IDEAS home Printed from https://ideas.repec.org/a/taf/conmgt/v17y1999i3p351-362.html
   My bibliography  Save this article

Modelling and predicting construction durations in Hong Kong public housing

Author

Listed:
  • Daniel Chan
  • Mohan Kumaraswamy

Abstract

Construction time performance is provoking world-wide concern and discussion within the industry. This paper reports the results of a survey in the fourth stage of an investigation seeking to identify a set of significant variables influencing construction durations of projects in Hong Kong, the stage addressing the formulation of standard norms for overall construction durations of public housing projects by modelling the primary work packages in the building process, namely piling, pile caps/raft, superstructure, E&M services, finishes and their respective sequential start-start lag times, on the basis of the identified groups of critical factors. Data were collected from a sample of 56 standard 'Harmony' type domestic blocks of the Hong Kong Housing Authority; (the 'Harmony' series of block design having become popular for average quality public housing blocks in the 1990s, ranging from 30 to 40 storeys and containing about 16 residential units on each floor). These data were analysed through a series of multiple linear regression exercises that helped to establish the time prediction model. This model was then tested and validated using information from a further nine projects from the Housing Authority. Both the usefulness and shortcomings of the model are briefly presented and discussed. It is concluded that the model is applicable to the public housing industry in Hong Kong, and that the methodology used may be applied to develop similarly useful models in other subsectors, and in other countries.

Suggested Citation

  • Daniel Chan & Mohan Kumaraswamy, 1999. "Modelling and predicting construction durations in Hong Kong public housing," Construction Management and Economics, Taylor & Francis Journals, vol. 17(3), pages 351-362.
  • Handle: RePEc:taf:conmgt:v:17:y:1999:i:3:p:351-362
    DOI: 10.1080/014461999371556
    as

    Download full text from publisher

    File URL: http://www.tandfonline.com/doi/abs/10.1080/014461999371556
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/014461999371556?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. P. Velumani & N. V. N. Nampoothiri & M. Urbański, 2021. "A Comparative Study of Models for the Construction Duration Prediction in Highway Road Projects of India," Sustainability, MDPI, vol. 13(8), pages 1-13, April.
    2. Wei Tong Chen & Ying-Hua Huang, 2006. "Approximately predicting the cost and duration of school reconstruction projects in Taiwan," Construction Management and Economics, Taylor & Francis Journals, vol. 24(12), pages 1231-1239.
    3. Yu Zhang & Eric J Miller, 2023. "Predicting housing construction period based on a cox proportional hazard model––an empirical study of housing completions in the greater Toronto and Hamilton area," Environment and Planning B, , vol. 50(6), pages 1624-1644, July.
    4. D. R. Ogunsemi & G. O. Jagboro, 2006. "Time-cost model for building projects in Nigeria," Construction Management and Economics, Taylor & Francis Journals, vol. 24(3), pages 253-258.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:conmgt:v:17:y:1999:i:3:p:351-362. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/RCME20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.