IDEAS home Printed from https://ideas.repec.org/a/taf/conmgt/v24y2006i12p1231-1239.html
   My bibliography  Save this article

Approximately predicting the cost and duration of school reconstruction projects in Taiwan

Author

Listed:
  • Wei Tong Chen
  • Ying-Hua Huang

Abstract

Regression and neural network models have been developed to predict the cost and duration of projects for the reconstruction of schools which must be quickly rebuilt. Data for the school reconstruction projects in central Taiwan, which received the most serious damage from the Chi-Chi Earthquake, were collected and analysed. The analytical results demonstrate that the floor area provides a good basis for estimating the cost and duration of school reconstruction projects, and suggest that the neural network model with back-propagation learning technique is a feasible approach that yields better prediction results than the regression model for school reconstruction projects.

Suggested Citation

  • Wei Tong Chen & Ying-Hua Huang, 2006. "Approximately predicting the cost and duration of school reconstruction projects in Taiwan," Construction Management and Economics, Taylor & Francis Journals, vol. 24(12), pages 1231-1239.
  • Handle: RePEc:taf:conmgt:v:24:y:2006:i:12:p:1231-1239
    DOI: 10.1080/01446190600953805
    as

    Download full text from publisher

    File URL: http://www.tandfonline.com/doi/abs/10.1080/01446190600953805
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/01446190600953805?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Trefor Williams, 2002. "Predicting completed project cost using bidding data," Construction Management and Economics, Taylor & Francis Journals, vol. 20(3), pages 225-235.
    2. Albert Chan, 1999. "Modelling building durations in Hong Kong," Construction Management and Economics, Taylor & Francis Journals, vol. 17(2), pages 189-196.
    3. Daniel Chan & Mohan Kumaraswamy, 1999. "Modelling and predicting construction durations in Hong Kong public housing," Construction Management and Economics, Taylor & Francis Journals, vol. 17(3), pages 351-362.
    4. Margaret Emsley & David Lowe & A. Roy Duff & Anthony Harding & Adam Hickson, 2002. "Data modelling and the application of a neural network approach to the prediction of total construction costs," Construction Management and Economics, Taylor & Francis Journals, vol. 20(6), pages 465-472.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Vitor Sousa & Inês Meireles, 2018. "The Influence of the Construction Technology in Time-Cost Relationships of Sewerage Projects," Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), Springer;European Water Resources Association (EWRA), vol. 32(8), pages 2753-2766, June.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. D. R. Ogunsemi & G. O. Jagboro, 2006. "Time-cost model for building projects in Nigeria," Construction Management and Economics, Taylor & Francis Journals, vol. 24(3), pages 253-258.
    2. P. Velumani & N. V. N. Nampoothiri & M. Urbański, 2021. "A Comparative Study of Models for the Construction Duration Prediction in Highway Road Projects of India," Sustainability, MDPI, vol. 13(8), pages 1-13, April.
    3. Kim Young Joo & Skibniewski Miroslaw J., 2020. "Unsuccessful bids: Coefficient of variation of bids as indicator of project risk," Organization, Technology and Management in Construction, Sciendo, vol. 12(1), pages 2193-2199, January.
    4. Phattara Khumprom & Nita Yodo, 2019. "A Data-Driven Predictive Prognostic Model for Lithium-ion Batteries based on a Deep Learning Algorithm," Energies, MDPI, vol. 12(4), pages 1-21, February.
    5. John M. Kamara & Oliver Heidrich & Vincenza E. Tafaro & Sebastiano Maltese & Mario C. Dejaco & Fulvio Re Cecconi, 2020. "Change Factors and the Adaptability of Buildings," Sustainability, MDPI, vol. 12(16), pages 1-18, August.
    6. Chou, Jui-Sheng & Tai, Yian & Chang, Lian-Ji, 2010. "Predicting the development cost of TFT-LCD manufacturing equipment with artificial intelligence models," International Journal of Production Economics, Elsevier, vol. 128(1), pages 339-350, November.
    7. Swei, Omar & Gregory, Jeremy & Kirchain, Randolph, 2017. "Construction cost estimation: A parametric approach for better estimates of expected cost and variation," Transportation Research Part B: Methodological, Elsevier, vol. 101(C), pages 295-305.
    8. Agnieszka Leśniak & Krzysztof Zima, 2018. "Cost Calculation of Construction Projects Including Sustainability Factors Using the Case Based Reasoning (CBR) Method," Sustainability, MDPI, vol. 10(5), pages 1-14, May.
    9. Hakami Waled & Hassan Awad, 2019. "Preliminary Construction Cost Estimate in Yemen by Artificial Neural Network," Baltic Journal of Real Estate Economics and Construction Management, Sciendo, vol. 7(1), pages 110-122, January.
    10. Ivan Damnjanovic & Xue Zhou, 2009. "Impact of crude oil market behaviour on unit bid prices: the evidence from the highway construction sector," Construction Management and Economics, Taylor & Francis Journals, vol. 27(9), pages 881-890.
    11. Yu Zhang & Eric J Miller, 2023. "Predicting housing construction period based on a cox proportional hazard model––an empirical study of housing completions in the greater Toronto and Hamilton area," Environment and Planning B, , vol. 50(6), pages 1624-1644, July.
    12. Zangeneh, Pouya & McCabe, Brenda, 2022. "Modelling socio-technical risks of industrial megaprojects using Bayesian Networks and reference classes," Resources Policy, Elsevier, vol. 79(C).
    13. Onur Dursun & Christian Stoy, 2011. "Time-cost relationship of building projects: statistical adequacy of categorization with respect to project location," Construction Management and Economics, Taylor & Francis Journals, vol. 29(1), pages 97-106.
    14. Michał Juszczyk & Agnieszka Leśniak & Krzysztof Zima, 2018. "ANN Based Approach for Estimation of Construction Costs of Sports Fields," Complexity, Hindawi, vol. 2018, pages 1-11, March.
    15. Qiao, Yu & Fricker, Jon D. & Labi, Samuel, 2019. "Effects of bundling policy on project cost under market uncertainty: A comparison across different highway project types," Transportation Research Part A: Policy and Practice, Elsevier, vol. 130(C), pages 606-625.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:conmgt:v:24:y:2006:i:12:p:1231-1239. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/RCME20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.