A new repair model and its optimization for cold standby system
Author
Abstract
Suggested Citation
DOI: 10.1007/s12351-020-00545-x
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Zhang, Yuan Lin & Wang, Guan Jun, 2009. "A geometric process repair model for a repairable cold standby system with priority in use and repair," Reliability Engineering and System Safety, Elsevier, vol. 94(11), pages 1782-1787.
- Berrade, M.D. & Scarf, P.A. & Cavalcante, C.A.V., 2017. "A study of postponed replacement in a delay time model," Reliability Engineering and System Safety, Elsevier, vol. 168(C), pages 70-79.
- Cha, Ji Hwan & Finkelstein, Maxim, 2018. "On information-based residual lifetime in survival models with delayed failures," Statistics & Probability Letters, Elsevier, vol. 137(C), pages 209-216.
- Richard Barlow & Larry Hunter, 1960. "Optimum Preventive Maintenance Policies," Operations Research, INFORMS, vol. 8(1), pages 90-100, February.
- Zhang, Yuan Lin & Wang, Guan Jun, 2007. "A deteriorating cold standby repairable system with priority in use," European Journal of Operational Research, Elsevier, vol. 183(1), pages 278-295, November.
- Aven, Terje & Castro, I.T., 2008. "A minimal repair replacement model with two types of failure and a safety constraint," European Journal of Operational Research, Elsevier, vol. 188(2), pages 506-515, July.
- Levitin, Gregory & Finkelstein, Maxim, 2019. "Optimal loading of elements in series systems exposed to external shocks," Reliability Engineering and System Safety, Elsevier, vol. 192(C).
- Mingchih Chen & Xufeng Zhao & Toshio Nakagawa, 2019. "Replacement policies with general models," Annals of Operations Research, Springer, vol. 277(1), pages 47-61, June.
- Guan Jun Wang & Yuan Lin Zhang, 2016. "Optimal replacement policy for a two-dissimilar-component cold standby system with different repair actions," International Journal of Systems Science, Taylor & Francis Journals, vol. 47(5), pages 1021-1031, April.
- Jaturonnatee, J. & Murthy, D.N.P. & Boondiskulchok, R., 2006. "Optimal preventive maintenance of leased equipment with corrective minimal repairs," European Journal of Operational Research, Elsevier, vol. 174(1), pages 201-215, October.
- Tsai, Hsin-Nan & Sheu, Shey-Huei & Zhang, Zhe George, 2017. "A trivariate optimal replacement policy for a deteriorating system based on cumulative damage and inspections," Reliability Engineering and System Safety, Elsevier, vol. 160(C), pages 122-135.
- Shey-Huei Sheu & Suh-Huey Li & Chin-Chih Chang, 2012. "A generalised maintenance policy with age-dependent minimal repair cost for a system subject to shocks under periodic overhaul," International Journal of Systems Science, Taylor & Francis Journals, vol. 43(6), pages 1007-1013.
- Lim, J.H. & Qu, Jian & Zuo, Ming J., 2016. "Age replacement policy based on imperfect repair with random probability," Reliability Engineering and System Safety, Elsevier, vol. 149(C), pages 24-33.
- Shaomin Wu, 2018. "Doubly geometric processes and applications," Journal of the Operational Research Society, Taylor & Francis Journals, vol. 69(1), pages 66-77, January.
- Zhao, Xufeng & Al-Khalifa, Khalifa N. & Nakagawa, Toshio, 2015. "Approximate methods for optimal replacement, maintenance, and inspection policies," Reliability Engineering and System Safety, Elsevier, vol. 144(C), pages 68-73.
- W. John Braun & Wei Li & Yiqiang Q. Zhao, 2005. "Properties of the geometric and related processes," Naval Research Logistics (NRL), John Wiley & Sons, vol. 52(7), pages 607-616, October.
- Zhao, Xufeng & Nakagawa, Toshio, 2012. "Optimization problems of replacement first or last in reliability theory," European Journal of Operational Research, Elsevier, vol. 223(1), pages 141-149.
- Levitin, Gregory & Finkelstein, Maxim & Dai, Yuanshun, 2018. "Optimizing availability of heterogeneous standby systems exposed to shocks," Reliability Engineering and System Safety, Elsevier, vol. 170(C), pages 137-145.
- Tsai, Hsin-Nan & Sheu, Shey-Huei & Zhang, Zhe George, 2017. "A trivariate optimal replacement policy for a deteriorating system based on cumulative damage and inspections," Reliability Engineering and System Safety, Elsevier, vol. 160(C), pages 74-88.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Mansour Shrahili & Mohamed Kayid, 2023. "Stochastic Orderings of the Idle Time of Inactive Standby Systems," Mathematics, MDPI, vol. 11(20), pages 1-21, October.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Guan Jun Wang & Yuan Lin Zhang, 2016. "Optimal replacement policy for a two-dissimilar-component cold standby system with different repair actions," International Journal of Systems Science, Taylor & Francis Journals, vol. 47(5), pages 1021-1031, April.
- Junyuan Wang & Jimin Ye & Qianru Ma & Pengfei Xie, 2022. "An extended geometric process repairable model with its repairman having vacation," Annals of Operations Research, Springer, vol. 311(1), pages 401-415, April.
- Sheu, Shey-Huei & Tsai, Hsin-Nan & Sheu, Uan-Yu & Zhang, Zhe George, 2019. "Optimal replacement policies for a system based on a one-cycle criterion," Reliability Engineering and System Safety, Elsevier, vol. 191(C).
- de Jonge, Bram & Scarf, Philip A., 2020. "A review on maintenance optimization," European Journal of Operational Research, Elsevier, vol. 285(3), pages 805-824.
- Sheu, Shey-Huei & Liu, Tzu-Hsin & Sheu, Wei-Teng & Zhang, Zhe-George & Ke, Jau-Chuan, 2021. "Optimal replacement policy with replacement last under cumulative damage models," Reliability Engineering and System Safety, Elsevier, vol. 209(C).
- Mingjuan Sun & Qinglai Dong & Zihan Gao, 2022. "An Imperfect Repair Model with Delayed Repair under Replacement and Repair Thresholds," Mathematics, MDPI, vol. 10(13), pages 1-15, June.
- Zheng, Junjun & Okamura, Hiroyuki & Dohi, Tadashi, 2021. "Age replacement with Markovian opportunity process," Reliability Engineering and System Safety, Elsevier, vol. 216(C).
- Zhao, Xufeng & Al-Khalifa, Khalifa N. & Magid Hamouda, Abdel & Nakagawa, Toshio, 2017. "Age replacement models: A summary with new perspectives and methods," Reliability Engineering and System Safety, Elsevier, vol. 161(C), pages 95-105.
- Arnold, Richard & Chukova, Stefanka & Hayakawa, Yu & Marshall, Sarah, 2020. "Geometric-Like Processes: An Overview and Some Reliability Applications," Reliability Engineering and System Safety, Elsevier, vol. 201(C).
- Sheu, Shey-Huei & Liu, Tzu-Hsin & Zhang, Zhe-George & Tsai, Hsin-Nan, 2018. "The generalized age maintenance policies with random working times," Reliability Engineering and System Safety, Elsevier, vol. 169(C), pages 503-514.
- Sheu, Shey-Huei & Liu, Tzu-Hsin & Zhang, Zhe-George, 2019. "Extended optimal preventive replacement policies with random working cycle," Reliability Engineering and System Safety, Elsevier, vol. 188(C), pages 398-415.
- Ji Hwan Cha & Maxim Finkelstein, 2019. "Optimal preventive maintenance for systems having a continuous output and operating in a random environment," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 27(2), pages 327-350, July.
- Qinglai Dong & Lirong Cui & Hongda Gao, 2019. "A bivariate replacement policy for an imperfect repair system based on geometric processes," Journal of Risk and Reliability, , vol. 233(4), pages 670-681, August.
- Tsai, Hsin-Nan & Sheu, Shey-Huei & Zhang, Zhe George, 2017. "A trivariate optimal replacement policy for a deteriorating system based on cumulative damage and inspections," Reliability Engineering and System Safety, Elsevier, vol. 160(C), pages 74-88.
- Navarro, Jorge & Arriaza, Antonio & Suárez-Llorens, Alfonso, 2019. "Minimal repair of failed components in coherent systems," European Journal of Operational Research, Elsevier, vol. 279(3), pages 951-964.
- Yevkin, Alexander & Krivtsov, Vasiliy, 2020. "A generalized model for recurrent failures prediction," Reliability Engineering and System Safety, Elsevier, vol. 204(C).
- Ahmadi, Reza & Wu, Shaomin, 2017. "A novel data-driven approach to optimizing replacement policy," Reliability Engineering and System Safety, Elsevier, vol. 167(C), pages 506-516.
- Song, Cen & Zhuang, Jun, 2017. "N-stage security screening strategies in the face of strategic applicants," Reliability Engineering and System Safety, Elsevier, vol. 165(C), pages 292-301.
- Wenke Gao, 2020. "An extended geometric process and its application in replacement policy," Journal of Risk and Reliability, , vol. 234(1), pages 88-103, February.
- Hamidi, Maryam & Szidarovszky, Ferenc & Szidarovszky, Miklos, 2016. "New one cycle criteria for optimizing preventive replacement policies," Reliability Engineering and System Safety, Elsevier, vol. 154(C), pages 42-48.
More about this item
Keywords
Geometric process; Generalized Polya Process; Cold standby system; Average cost rate; Optimization;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:operea:v:22:y:2022:i:1:d:10.1007_s12351-020-00545-x. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.