IDEAS home Printed from https://ideas.repec.org/a/taf/conmgt/v30y2012i5p383-398.html
   My bibliography  Save this article

Target value design: using collaboration and a lean approach to reduce construction cost

Author

Listed:
  • Daria Zimina
  • Glenn Ballard
  • Christine Pasquire

Abstract

Target costing is an effective management technique that has been used in manufacturing for decades to achieve cost predictability during new product development. Adoption of this technique promises benefits for the construction industry as it struggles to raise the number of successful outcomes and certainty of project delivery in terms of cost, quality and time. Target value design is a management approach that takes the best features of target costing and adapts them to the peculiarities of construction. The concept of target value design is introduced based on the results of action research carried out on 12 construction projects in the USA. It has been shown that systemic application of target value design leads to significant improvement of project performance—the final cost of projects was on average 15% less than market cost. The construction industry already has approaches that have similarities with elements of the target value design process or use the same terminology, e.g. partnering and target cost contracts, cost planning, etc. Following an exploration of the similarities and differences target value design is positioned as a form of target costing for construction that offers a more reliable route to successful project outcomes.

Suggested Citation

  • Daria Zimina & Glenn Ballard & Christine Pasquire, 2012. "Target value design: using collaboration and a lean approach to reduce construction cost," Construction Management and Economics, Taylor & Francis Journals, vol. 30(5), pages 383-398, March.
  • Handle: RePEc:taf:conmgt:v:30:y:2012:i:5:p:383-398
    DOI: 10.1080/01446193.2012.676658
    as

    Download full text from publisher

    File URL: http://hdl.handle.net/10.1080/01446193.2012.676658
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/01446193.2012.676658?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Yasuhiro Monden & Kazuki Hamada, 2000. "Target Costing and Kaizen Costing in Japanese Automobile Companies," World Scientific Book Chapters, in: Japanese Cost Management, chapter 5, pages 99-122, World Scientific Publishing Co. Pte. Ltd..
    2. Yasuhiro Monden, 2000. "Japanese Cost Management," World Scientific Books, World Scientific Publishing Co. Pte. Ltd., number p159, August.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Ergo Pikas & Bárbara Pedó & Algan Tezel & Lauri Koskela & Markus Veersoo, 2022. "Digital Last Planner System Whiteboard for Enabling Remote Collaborative Design Process Planning and Control," Sustainability, MDPI, vol. 14(19), pages 1-27, September.
    2. Oluseyi Julius Adebowale & Patricia Omega Kukoyi & Iyabo Mercy Olagoke & Badmus Ademola, 2020. "Towards Improving Project Performance Indicators in South African Construction Sector," Journal of Economics and Behavioral Studies, AMH International, vol. 12(4), pages 1-12.
    3. Seunguk Na & Inkwan Paik, 2019. "Reducing Greenhouse Gas Emissions and Costs with the Alternative Structural System for Slab: A Comparative Analysis of South Korea Cases," Sustainability, MDPI, vol. 11(19), pages 1-19, September.
    4. Christine Pasquire, 2012. "Positioning Lean within an exploration of engineering construction," Construction Management and Economics, Taylor & Francis Journals, vol. 30(8), pages 673-685, April.
    5. Gabriel Jobidon & Pierre Lemieux & Robert Beauregard, 2021. "Building Information Modeling in Quebec’s Procurement for Public Infrastructure: A Case for Integrated Project Delivery," Laws, MDPI, vol. 10(2), pages 1-16, June.
    6. Gökhan Demirdöğen & Nihan Sena Diren & Hande Aladağ & Zeynep Işık, 2021. "Lean Based Maturity Framework Integrating Value, BIM and Big Data Analytics: Evidence from AEC Industry," Sustainability, MDPI, vol. 13(18), pages 1-27, September.
    7. Lauri Koskela & John Rooke & Mohan Siriwardena, 2016. "Evaluation of the Promotion of Through-Life Management in Public Private Partnerships for Infrastructure," Sustainability, MDPI, vol. 8(6), pages 1-23, June.
    8. Mohammadsoroush Tafazzoli & Ehsan Mousavi & Sharareh Kermanshachi, 2020. "Opportunities and Challenges of Green-Lean: An Integrated System for Sustainable Construction," Sustainability, MDPI, vol. 12(11), pages 1-12, May.
    9. Tobias Onshuus Malvik & Agnar Johansen & Olav Torp & Nils O. E. Olsson, 2021. "Evaluation of Target Value Delivery and Opportunity Management as Complementary Practices," Sustainability, MDPI, vol. 13(14), pages 1-19, July.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Heidrun Jander & Robert Kahlenberg & Jürgen Graßhoff, 2006. "Gewährleistungsmanagement im Entstehungszyklus eines Fahrzeugs: Weiterentwicklung des Target Costing-Konzeptes bei BMW Motorrad," Schmalenbach Journal of Business Research, Springer, vol. 58(1), pages 128-148, February.
    2. Kim Langfield‐Smith, 2008. "Strategic management accounting: how far have we come in 25 years?," Accounting, Auditing & Accountability Journal, Emerald Group Publishing Limited, vol. 21(2), pages 204-228, February.
    3. Maria E. Garbelli, 2002. "Over-Supply and Manufacturing Localization," Symphonya. Emerging Issues in Management, Niccolò Cusano University, issue 1 Market-.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:conmgt:v:30:y:2012:i:5:p:383-398. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/RCME20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.