zarghami, 2024. "The Labyrinth of Corruption in the Construction Industry: A System Dynamics Model Based on 40 Years of Research," Journal of Business Ethics, Springer, vol. 195(2), pages 335-352, November.
    2. Hossam H. Mohamed & Ahmed H. Ibrahim & Asmaa A. Soliman, 2021. "Toward Reducing Construction Project Delivery Time under Limited Resources," Sustainability, MDPI, vol. 13(19), pages 1-17, October.
    3. Al-Bataineh Fuad & Khatatbeh Ahmed Ali & Alzubi Yazan, 2024. "Unsupervised machine learning for identifying key risk factors contributing to construction delays," Organization, Technology and Management in Construction, Sciendo, vol. 16(1), pages 170-185.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jsusta:v:13:y:2021:i:14:p:7830-:d:593479. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.