Product and process parameters determination for quality and cost
Author
Abstract
Suggested Citation
DOI: 10.1080/00207721.2012.760761
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Yu-Chung Tsao, 2013. "Combined production-maintenance decisions in situations with process deterioration," International Journal of Systems Science, Taylor & Francis Journals, vol. 44(9), pages 1692-1700.
- Chen, Chung-Ho & Lai, Min-Tsai, 2007. "Determining the optimum process mean based on quadratic quality loss function and rectifying inspection plan," European Journal of Operational Research, Elsevier, vol. 182(2), pages 755-763, October.
- Jianjun Shi & Shiyu Zhou, 2009. "Quality control and improvement for multistage systems: A survey," IISE Transactions, Taylor & Francis Journals, vol. 41(9), pages 744-753.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Chongyang Liu & Ryan Loxton & Kok Teo, 2014. "Optimal parameter selection for nonlinear multistage systems with time-delays," Computational Optimization and Applications, Springer, vol. 59(1), pages 285-306, October.
- Xiaoqin Wen & Chenhanzhi Wang, 2022. "Optimal-Quality Choice and Committed Delivery Time in Build-To-Order Supply Chain," Sustainability, MDPI, vol. 14(18), pages 1-20, September.
- Darwish, M.A. & Abdulmalek, F. & Alkhedher, M., 2013. "Optimal selection of process mean for a stochastic inventory model," European Journal of Operational Research, Elsevier, vol. 226(3), pages 481-490.
- Jinho Kim & Myong K. Jeong & Elsayed A. Elsayed, 2017. "Monitoring multistage processes with autocorrelated observations," International Journal of Production Research, Taylor & Francis Journals, vol. 55(8), pages 2385-2396, April.
- Dodd, Christopher S. & Scanlan, James & Wiseall, Steve, 2021. "Generalising optimal mean setting for any number and combination of serial and parallel manufacturing operations," International Journal of Production Economics, Elsevier, vol. 236(C).
- Lu, Biao & Chen, Zhen & Zhao, Xufeng, 2021. "Data-driven dynamic predictive maintenance for a manufacturing system with quality deterioration and online sensors," Reliability Engineering and System Safety, Elsevier, vol. 212(C).
- Chung-Ho Chen, 2010. "A note on some modified Pulak and Al-Sultan's model," Journal of Applied Statistics, Taylor & Francis Journals, vol. 37(3), pages 461-472.
- Bera, Sasadhar & Mukherjee, Indrajit, 2016. "A multistage and multiple response optimization approach for serial manufacturing system," European Journal of Operational Research, Elsevier, vol. 248(2), pages 444-452.
- Lin, Zu-Liang & Huang, Yeu-Shiang & Fang, Chih-Chiang, 2015. "Non-periodic preventive maintenance with reliability thresholds for complex repairable systems," Reliability Engineering and System Safety, Elsevier, vol. 136(C), pages 145-156.
- Kenneth J. Klassen & Reena Yoogalingam, 2019. "Appointment scheduling in multi-stage outpatient clinics," Health Care Management Science, Springer, vol. 22(2), pages 229-244, June.
- Chen-Fu Chien & Chiao-Wen Liu & Shih-Chung Chuang, 2017. "Analysing semiconductor manufacturing big data for root cause detection of excursion for yield enhancement," International Journal of Production Research, Taylor & Francis Journals, vol. 55(17), pages 5095-5107, September.
- Wei, Shuaichong & Nourelfath, Mustapha & Nahas, Nabil, 2023. "Analysis of a production line subject to degradation and preventive maintenance," Reliability Engineering and System Safety, Elsevier, vol. 230(C).
- Liu Yumin & Zhou Haofei, 2014. "MSVM Recognition Model for Dynamic Process Abnormal Pattern Based on Multi-Kernel Functions," Journal of Systems Science and Information, De Gruyter, vol. 2(5), pages 473-480, October.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:tsysxx:v:45:y:2014:i:10:p:2042-2054. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/TSYS20 .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.