IDEAS home Printed from https://ideas.repec.org/a/rnd/arjebs/v12y2020i4p1-12.html
   My bibliography  Save this article

Towards Improving Project Performance Indicators in South African Construction Sector

Author

Listed:
  • Oluseyi Julius Adebowale
  • Patricia Omega Kukoyi
  • Iyabo Mercy Olagoke
  • Badmus Ademola

Abstract

Despite myriad of research effort directed at improving the performance of construction projects, poor productivity, budget overruns, quality related issues, and schedule overruns have been recurring on most construction projects. As a consequence, time, cost and quality of construction, which are among the key project performance indicators (PPIs), have suffered poor performance in many construction project undertakings. While several studies have addressed these performance dependents parameters separately and collectively, the impact of political, environmental, social, technological, economical, and legal (PESTEL) related factors on the PPIs has however not been considered. The purpose of this study, therefore, is to identify PESTEL related factors, and further determine their impact on the PPIs in the South African construction industry. South African contractors, which are registered with the CIDB (Grades 5-9) were sampled and administered questionnaires to achieve the purpose of the study. The study determined that rework, poor planning, and inadequate training are most closely associated with poor performance of the PPIs. It is believed that addressing the areas of concern identified in this study would contribute to improved performance of the PPIs in South African construction, which would ultimately engender satisfaction of construction stakeholders.

Suggested Citation

  • Oluseyi Julius Adebowale & Patricia Omega Kukoyi & Iyabo Mercy Olagoke & Badmus Ademola, 2020. "Towards Improving Project Performance Indicators in South African Construction Sector," Journal of Economics and Behavioral Studies, AMH International, vol. 12(4), pages 1-12.
  • Handle: RePEc:rnd:arjebs:v:12:y:2020:i:4:p:1-12
    DOI: 10.22610/jebs.v12i4(J).3079
    as

    Download full text from publisher

    File URL: https://ojs.amhinternational.com/index.php/jebs/article/view/3079/1951
    Download Restriction: no

    File URL: https://ojs.amhinternational.com/index.php/jebs/article/view/3079
    Download Restriction: no

    File URL: https://libkey.io/10.22610/jebs.v12i4(J).3079?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    References listed on IDEAS

    as
    1. Ifte Choudhury, 2009. "The effect of political unrest on construction time for food grain warehouses in Bangladesh," Construction Management and Economics, Taylor & Francis Journals, vol. 27(7), pages 619-624.
    2. David Joaquin Delgado-Hernandez & Katherine Elizabeth Bampton & Elaine Aspinwall, 2007. "Quality function deployment in construction," Construction Management and Economics, Taylor & Francis Journals, vol. 25(6), pages 597-609.
    3. Ahmet Anil Sezer & Jan Br�chner, 2014. "The construction productivity debate and the measurement of service qualities," Construction Management and Economics, Taylor & Francis Journals, vol. 32(6), pages 565-574, June.
    4. Hassan Nasir & Hani Ahmed & Carl Haas & Paul M. Goodrum, 2014. "An analysis of construction productivity differences between Canada and the United States," Construction Management and Economics, Taylor & Francis Journals, vol. 32(6), pages 595-607, June.
    5. Hamzah Abdul-Rahman & Imran Ariff Yahya & Mohammed Ali Berawi & Low Wai Wah, 2008. "Conceptual delay mitigation model using a project learning approach in practice," Construction Management and Economics, Taylor & Francis Journals, vol. 26(1), pages 15-27.
    6. Daria Zimina & Glenn Ballard & Christine Pasquire, 2012. "Target value design: using collaboration and a lean approach to reduce construction cost," Construction Management and Economics, Taylor & Francis Journals, vol. 30(5), pages 383-398, March.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Choudhary Dhruva & Singh Priyanka & Dixit Saurav, 2024. "Impact of quality change management on civil engineering projects in India," Organization, Technology and Management in Construction, Sciendo, vol. 16(1), pages 150-169.
    2. Gökhan Demirdöğen & Nihan Sena Diren & Hande Aladağ & Zeynep Işık, 2021. "Lean Based Maturity Framework Integrating Value, BIM and Big Data Analytics: Evidence from AEC Industry," Sustainability, MDPI, vol. 13(18), pages 1-27, September.
    3. Seunguk Na & Inkwan Paik, 2019. "Reducing Greenhouse Gas Emissions and Costs with the Alternative Structural System for Slab: A Comparative Analysis of South Korea Cases," Sustainability, MDPI, vol. 11(19), pages 1-19, September.
    4. Lauri Koskela & John Rooke & Mohan Siriwardena, 2016. "Evaluation of the Promotion of Through-Life Management in Public Private Partnerships for Infrastructure," Sustainability, MDPI, vol. 8(6), pages 1-23, June.
    5. Dixit Saurav, 2021. "Impact of management practices on construction productivity in Indian building construction projects: an empirical study," Organization, Technology and Management in Construction, Sciendo, vol. 13(1), pages 2383-2390, January.
    6. Tero Kuusi & Martti Kulvik & Juha-Matti Junnonen, 2022. "Productivity Growth in Construction Value Chains," International Productivity Monitor, Centre for the Study of Living Standards, vol. 42, pages 3-32, Spring.
    7. Ergo Pikas & Bárbara Pedó & Algan Tezel & Lauri Koskela & Markus Veersoo, 2022. "Digital Last Planner System Whiteboard for Enabling Remote Collaborative Design Process Planning and Control," Sustainability, MDPI, vol. 14(19), pages 1-27, September.
    8. Mohammadsoroush Tafazzoli & Ehsan Mousavi & Sharareh Kermanshachi, 2020. "Opportunities and Challenges of Green-Lean: An Integrated System for Sustainable Construction," Sustainability, MDPI, vol. 12(11), pages 1-12, May.
    9. E. Adinyira & T. E. Kwofie & F. Quarcoo, 2018. "Stakeholder requirements for building energy efficiency in mass housing delivery: the House of Quality approach," Environment, Development and Sustainability: A Multidisciplinary Approach to the Theory and Practice of Sustainable Development, Springer, vol. 20(3), pages 1115-1131, June.
    10. Gabriel Jobidon & Pierre Lemieux & Robert Beauregard, 2021. "Building Information Modeling in Quebec’s Procurement for Public Infrastructure: A Case for Integrated Project Delivery," Laws, MDPI, vol. 10(2), pages 1-16, June.
    11. Amirhosein Jafari, 2013. "A contractor pre-qualification model based on the quality function deployment method," Construction Management and Economics, Taylor & Francis Journals, vol. 31(7), pages 746-760, July.
    12. Hamzah Abdul-Rahman & Ali Mohammed Alashwal & Zatil Hidayah Jamaludin, 2011. "Implementation and Methods of Project Learning in Quantity Surveying Firms: Barriers, Enablers and Success Factors," American Journal of Economics and Business Administration, Science Publications, vol. 3(3), pages 430-438, September.
    13. Christine Pasquire, 2012. "Positioning Lean within an exploration of engineering construction," Construction Management and Economics, Taylor & Francis Journals, vol. 30(8), pages 673-685, April.
    14. Kuusi, Tero & Junnonen, Juha-Matti & Kulvik, Martti, 2020. "Construction Value Chains and Their Productivity Growth," ETLA Working Papers 79, The Research Institute of the Finnish Economy.
    15. Tobias Onshuus Malvik & Agnar Johansen & Olav Torp & Nils O. E. Olsson, 2021. "Evaluation of Target Value Delivery and Opportunity Management as Complementary Practices," Sustainability, MDPI, vol. 13(14), pages 1-19, July.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:rnd:arjebs:v:12:y:2020:i:4:p:1-12. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Muhammad Tayyab (email available below). General contact details of provider: https://ojs.amhinternational.com/index.php/jebs .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.